OVERVIEW
It was used across the three-level basement as a standalone waterproofing system, designed to withstand a 12-metre head of water and deliver robust BS 8102 Grade 3 protection for a sensitive laboratory environment.
Architect: RKD Architects
Contractor: Walls Construction
Engineer: Arup
Products Used: Caltite (3,180m³)
Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.
MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES
AstraZeneca Campus, Macclesfield
Westbury Hotel, Mayfair W1
Waterloo Street, Glasgow