OVERVIEW
The Lindner Group took on a key role in the construction of the MOL Campus. Around 33,000 m² of the FLOOR and more® G40 hollow floor was installed in the high-rise building. The entire system complies with the REI 60 fire protection requirements and
can therefore withstand a potential fire for a full 60 minutes, which makes a huge difference in an emergency. In addition, Lindner installed around 1,200 m² of NORTEC control room systems for the server rooms. The implementation of the project required
extremely precise coordination on site, especially in close cooperation with electricians and other trades. In addition, there was a particularly tight schedule: At times, up to 2,500 m² of floor were delivered per week. However, with excellent teamwork, these challenges were quickly overcome and the project was completed
within a very short time.
Lindner FLOOR and more® G 40 x L/D
NORTEC L 30 x M - Raised Access Flooring
NORTEC Power - Heavy duty calcium sulphate raised access floor
NORTEC L 38 ST x H - Calcium Sulfate Raised Access Floor Type
Calcium sulphate raised access floor - NORTEC
NORTEC L 38 x M - Raised Access Floor Panel
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
Gresham Apartments, Raised Acoustic Floor - Nottingham UK
SubFloor Acoustic Raised Floor, Renovating 12 Apartments in Nottingham
Transforming a Listed Museum Near Liverpool into a modern Meeting Space using SubFloor
Transforming an Attic into an Energy-Efficient Storage Space in South Wales with SubFloor Raised Flooring
Nova N2 Development - London - Modular Washrooms
Parliament Building Vienna - FLOOR and more® , FLOOR and more® comfort
Global Tower - Raised floor systems, Heated and chilled metal ceilings, Partitions
MOL campus - Floor and more G40 and NORTEC