NBS Source
I'm a manufacturer

Unity Campus, Sawston, Cambridgeshire

OVERVIEW

Project:

Unity Campus

Client:

Howard Group

Architect:

Nicholas Hare Architects

Value:

£12m

Location:

Sawston, Cambridge

Completion Date:

June 2023 Innovare duration onsite 15 Weeks

GIFA: 88,000 sq. ft

Air Tightness: 1 via passive purple U-Value 0.13 (259mm i-FAST with additional insulation by others on inside face of panel)

System:

i-FAST/Wrap Solution


Phase 2 of a new £100 million technology and R&D campus in Sawston, south Cambridge is now complete, providing an additional 90,000 sq. ft of science laboratory space across three buildings. Built on Cambridge’s reputation within life sciences, this phase enhances Unity Campus and elevates the region’s role within the industry.


Designed by Nicolas Hare architects, the building envelope is purposely designed to provide occupants with a healthy and attractive environment. Collaborative design development incorporating a concrete frame and advanced structural timber technology meant an innovative approach to the construction method could be adopted, bringing key advantages of sustainability and performance efficiency.


The Innovare Offsite i-FAST Panels were selected for construction because they minimize embodied carbon compared to steel framing systems, achieving the sustainability objectives set by the client Howard Group. Effective collaboration with the architects ensured that the client’s performance specifications were agreed well in advance of the start date.

No featured products in this case study

Contact Innovare Offsite Limited by clicking the button below to find out which products were used in this case study.

More inspiration from Innovare Offsite Limited

View inspiration
Red Kite Academy - Education

Red Kite Academy - Education

Abbey View Primary School

Abbey View Primary School

Ysgol Newydd Corn Hir

Ysgol Newydd Corn Hir

Thames Park Secondary School

Thames Park Secondary School