OVERVIEW
The Bard’s construction after experts from MoLA (Museum of London Archaeology) found remains of Shakespeare’s original wooden O stage and two sections of an exterior wall. With this, the opportunity arose to develop the area into a public open space with mixed offices, retail and residential apartments. This scheme became The Stage, where The Bard building was built.
Challenge
With various public access routes and private offices making up The Stage, the extensive fit-out had to include suitable security on The Bard offices to prevent unauthorised people from entering the building. Due to the nature of the project being a fit-out-out, it was key that the security solution wouldn’t interfere with other contractors carrying out work. As well as this, the client faced the challenge of finding a solution that would complement the stylish and contemporary office space.
To find out more please follow the link.
EasyGate SPT/ SPD Speed Gate
PureGym, Nationwide
Savill Garden, Windsor
2 London Wall Place, London
40 Bank Street, London
DEMAND FOR INCREASED SECURITY IN MULTI TENANTED BUILDINGS - Automatic Systems - International
Secure your data centre by installing access control equipment - access control, turnstile, speed gate, barrier Automatic Systems
A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International
Two Hardman Street, Manchester