OVERVIEW
Caltite System integral waterproofing concrete was used in the project to waterproof the Waste Bunker Pit, the Condensate Pit, the Decantation Pit, and the Admin Building slab, ensuring durable, waterproof concrete construction at all joints, penetrations, and interfaces, and providing corrosion-resistance durability designed in accordance with Eurocode 2 (EN 1992).
Products Used: Caltite (2500m³)
Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.
MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES
AstraZeneca Campus, Macclesfield
Westbury Hotel, Mayfair W1
Waterloo Street, Glasgow