OVERVIEW
There were a number of challenges for the installation of this project, with project design changes mid-project which meant the main roof on level ten would change purpose and be used as a terraced area for the building occupants. This resulted in the installation of a glass balustrade around the perimeter fixed through the deck after the original install of the MOY Paromelt system had been completed.