REQUIREMENT:
Walkway platforms were required around the prefabricated classroom block to accommodate the varying gradients and ensure wheelchair access to each entrance. Additionally, connecting ramps were needed to provide a smooth transition to ground level.
With a tight deadline to meet, the contractor required a swift solution and a same-day initial tender submission. We were happy to deliver this promptly.
DESIGN PHASE:
Our in-house design team produced a detailed 3D model and 2D plan of the ramps and platform layout, which were included with the client’s quotation to assist with planning and approval.
A significant amount of detail was put into ensuring the ramp design worked around the canopy posts.
INSTALLATION:
The ramps and platforms were installed alongside the canopy contractor. Our project management team scheduled the ramp installation in phases to prevent any clashes between trades using the area. Effective project management ensured we remained ‘rapid’.
Furthermore, the rubber crumb surface was completed within 24 hours, allowing the project to be delivered on time without disruption.
FEATURES INCLUDED:
Contact Rapid Ramp Limited by clicking the button below to find out which products were used in this case study.
Conquest Hospital, St Leonards-on-Sea
Weigh Cabin Platform & Steps, Birmingham
Bognor Regis, West Sussex
Coca-Cola Enterprises, Wakefield