OVERVIEW
The Project
Gloucester Business Park, Plot 1420, takes the form of three buildings grouped around a landscape courtyard, the buildings are split into six self-contained units which are sub-divided floor by floor.
Gloucestershire is excellent for transport links & the parks modern and flexible working environment also provides sufficient parking for all employees and visitors
Plot 1420 won Kier Central Site of the Quarter for Jan – March 2015. The site scored 100% when externally audited by the BSI for Quality and Environmental Performance.
The Challenge
Manufacture, deliver and install premium quality system befitting the development and the client’s requirements.
Offer complimentary system for use in the shower areas &
produce Solid Surface troughs to bespoke lengths, exceeding 3000mm.
The Solution
Excelsior Flush 44 Full Height system provides a sleek flush fronted façade delivering the upmost in quality, design and privacy.
Complimentary Mariner Cubicles finished in matching laminate installed in the wet areas. 12mm Solid Grade Laminate is recommended for shower enclosures the core material is manufactured with phenolic resins which ensures the self-supporting panels are impervious to water penetration and will stand the test of time against water/moisture ingress
All Cubicles and Vanities are finished in Oak Classic High-Pressure Laminate along with a Corian Vanity Top in Designer White. All working to complement each other and deliver a harmonious natural colour scheme generating a tranquil & calming atmosphere
Nick Flexen-Cook at Kier Construction has said – “Plot 1420 was delivered by the best, highest performing team that I have ever been privileged to be a part of. The tenant is rightly delighted with their facility which exceeds their expectations.”
Specification
Product Range: Mariner
Doors: 12mm Compact SGL Sonae Oak Classic M3817
Pilaster: 12mm Compact SGL Sonae Oak Classic M3817
Partition: 12mm Compact SGL Sonae Oak Classic M3817
Ironmongery: Stainless Steel
Client:
Goodman
Contractor:
Kier
Architect:
Frank Shaw Associates Ltd
Location:
Gloucestershire
Mariner SGL Duct Panel IPS - IPS Duct Panel
Magma Solid Surface Washtrough Units - Washtrough / Trough
Flush44 HPL (Flush Fronted) WC Cubicles - Cubicle
Dudley Leisure Centre
Birmingham City University
Altrincham Business Park
Dudley College
Concierge Camping
Honiton Swimming Pool
Ysgol Y Bynea
Ysgol Saron
Aberavon Aqua Splash
Ysgol Y Bynea
Ysgol Saron
Newhaven Holiday Park
GEC Anderson Domestic Bathroom
Wapping Hydraulic Power Station
Urban Playground
Material Source Studio Glasgow | Female Washroom