OVERVIEW
A fault-tolerant network of MxPro 5 intelligent fire panels from Advanced was chosen to protect the 3Ts Redevelopment programme at the Royal Sussex County Hospital.
A total of 36 4-loop MxPro 5 panels, 46 repeater panels and two custom-built AdSpecials panels from Advanced were installed as part of 3Ts, a construction programme to modernise the front half of the Royal Sussex County Hospital in Brighton. Phase one involved the construction of a 13-storey building with two basement levels. Incorporating all the functions of a modern hospital. The building includes a three-storey atrium reception, outpatient departments, operating theatres, wards, a teaching facility and administration facilities.
The fire system was installed by the team at Essex-based EA-RS Fire Engineering Ltd, who installed Advanced’s industry-leading MxPro 5 fire panels alongside bespoke sprinkler indication and ventilation override panels, all linked to approximately 5,000 Hochiki devices.
MxPro 5 Fire Alarm Control Panel 1-2 Loop
MxPro 5 Fire Alarm Control Panel 1 Loop
MxPro 5 Fire Alarm Control Panel 2-8 Loop
MxPro 5 Remote Display Terminal
MxPro 5 Remote Control Terminal - Large
MxPro 5 Remote Control Terminal
MxPro 5 Fire Alarm Control Panel 1-4 Loop
HMS Belfast, London
Leeds General Infirmary, West Yorkshire
University of Bristol
Residential Development, Galway, Ireland
Easy Evacuation!
New Heights!
Guinness Hits The Spot!
HMS Belfast, London