Alpha machine lay block paving provides a beautiful and speedy solution to a tight site programme.

Alpha machine lay block paving provides a beautiful and speedy solution to a tight site programme.

Brett Landscaping

A housing development in Southminster has benefitted from having an access road installed with machine lay block paving to deliver a speedy and high quality finish in outstanding time. The access road was only 3m wide and by laying the blocks by hand, there would have been only enough room for two operatives to work side by side. This meant the entire 83m stretch of road would have taken three days to complete and would have delayed follow-on trades so the road surface needed to be completed quickly. To view the whole case study please click the link below.
Brett Landscaping's Kassel provides kerb appeal for East London Transit

Brett Landscaping's Kassel provides kerb appeal for East London Transit

Brett Landscaping

East London Transit is a rapid transport scheme that has been implemented by Transport for London to meet the demand for public transport in North East London caused by the Thames Gateway redevelopment and the 2012 Olympics. Two routes operate 24 hours a day between Thames View Estate and Ilford. Each route provides five buses an hour, Monday to Saturday during the daytime and three an hour during the evenings and Sunday; giving a combined frequency of ten buses per hour over the route from Ilford to Thames View Estate. To view the whole case study click the link below.
Brett Omega Flow permeable paving provides the SuDS for the car parks on the Sixfields leisure development in Northampton

Brett Omega Flow permeable paving provides the SuDS for the car parks on the Sixfields leisure development in Northampton

Brett Landscaping

The Sixfields development is part of the Northampton Brownfield Initiative where a permeable pavement was chosen for the car park which serves the rugby and football clubs. Sitting on the bank of the River Nene, it was evident that any design had to minimise future risk of flooding if it was to be viable. Brett advised on the use of SuDS to minimise the risk of any future flooding on the site. The two car parks, of 19,000m2 and 16,000m2 respectively, were both constructed using Omega Flow permeable paving. To view the whole case study click the link.
Heavy Duty Pavement Solution at Great Yarmouth Port

Heavy Duty Pavement Solution at Great Yarmouth Port

Brett Landscaping

Brett Landscaping's Zeta Lock concrete block paving has been used to pave part of the Outer Harbour at the Port of Great Yarmouth where 24,000m2 of paving was mechanically laid by Tolly Paving Ltd. of Colchester. Brett Landscaping specifically designed Zeta Lock to be compatible with machine lay installation to enable large scale, complex projects to be installed quickly, accurately and with minimal disruption. This is particularly important for facilities such as ports and airports, which need to remain functional for the maximum amount of time. To view the whole case study please click the link below.
Permeable paving provides the SuDS compliant solution to the car park of a distribution centre in Yorkshire

Permeable paving provides the SuDS compliant solution to the car park of a distribution centre in Yorkshire

Brett Landscaping

As part of their flood prevention strategy Bassetlaw District Council required the distribution centre to be fully SuDS compliant . Logistics and warehousing company DB Symmetry requested that the hard-landscaping for their car park must be a permeable solution, so a sustainable drainage system (SuDS) was designed. Permeable paving was chosen as a key part of the overall surface water drainage strategy as this achieved all of the requirements of the planning team, while maximising the use of the land available for the project for the client. To view the whole case study please click the link below.
Permeable paving provides the SuDS solution for a Social Housing development

Permeable paving provides the SuDS solution for a Social Housing development

Brett Landscaping

Early on in the design of this Social Housing scheme at Stump Cross, Pontefract, it was decided that only a permeable pavement would work as the SuDS solution for this development. As the existing drainage infrastructure in the area was already working close to its capacity any additional run off from this developments could cause surface water flooding. Swales and ponds were not be feasible as there was insufficient space available for them. A permeable pavement was therefore chosen as there was no additional land take involved. To view the whole case study please click the link below.
Piatto paving brings granite look to Deaconess House

Piatto paving brings granite look to Deaconess House

Brett Landscaping

Deaconess House, a former hospital, dates back to 1894 and the new development retains the frontage of the original building, with a modern construction to the rear. Given the building’s proximity to Holyrood Park, the planning conditions specified the use of indigenous stone for all paving on the project from within 20 miles of the site. However, when the contractor researched the options it was recognised that this was impractical and that Brett Landscaping's Piatto range would provide an equally effective solution to the project’s needs. View the full case study by clicking the link below.
Porcelain Roof Terraces, Greenford Quay, London

Porcelain Roof Terraces, Greenford Quay, London

Brett Landscaping

Greenford Quay is one of the UK’s largest ‘Build to Rent’ schemes with 1,965 new homes being built across seven main buildings. The aim of the development is to create a vibrant mixed-use neighbourhood at the side of the historic Grand Union canal. More than 1400m2 of GeoCeramica® has been installed across the communal areas of the £151 million Greenford Quay development, with 150m2 used to provide a highly aesthetic finish to the communal roof terrace on the tallest tower in the scheme. To view the whole case study please click the link below.
Protection of bridge footpath and parapet with Trief GST2

Protection of bridge footpath and parapet with Trief GST2

Brett Landscaping

A Bradford railway bridge near a junior school needed a proven solution to keep road users and the young pedestrians safe as part of a renovation. The solution for this project was the use of our Trief GST2 kerbs to protect both the footpath and the parapet to each side of the railway bridge and to stop vehicles from deviating onto the pavement and, ultimately, accidental incursion onto the railway lines. To view the whole case study please click on the link below.
Trief Cadet Containment Kerbs provides protection to a Victorian road bridge in North Wales.

Trief Cadet Containment Kerbs provides protection to a Victorian road bridge in North Wales.

Brett Landscaping

Trief Cadet GST1A were used across Vale Road bridge which connects the Rhyl to its rail station. Cadet offered a unique solution to protect the Victorian bridge structure without compromising the existing access across the bridge. Vale Road bridge had many design aspects which included protecting the structure from the rigours of passing traffic, without reducing the width of the carriageway available for traffic to pass and maintaining access for pedestrians. A further challenge was the effective drainage of rain water build-up to the rear of the kerbs. To view the whole case study please click the link below.
Trief Containment Kerbs provide the solution for the renovation of the central reservation on a major duel carriageway in Cheshire.

Trief Containment Kerbs provide the solution for the renovation of the central reservation on a major duel carriageway in Cheshire.

Brett Landscaping

Halton Borough Council had an easy decision to make in choosing Brett Landscaping to work on a key infrastructure project on the major traffic route. Brett Landscaping offered Halton Borough Council specialist advice before and during installation of their Trief Containment Kerbs at the Kingsway Central Reservation Redevelopment in Widnes. The project was to rebuild and renovate a dual carriageway’s central reservation which featured low-level walls retaining grass verges that were showing signs of damage due to a combination of weathering and rainwater pressure behind the wall. To view the whole case study please click the link below.
Trief Kerbs used to protect major South Yorkshire Distribution Centre.

Trief Kerbs used to protect major South Yorkshire Distribution Centre.

Brett Landscaping

The £50million development is situated on the Doncaster iPort logistics estate, and is the hub for more than 53 supermarket stores based across South Yorkshire, the Midlands and Lincolnshire. With more than 3,900 pallets leaving the site via HGV each day 2,500 Trief GST2A kerb were installed to the perimeter of the large distribution centre building, site entrance points and security booths to protect them against accidental vehicle impacts damaging the structures. To view the full case study please click the link below.
Wales Millennium Centre

Wales Millennium Centre

Brett Landscaping

Cardiff has undergone a renaissance with significant inward investment driving redevelopment of the area. One of the flagships of this redevelopment has been the Wales Millennium Centre. Given the importance of the Centre as a cultural hub for both Cardiff and the Welsh nation, it was essential that access for all users was designed in. Externally a convenient bus boarding location was factored into the design. The Brett Kassel Kerb was specified for these locations to provide the best possible access to the Centre for all users. The Kassel Kerb has become Europe’s number one bus stop kerb systems.
Watford Junction benefits from exceptional Brett paving solution

Watford Junction benefits from exceptional Brett paving solution

Brett Landscaping

Brett Landscaping has underlined its ability to bring exceptional functionality and aesthetics to commercial landscaping installations with a 1,500m2 project to upgrade the passenger interchange at Watford Junction Station, using its Piatto modular paving range. Brett Piatto modular paving in grey-toned shades of Silver Granite, Dark Granite and Dark Basalt – was chosen by the station’s operating company. London Midland, as an alternative granite aggregate solution that would combine striking aesthetics with outstanding durability. To view the whole case study please click the link below.

Showing 1-14 of 14