NBS Source
I'm a manufacturer

SuDS Scheme - Keighley West Yorkshire

OVERVIEW

To maximise the value of the tree planting,the pits were used as storm water attenuation and treatment pits, taking water from the carriageway, passing it through a stone layer on the top of the tree pit and then filtering it down through the Arborsoil Hydro soil mix provided for the root growth. The water then transferred through a clean stone layer to an underdrain to a storm water drain. This method of conveyance gives an acceptable level of pollutant removal and slows the water down so that the existing drainage network can cope with the increasingly violent storm events.

No featured products in this case study

Contact GreenBlue Urban Ltd by clicking the button below to find out which products were used in this case study.

More case studies from GreenBlue Urban Ltd

View all case studies (10)
Goldhawk Road SUDS Tree Pit

Goldhawk Road SUDS Tree Pit

Leonard Circus - ArborSystem

Leonard Circus - ArborSystem

Northwood Hills Regeneration

Northwood Hills Regeneration

Sauchiehall Street, Glasgow

Sauchiehall Street, Glasgow