OVERVIEW
REQUIREMENT:
A ramp to the entrance of the council house.
Rapid Ramp’s demountable system was ideal as it requires no groundwork.
Once no longer needed, the ramp can be removed and reinstalled at a different property owned by the local authority.
ADDITIONAL INFORMATION:
CAD drawings were produced from pictures and measurements taken by our in-house site surveyor.
The drawings were supplied to the client with their quotation.
END RESULT:
The ramp was installed within only a few hours. The system fully complies with Document M, Volume 1, Dwellings.