This site uses cookies to store information on your computer. Learn more about these cookies, and how to opt out of them. Find out more

NBS Source

Trief Containment Kerbs provide the solution for the renovation of the central reservation on a major duel carriageway in Cheshire.

OVERVIEW

Halton Borough Council had an easy decision to make in choosing Brett Landscaping to work on a key infrastructure project on the major traffic route. Brett Landscaping offered Halton Borough Council specialist advice before and during installation of their Trief Containment Kerbs at the Kingsway Central Reservation Redevelopment in Widnes. The project was to rebuild and renovate a dual carriageway’s central reservation which featured low-level walls retaining grass verges that were showing signs of damage due to a combination of weathering and rainwater pressure behind the wall. To view the whole case study please click the link below.

No featured products in this case study

Contact Brett Landscaping by clicking the button below to find out which products were used in this case study.

More case studies from Brett Landscaping

View all case studies (14)
Wales Millennium Centre

Wales Millennium Centre

Porcelain Roof Terraces, Greenford Quay, London

Porcelain Roof Terraces, Greenford Quay, London

Trief Cadet Containment Kerbs provides protection to a Victorian road bridge in North Wales.

Trief Cadet Containment Kerbs provides protection to a Victorian road bridge in North Wales.

Protection of bridge footpath and parapet with Trief GST2

Protection of bridge footpath and parapet with Trief GST2