NBS Source
I'm a manufacturer

Westbury Hotel, Mayfair W1

OVERVIEW

Caltite System integral waterproofing concrete was used in the project to waterproof the basement slab, retaining walls, capping beam, and two lift pits of the 5-star hotel in London, providing durable, waterproof concrete construction.

Architect: Morrison Design

Contractor: Sir Robert McAlpine / Realtime Civil Eng. 

Engineer: Ramboll

Products used: Caltite  (710m³)

No featured products in this case study

Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from Cementaid (UK) Ltd

View inspiration
MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES

MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES

AstraZeneca Campus, Macclesfield

AstraZeneca Campus, Macclesfield

Waterloo Street, Glasgow

Waterloo Street, Glasgow

Terrace Mount, Bournemouth

Terrace Mount, Bournemouth