OVERVIEW
Background
Two New Bailey has a prominent position in the New Bailey scheme which forms a key part of Salford’s city-wide regeneration. The contemporary office space comprises of 188,500 sq ft and has achieved a BREEAM Excellent rating. Not only this, but the building also has a private outdoor terrace on each floor, as well as many other amenities.
Challenge
Architects from Allford Hall Monaghan Morris (AHMM) were set the challenge of designing an innovative workplace environment that offers flexible working while balancing the characteristics of a high-quality, sustainable office building. It was anticipated that there would be a high flow of people coming in and out of the building; therefore a safe entrance solution was needed to help control the throughput and security.
To find out more please follow the link.
EasyGate SPT/ SPD Speed Gate
PureGym, Nationwide
Savill Garden, Windsor
2 London Wall Place, London
40 Bank Street, London
DEMAND FOR INCREASED SECURITY IN MULTI TENANTED BUILDINGS - Automatic Systems - International
Secure your data centre by installing access control equipment - access control, turnstile, speed gate, barrier Automatic Systems
A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International
Two Hardman Street, Manchester