OVERVIEW
Located in the Royal Borough of Kensington and Chelsea; one of London’s most prestigious locations is now home to an exclusive collection of luxury apartments and penthouses. 375 Kensington High Street is now one of the most sought after addresses in London, setting itself above all others and serves as the epitome of London living. Wetroom Materials worked hand in hand with the architects and contractors to overcome the varying challenges the project presented. 300+ low profile wetroom solutions were able to be supplied to the development.
The Unidrain linear drain system 1004 model finished with the highline custom tiled panel was the chosen drain. This was supplied as part of the Unislope 1K kit, which couples the drain up with a preformed slope and waterproofing solution.
Unislope 1K Wetroom System - Wet Room Tray
Wood Wharf - Canary Wharf Contractors
Marienlyst Strandhotel, Helsingør
One Bishopsgate Plaza
SoulCycle
Waterproofing a 116-Bed Care Home, London
Basement Extension to a Grade 2 Listed Building, London
Structural Waterproofing Mixed Commercial Development
Four Seasons Hotel, Park Lane