OVERVIEW

Of all our refurbishment projects, this one was one of the smoothest in its deployment, and amongst the most exciting & rewarding in its outcome.


Lee Valley is a 10,000-acre (40 km2) Regional Park that offers sporting & outdoor activities, as well as the unique opportunity to get close to nature, learning & exploring its natural surroundings, gardens, and nature reserves.


The Lee Valley White-Water Centre, officially opened on 9 December 2010 by Anne, Princess Royal, was constructed to host the slalom events during the London 2012 Olympic Games, and still hosts international events, attracting visitors from across the globe. Since 2012, Lee Valley has hosted the World Championships and two World Cups.


In 2023, the ICF Canoe Slalom World Championships will attract over 300 of the world's top athletes to the Lee Valley White Water Centre.


A local contractor who knew RYNO was impressed by our composite decking, our service & reputation, and introduced us to the project manager of Lee Valley Park Authority.


The project was a full refurb of The Terrace which had an ageing & poorly installed wooden decking and a damaged waterproofing membrane that was leaking through to areas underneath. Some of the boards had already been removed to inspect the damage and reveal the extent of the work that needed to be undertaken. Such was the state of the decking that the area had been cordoned off and the café was unable to make use of this space!


What was required was a like-for-like replacement aesthetically, which is why we selected & installed our TerraSmart™ Composite system, featuring our Classic Decking Boards, supported by high-load bearing aluminium substructure & RDA-C ‘Clip-on’ Self-levelling Adjustable Decking Pedestal, ideal for terraces subject to high foot traffic.


We recommended Valley Provincial as installers who stated: "The TerraSmart decking system was the perfect choice for this project. The system’s ease of installation enabled our site teams to make excellent progress. From pricing through to delivery, Ryno where very supportive and we look forward to installing their decking system on future projects."


The entire project was delivered on budget, on time, and, of course, by the deadline for the next event!

Products featured in this case study

View all products (19)
Composite Decking System - TerraSmart®

Composite Decking System - TerraSmart®

Composite Decking Boards - RYNO

Composite Decking Boards - RYNO

More case studies from RYNO

View all case studies (36)
Island Point Apartments, London

Island Point Apartments, London

Case Study: M7 Roof Terrace

Case Study: M7 Roof Terrace

Wood Wharf A2/A3 Roof Terraces, Canary Wharf

Wood Wharf A2/A3 Roof Terraces, Canary Wharf

Caledonian Road Apartments, London

Caledonian Road Apartments, London

More case studies from Decking systems

View all case studies (14)
A three-in-one adjustable pedestal for paving and decking

A three-in-one adjustable pedestal for paving and decking

Ceramic tile rail substructure system

Ceramic tile rail substructure system

Private Residence, London

Private Residence, London

London Dock Blocks C2 & C3, London SE1

London Dock Blocks C2 & C3, London SE1

More case studies from Wood-plastics composite deck boards

View all case studies (9)
Clockwork Building Rooftop Balcony Decking

Clockwork Building Rooftop Balcony Decking

Union Wharf, Greenwich, London

Union Wharf, Greenwich, London

31 Underwood Street, Hoxton, London

31 Underwood Street, Hoxton, London

Bureau, 90 Fetter Lane, London, EC4

Bureau, 90 Fetter Lane, London, EC4