You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
REQUIREMENT:
One of the station's main entrances was temporarily blocked off due to construction works. Consequently, a short-term access route from an alternative entrance was needed for both able-bodied and disabled users.
The client hired our modular access systems to fulfil the brief. They were selected for several reasons:
DESIGN PAHSE:
Our in-house design team generated 3D & 2D CAD drawings of the system, which were provided to the client along with their quotation.
INSTALLATION:
Despite the tight deadline of just three days and two nights, our team efficiently installed a ramp system with four entry points and a connecting step system.
The systems fully complied with Parts M and K of the Building Regulations.
At the end of the hire period, the systems were dismantled and repurposed for other projects, preventing landfill waste - unlike single-use wood or concrete alternatives.
This project demonstrates our ability to deliver swift, effective, and eco-friendly solutions under pressure.
FEATURES INCLUDED:
Fully Compliant DDA Modular Ramp
Fully Compliant Access Steps
Train Station Modular Ramp
Conquest Hospital, St Leonards-on-Sea
Weigh Cabin Platform & Steps, Birmingham
Bognor Regis, West Sussex
Coca-Cola Enterprises, Wakefield
Lincoln Cathedral, Lincoln
Palmarsh Primary School, Hythe
Newcastle United Football Club
Cramlington Town FC, Northumberland