Beckfoot Allerton Primary School

OVERVIEW

Beckfoot Allerton opened on 19th November 1894, a proud day for the village of Allerton and its people. The school underwent many changes throughout the years surviving and contributing to both war efforts, while continuing to hold their high standards of education. In 1928 the school official became a primary school and later in 1960 a junior and infants’ school further undergoing changes. After a local authority change in 2000 Beckfoot Allerton Primary school was reborn. In the present day the school is much different to when it was opened generations ago and continues to serve as a corner stone of the village and its community.


Taking into consideration all of the requirements of the roof, a bespoke specification was prepared to refurbish the roof. Polyroof’s Protec System, a hybrid polymer liquid system with extremely fast curing and installation times, was the chosen system of use for the project. Due to its fully cold-applied application the works could be carried out during the Primary Schools term times, without having to wait for closure periods between terms.



Products featured in this case study

View all products (6)
Protec Overlay Roof Systems - Cold-applied liquid waterproofing

Protec Overlay Roof Systems - Cold-applied liquid waterproofing

Protec Warm Roof Systems - Cold-applied liquid membrane

Protec Warm Roof Systems - Cold-applied liquid membrane

More case studies from Polyroof Products Ltd

View all case studies (31)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Barton Hill Academy

Barton Hill Academy

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

More case studies from Liquid-applied cold roof covering systems

View all case studies (28)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Barton Hill Academy

Barton Hill Academy

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

More case studies from Liquid-applied warm roof covering systems

View all case studies (14)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Barton Hill Academy

Barton Hill Academy

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

Aston Martin Headquarters

Aston Martin Headquarters