NBS Source
I'm a manufacturer

Birmingham City University

OVERVIEW

The Project


The completion of Birmingham City University - Curzon B & Royal Birmingham Conservatoire forms part of the University’s £260 million dedicated investment into new and advanced facilities.


Designed by Associated Architects to provide 100,000 square feet of additional facilities the £31 million Birmingham City – Curzon B Building officially opened in January 2018. The facility offers teaching and learning space for 3,000 students and staff.


The Challenge


Propose a robust cubicle system suitable for a heavy foot fall environment.

 

Deliver all products compliant to BIM Level 2.

 

Manufacture bespoke vanity troughs in a wave design.

 

Manage production, delivery and installation to the high standards set by the industry.

 

 

The Solution

As a local preferred supplier Excelsior were engaged by Birmingham based Willmott Dixon to supply and install the washrooms. T-Line Cubicle Range offered the perfect solution, with an extruded aluminium frame, inclusive of pilaster and headrail, coupled with Solid Grade Laminate Doors and Divisions ensure a robust cubicle that will stand the test of time.

Products featured in this case study

View all products (30)
T-Line SGL Cubicles - Cubicles

T-Line SGL Cubicles - Cubicles

T-Line HPL Washroom Cubicle - Modern, Minimalist Washroom Cubicle

T-Line HPL Washroom Cubicle - Modern, Minimalist Washroom Cubicle

More case studies from Excelsior Panelling Systems Ltd

View all case studies (27)
Dudley Leisure Centre

Dudley Leisure Centre

Altrincham Business Park

Altrincham Business Park

Dudley College

Dudley College

Aston University

Aston University

More case studies from Panel cubicle systems

View all case studies (37)
Concierge Camping

Concierge Camping

Honiton Swimming Pool

Honiton Swimming Pool

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron