OVERVIEW
Caltite System integral waterproofing concrete was used in the project to waterproof the basement slab, retaining walls, and lift pits in the New Mortuary and Laboratory, together with the base slab and retaining walls to the link tunnel, providing durable, waterproof concrete construction.
Architect: Boswell Jonston
Contractor: Dunne Group
Engineer: WSP
Products used: Everdure Caltite ( 8,862m³)
Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.
MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES
AstraZeneca Campus, Macclesfield
Westbury Hotel, Mayfair W1
Waterloo Street, Glasgow