OVERVIEW
Over several years, multiple attempts had been made by Cornwall Council to repair the Stonewold tiles and recoat the gutter courses at South Petherwin Primary School, to stem the leaks that had continued to affect multiple classrooms across the site.
Project management surveying firm, Kendall Kingscott, appointed Technical Manager Justyn Irons, to carry out a thorough condition survey to assess the roof build-up and isolate the source of the leaks. During the investigations, Justyn discovered that the main cause of ingress was caused by the wrong tile type being installed on the low-level pitch of the building. The gutters around the hall were too narrow and often blocked with debris, allowing ingress to flow back under the tiles into the building and directly into the classrooms below.
StressPly® Flex Bitumen Flat Roof
R-MER LOC Metal Roofing System
Alderley Park, Science and Innovation hub
Southampton General Hospital, New Oncology Ward
Midland Hotel, Iconic Landmark Refurbishment
Fforestfach Transport Depot, Asbestos Overcladding
Allenby Barracks
Jesus College
Waverley Court
Colchester County High School
APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant
APL Case Study - StrongBak™ - Derry Sports Complex
APL Case Study - Aluminium Sinusoidal Roofing & Perforated Cladding - Birmingham Energy Innovation Centre
APL Case Study - AP65ZS Zipseam™ Roofing & Sinusoidal, Slimwall™ & Louvre Cladding - CMR Medical