OVERVIEW

There were a number of challenges for the installation of this project, with project design changes mid-project which meant the main roof on level ten would change purpose and be used as a terraced area for the building occupants. This resulted in the installation of a glass balustrade around the perimeter fixed through the deck after the original install of the MOY Paromelt system had been completed. 

Products featured in this case study

View all products (47)
MOY Enkopur Liquid Applied Warm Roofing System - Weatherproofing & Waterproofing

MOY Enkopur Liquid Applied Warm Roofing System - Weatherproofing & Waterproofing

More case studies from MOY

View all case studies (8)
WITHINGTON GOLF CLUB * MOY LIQUID SYSTEM

WITHINGTON GOLF CLUB * MOY LIQUID SYSTEM

Canonmills Garden MOY Paro-Melt Hot Melt System

Canonmills Garden MOY Paro-Melt Hot Melt System

JUSTICE & REFORM SECTOR: HOT MELT USING MOY PARO-MELT

JUSTICE & REFORM SECTOR: HOT MELT USING MOY PARO-MELT

Mission Critical Green Roof

Mission Critical Green Roof

More case studies from Liquid-applied warm roof covering systems

View all case studies (12)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Barton Hill Academy

Barton Hill Academy

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

Beckfoot Allerton Primary School

Beckfoot Allerton Primary School