OVERVIEW
Caltite System integral waterproofing concrete was used in the project to waterproof the basement slab, retaining walls, capping beam, and two lift pits of the 5-star hotel in London, providing durable, waterproof concrete construction.
Architect: Morrison Design
Contractor: Sir Robert McAlpine / Realtime Civil Eng.
Engineer: Ramboll
Products used: Caltite (710m³)
Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.
MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES
AstraZeneca Campus, Macclesfield
Waterloo Street, Glasgow
Terrace Mount, Bournemouth