OVERVIEW
With the ability to power over 590,000 UK homes from a total capacity of 660 mw, Walney Extension is set to be the biggest offshore wind farm in the world when it is commissioned at the end of 2018.
The project is 100% owned by Ørsted and required a new cable corridor to be installed to its Electrical Substation near Heysham.
The Brief
Protecting Critical National Infrastructure in the Utilities Industry presents a number of challenges that had to be overcome.
CLD SlideMaster SR1 - Sliding Gate
CLD LockMaster - Swing Gate
CLD Dulok - Security Fence
CLD Securus S1 - Security Fence
Major League Baseball London Series
Folly Farm Pembrokeshire
5th Avenue New York City
Inverness COVID-19 Testing Centre
Portavadie Marina Resort: Steel louvred fencing and compounds to screen service plant and wheelie bins
Roof-top Screen at Pioneer Foodstore, Carlisle
An architect designed stand-alone cycle hub for new railway station
Louvred Screening fence for new Meadowbank Sports Centre
Upgrading physical perimeter security using 358 mesh, access control measures and crash rated systems for a water treatment plant
Hafan Y Coed Mental Health Unit
United Utilities
UCL PEARL
Trafford Park Car Dealership
Buckshaw Primary School
United Utilities
Branded Security Sliding Gates