OVERVIEW
Newgate is now in its 38th year of supplying and installing traffic control barriers to UK ports, docks and harbour authorities.
Our first “Dock barriers” were at Felixstowe docks in the mid 1980’s, our latest one is at the Alexandra dock in Kings Lynn.
Our latest barrier installation controls the traffic movement on and off the sites and can be linked to ANPR and traffic light systems as well as a range of other additional accessories such as stop signs, traffic lights and alarms.
Manual Swing Arm Barrier
Challenger Rising Arm Barrier
Manual Swing Gates
Rising Arm Height Restriction Barrier
Heavy Duty Rising Arm Barrier
Type 1 Manual Sliding Gate
Type 1 Electric Sliding Gate
Manual Swing Arm Barrier (Heavy Duty)
Elstree Studios
Royal Residences
Trafford Park Car Dealership
Buckshaw Primary School
United Utilities
Walney Substation