Energy From Waste, Grangemouth

OVERVIEW

Caltite System integral waterproofing concrete was used in the project to waterproof the Waste Bunker Pit, the Condensate Pit, the Decantation Pit, and the Admin Building slab, ensuring durable, waterproof concrete construction at all joints, penetrations, and interfaces, and providing corrosion-resistance durability designed in accordance with Eurocode 2 (EN 1992).

Products Used: Caltite (2500m³)

No featured products in this case study

Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.