Bankside Gardens

OVERVIEW

Delivering a stylish, solid and compliant solution for luxury living

 

The challenge: Matching Luxury with Safety in High-End Apartments

 

Berkeley Group St. Edward embarked on an ambitious project: Bankside Gardens, a prestigious development in Reading featuring lakefront apartments and landscaped gardens. Designing balconies and terraces that embodied elegance while adhering to stringent fire safety regulations was paramount. They needed a balcony solution that was stylish, solid and compliant, offering the peace of mind essential for luxury living.

 

Finding a balance between aesthetics and fire safety can be a challenge for specifiers and developers. RYNO's non-combustible decking systems ensure safety compliance without sacrificing design possibilities.

 

The solution: The TerraSmart® Aluminium Decking System - The Perfect Fit

 

St. Edward's search for a reliable supplier led them to RYNO. After a quick and informative discovery call, RYNO recommended the TerraSmart® Aluminium Decking system. This innovative system ticked all the boxes:

  • Unmatched Safety: IGNO Mark of Assurance guaranteed non-combustible performance, providing peace of mind.
  • Third-Party Verification: UKAS accredited testing ensured the system met the highest safety and quality standards.
  • Design Flexibility: A vast array of decking board and component combinations allowed for achieving the desired aesthetic.

 

Two days after the discovery call, our team paid a visit to the Bankside Gardens site office. Calvin and Dale from RYNO brought with them a mock-up sample of the TerraSmart system, allowing all stakeholders to see and feel the product first-hand. This hands-on approach ensured everyone was on the same page regarding design and functionality.

 

Collaborative Problem-Solving: Addressing Every Detail

 

Over the next few weeks, open communication and collaboration were key. When Delineate Design Limited were appointed for installation, it was the first time they had used the TerraSmart system, so the RYNO team worked closely with them and the St. Edward team to address every detail throughout the process. This comprehensive support ensured a smooth and successful installation.

  • Accommodating Weight Requirements: Balcony weight limitations were discussed, and the TerraSmart system's lightweight properties were confirmed as a perfect fit.
  • Addressing Wind Concerns: The risk of wind uplift and furniture movement on balconies was a crucial consideration. RYNO's solution? The ingenious FA Furniture Anchor. This easy-to-install, stainless steel anchor securely fastens furniture to the decking, preventing windblown mishaps and ensuring safety on balconies and terraces.
  • Optimizing Edge Details and Interfaces: RYNO collaborated with the design team to ensure smooth transitions between the decking system and adjoining surfaces, creating a clean and aesthetically pleasing finish.
  • Maximizing Efficiency: RYNO's expertise in system design came into play. We shared best practices for layout optimization to ensure efficient use of space and materials.
  • Minimizing Waste: Sustainability is a priority at RYNO. We provided recommendations to minimize offcuts and wastage during installation, reducing environmental impact and reducing the material costs on the project.
  • Ensuring a Flawless Finish: To guarantee a perfect end result, we collaborated on a plan for addressing any minor snags or imperfections that might arise during installation, ensuring a flawless final product.
  • Overcoming the Roof Access Challenge: The project presented a unique challenge: the cage used to lift materials to the roof areas had a limited length of 3200mm. To accommodate this all the decking boards were pre-cut to 3000mm to ensure they fit within the cage constraints, avoiding delays and ensuring a smooth installation process.

 

Real Results: Achieving a Stunning and Peaceful Outdoor Space

With meticulous planning and clear communication, RYNO ensured a smooth production process and delivery according to Delineate's installation schedule. The TerraSmart system's ease of use allowed for a swift and successful installation phase.

The final product speaks for itself. The balconies and terraces boast a beautiful ADB60 25mm Decking Board in RAL 7039 (Quartz Grey) with matching E and L Termination Profiles, complemented by DS75 75mm Aluminium Joists, RD-FR4 Non-Combustible Adjustable Joist Support Pedestals, and FA Furniture Anchors.

 

A Note from Delineate Design Limited (placeholder):

"RYNO provided an excellent service assisting with design, and an efficient and prompt supply of all decking components needed. I’d recommend them to others. " Paul Newman, Delineate Design Limited

 

Through close collaboration and meticulous attention to detail, RYNO helped Delineate Design achieve St. Edward’s vision for Bankside Gardens, creating a luxurious living space with stunning and safe outdoor areas, giving residents outstanding quality and peace of mind. 

Products featured in this case study

View all products (25)
Aluminium Decking System, Free Drainage - BalcaSmart® IGNO - Non-Combustible Balcony Decking System

Aluminium Decking System, Free Drainage - BalcaSmart® IGNO - Non-Combustible Balcony Decking System

More inspiration from RYNO

View inspiration
Island Point Apartments, London

Island Point Apartments, London

Case Study: M7 Roof Terrace

Case Study: M7 Roof Terrace

Wood Wharf A2/A3 Roof Terraces, Canary Wharf

Wood Wharf A2/A3 Roof Terraces, Canary Wharf

Caledonian Road Apartments, London

Caledonian Road Apartments, London

More inspiration from Decking systems

View inspiration
A three-in-one adjustable pedestal for paving and decking

A three-in-one adjustable pedestal for paving and decking

Ceramic tile rail substructure system

Ceramic tile rail substructure system

Private Residence, London

Private Residence, London

Timber Wharf

Timber Wharf