NBS Source

Thames Lido

by Ardex Ltd – Flooring, Tiling & Screeding products

Residing alongside the River Thames in Reading is the site of the King’s Meadow swimming pool. It originally opened in 1902 as the Ladies Swimming Baths and is the oldest outdoor public pool from the early Edwardian era in existence. However, over time it fell into a state of disrepair and, following its closure in 1974, has been left unused for over 40 years.

Products featured in this case study

View all products (88)
ARDEX AM 100 Rapid Set One Coat Tiling Render

ARDEX AM 100 Rapid Set One Coat Tiling Render

ARDEX S 21 Rapid Hardening Floor Tile Bedding Mortar

ARDEX S 21 Rapid Hardening Floor Tile Bedding Mortar

ARDEX S 7 PLUS Flexible Waterproof Coating For Swimming Pools

ARDEX S 7 PLUS Flexible Waterproof Coating For Swimming Pools

ARDEX A 38 Ultra Rapid Drying Screed Cement

ARDEX A 38 Ultra Rapid Drying Screed Cement

ARDEX X 77 Flexible Wall and Floor Tile Adhesive

ARDEX X 77 Flexible Wall and Floor Tile Adhesive

More case studies from Ardex Ltd – Flooring, Tiling & Screeding products

View all case studies(50)
ARDEX Completes Another ‘Historic’ Project

ARDEX Completes Another ‘Historic’ Project

DAVID LLOYD LEISURE CLUB

DAVID LLOYD LEISURE CLUB

St George's Chapel - Westminster Cathedral London

St George's Chapel - Westminster Cathedral London

Scottish Parliament

Scottish Parliament