NBS Source
I'm a manufacturer

Macclesfield FC - New F. Ball adhesive nets a quick result for Macclesfield FC

OVERVIEW

Players at Macclesfield FC enjoyed a speedy win thanks to the help of Styccobond F58 PLUS. The ‘no time to wait’ adhesive made quick work of the installation of LVTs and rubber floorcoverings as part of the creation of a new state-of-the-art gym at the Leasing.com stadium.

 

Flooring contractors began the project with a subfloor moisture test, which indicated high Relative Humidity (RH) levels in the subfloor, necessitating a moisture management solution to prevent excess subfloor moisture attacking floorcoverings and adhesives, potentially causing floor failure.

 

Having removed surface laitance and old paint from the concrete subfloor on the lower floor, the contractors carried out surface repairs using Stopgap 460 Exterior Repair fast-setting rapid repair mortar. A single coat of Stopgap F77 waterproof surface membrane created a barrier against the excess subfloor moisture.

 

Once the waterproof surface membrane had cured, the surface was primed using Stopgap P141 primer for non-absorbent surfaces before the company’s Red Bag self-levelling compound was applied at a thickness of 3mm to provide a perfectly smooth base for floorcoverings.  

 

Styccobond F58 PLUS was used to affix charcoal-grey, wood-effect Kährs Calder Herringbone LVTs to create a bold statement in the main weights, cardio and boxing rooms, and changing areas.

 

Throughout the gym, rubber floorcoverings were also installed at fitness stations, using the adhesive in its wet state, to provide a soft cushion underfoot for customers using the equipment.

 

Upstairs, contractors made necessary repairs, including filling day joints, before priming the subfloor, this time opting for Stopgap P131 general purpose primer. Due to high RH readings contractors applied Stopgap F78 waterproof surface membrane. Once cured, Stopgap Red Bag self-levelling compound was again used to create a base for subsequently installed LVTs, completing a premier workout area for strength and resistance and cardio machines.

Products featured in this case study

View all products (48)
Stopgap F77 - Damp Proof Membrane

Stopgap F77 - Damp Proof Membrane

Stopgap P131 - Flooring Primer

Stopgap P131 - Flooring Primer

Styccobond B95 - Flooring Adhesive

Styccobond B95 - Flooring Adhesive

Stopgap F78 - Damp Proof Membrane

Stopgap F78 - Damp Proof Membrane

Stopgap P141 - Flooring Primer

Stopgap P141 - Flooring Primer

Styccobond F58 PLUS - Flooring Adhesive

Styccobond F58 PLUS - Flooring Adhesive

Stopgap Red Bag - Smoothing Compound

Stopgap Red Bag - Smoothing Compound

Stopgap 460 Exterior Repair - Repair Mortar

Stopgap 460 Exterior Repair - Repair Mortar

More case studies from Ball, F and Co Ltd

View all case studies (56)
Birmingham City Hospital - Ante-natal clinic gets the right treatment with Styccobond F44

Birmingham City Hospital - Ante-natal clinic gets the right treatment with Styccobond F44

Christ Church Primary School - School hall fit for playtime thanks to F Ball

Christ Church Primary School - School hall fit for playtime thanks to F Ball

Christ Church School, Frome - F Ball provides adhesives masterclass at Frome school

Christ Church School, Frome - F Ball provides adhesives masterclass at Frome school

Eden Court Theatre - F. Ball products star in Eden Court theatre production

Eden Court Theatre - F. Ball products star in Eden Court theatre production

More case studies from Smoothing and levelling underlay compounds

View all case studies (30)
UltraFloor makes homeowners dream come true

UltraFloor makes homeowners dream come true

UltraFloor gets an 'A' for effort at Derbyshire School

UltraFloor gets an 'A' for effort at Derbyshire School

UltraFloor set up home at prestigious housing development

UltraFloor set up home at prestigious housing development

Houses of Parliament - London

Houses of Parliament - London

More case studies from Acrylic and methacrylate adhesives

View all case studies (4)
London Aquatic Centre - Olympic Pool

London Aquatic Centre - Olympic Pool

DAVID LLOYD LEISURE CLUB

DAVID LLOYD LEISURE CLUB

Walsall Manor Hospital - Case Study

Walsall Manor Hospital - Case Study

The Kingsmead Academy, Taunton, Somerset

The Kingsmead Academy, Taunton, Somerset

More case studies from Polymer-modified cementitious mortars

View all case studies (1)
Aquacrete Installation

Aquacrete Installation

More case studies from Liquid tanking resins

View all case studies (1)
UltraFloor makes country park renovation a walk in the park

UltraFloor makes country park renovation a walk in the park