NBS Source
I'm a manufacturer

Sika Project Revisited 13 Years on at Eco Flats In Leeds

OVERVIEW

In 2010, Protech where approached by The Clegg Group for a renovation project of an eight storey 1930’s building.

Originally known as Shaftesbury House, the building was opened in 1938 to house migrant workers in Leeds that had previously been living in appalling conditions. The development had deteriorated and was eventually closed and boarded up in 1998. As part of a regeneration programme of the area, Leeds City Council co ordinated the redevelopment of the site into what is now known as Greenhouse, a mixed-use block of eco-flats.  

Products featured in this case study

View all products (184)
Sikaplan® G Single Ply Membrane (Mechanically Fixed Warm Roof System)

Sikaplan® G Single Ply Membrane (Mechanically Fixed Warm Roof System)

More inspiration from Sika Limited

View inspiration
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

THE CUNARD BUILDING

THE CUNARD BUILDING

Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

Christ Church URC, Chelmsford

Christ Church URC, Chelmsford

More inspiration from Single layer sheet warm roof covering systems

View inspiration
Flat roof overlay at historic lighthouse.  Koster TPO Membrane.

Flat roof overlay at historic lighthouse. Koster TPO Membrane.

Single Ply Warm Roof Waterproofing on Residential block of flats.

Single Ply Warm Roof Waterproofing on Residential block of flats.

Koster Green Roof Waterproofing - Koster TPO Membrane

Koster Green Roof Waterproofing - Koster TPO Membrane

Museum of the Home, London. Koster TPO Single Ply Membrane.

Museum of the Home, London. Koster TPO Single Ply Membrane.