This site uses cookies to store information on your computer. Learn more about these cookies, and how to opt out of them. Find out more
OVERVIEW
The Project
The completion of Birmingham City University - Curzon B & Royal Birmingham Conservatoire forms part of the University’s £260 million dedicated investment into new and advanced facilities.
Designed by Associated Architects to provide 100,000 square feet of additional facilities the £31 million Birmingham City – Curzon B Building officially opened in January 2018. The facility offers teaching and learning space for 3,000 students and staff.
The Challenge
Propose a robust cubicle system suitable for a heavy foot fall environment.
Deliver all products compliant to BIM Level 2.
Manufacture bespoke vanity troughs in a wave design.
Manage production, delivery and installation to the high standards set by the industry.
The Solution
As a local preferred supplier Excelsior were engaged by Birmingham based Willmott Dixon to supply and install the washrooms. T-Line Cubicle Range offered the perfect solution, with an extruded aluminium frame, inclusive of pilaster and headrail, coupled with Solid Grade Laminate Doors and Divisions ensure a robust cubicle that will stand the test of time.
T-Line HPL Washroom Cubicle
T-Line SGL Cubicles
Dudley Leisure Centre
Altrincham Business Park
Dudley College
Aston University
Concierge Camping
Honiton Swimming Pool
Ysgol Y Bynea
Ysgol Saron