NBS Source
I'm a manufacturer

Lidl HQ, Tolworth

OVERVIEW

Basement slab and retaining walls to be used as a car park to a new office block together with the stairwells and lift pit cores.

  • Stand-alone Caltite Concrete
  • Single level (Grade 2 and Grade 3)
  • Saved 4 weeks from the basement programme

Architect: UMC Architects

Contractor: Winvic Construction

Engineer: RPS Group

Products used: Everdure Caltite ( 2725m³)

No featured products in this case study

Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from Cementaid (UK) Ltd

View inspiration
MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES

MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES

AstraZeneca Campus, Macclesfield

AstraZeneca Campus, Macclesfield

Westbury Hotel, Mayfair W1

Westbury Hotel, Mayfair W1

Waterloo Street, Glasgow

Waterloo Street, Glasgow