Oxford Biochemistry – Phase Two

OVERVIEW

With an acclaimed biochemistry building constructed in 2008, the University of Oxford appointed main contractor, Laing O’Rourke, to build the £73m phase two expansion of the facility.


The institution required extra space for the faculty and the new building would house very specialised equipment.


With respect to a partnership agreement with the University of Oxford spanning 20 years, it was important for Laing O’Rourke to select the right partner for the project.

Products featured in this case study

View all products (184)
Sika® CD Cavity Drain

Sika® CD Cavity Drain

Sika® Drain-850 Geo - Protection Board

Sika® Drain-850 Geo - Protection Board

Sika® Watertight Concrete Powder - Water Resisting Concrete Admixture

Sika® Watertight Concrete Powder - Water Resisting Concrete Admixture

More inspiration from Sika Limited

View inspiration
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

THE CUNARD BUILDING

THE CUNARD BUILDING

Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

Christ Church URC, Chelmsford

Christ Church URC, Chelmsford