OVERVIEW
Project:
Unity Campus
Client:
Howard Group
Architect:
Nicholas Hare Architects
Value:
£12m
Location:
Sawston, Cambridge
Completion Date:
June 2023 Innovare duration onsite 15 Weeks
GIFA: 88,000 sq. ft
Air Tightness: 1 via passive purple U-Value 0.13 (259mm i-FAST with additional insulation by others on inside face of panel)
System:
i-FAST/Wrap Solution
Phase 2 of a new £100 million technology and R&D campus in Sawston, south Cambridge is now complete, providing an additional 90,000 sq. ft of science laboratory space across three buildings. Built on Cambridge’s reputation within life sciences, this phase enhances Unity Campus and elevates the region’s role within the industry.
Designed by Nicolas Hare architects, the building envelope is purposely designed to provide occupants with a healthy and attractive environment. Collaborative design development incorporating a concrete frame and advanced structural timber technology meant an innovative approach to the construction method could be adopted, bringing key advantages of sustainability and performance efficiency.
The Innovare Offsite i-FAST Panels were selected for construction because they minimize embodied carbon compared to steel framing systems, achieving the sustainability objectives set by the client Howard Group. Effective collaboration with the architects ensured that the client’s performance specifications were agreed well in advance of the start date.
i-FAST External Wall Panel - Low Carbon, Fire Safe Timber Frame Panel
Red Kite Academy - Education
Abbey View Primary School
Ysgol Newydd Corn Hir
Thames Park Secondary School
Red Kite Academy - Education
Abbey View Primary School
Ysgol Newydd Corn Hir
Thames Park Secondary School