You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
The project had strict schedules which meant that minimal disruption to the surrounding areas was essential. A waterproofing system was required that would meet the requirements from both the public and private sectors as well as provide a contemporary, aesthetically pleasing finish.
Single Component Cold Applied Liquid System for Warm Roofs - IKO Hybritech 1K PU - Waterproofing system
1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library
A Cladding Refurbishment Project with Specific Colouring Requirements
A Flame-Free Solution to Reduce the Potential Fire Risk
A Natural and Locally Sourced Construction Required an Anti–Root Roofing System
Fleming Park Leisure Centre
Barton Hill Academy
Blackfordby St Margaret’s Primary School
Beckfoot Allerton Primary School