You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
A new housing development, developed by Pobl Group and constructed by Hale Construction, comprises 144 one bed flats and two, three and four-bedroom contemporary homes that have been designed with a low carbon and ‘fabric first’ approach to help reduce energy consumption for the residents. Using mainly manufactured off-site modern methods of construction, the insulated timber framed wall and roof panels were assembled off site, with the facades finished with either Welsh sourced timber cladding or Sika’s Parex® REVLANE+ IGNIFUGE TG external render.
Revlane+ Taloche Fin/ Gros - Acrylic Thin Coat Render
Twickenham Stadium Resin Flooring
THE CUNARD BUILDING
Merry Hill Retail Complex Car Parks
Christ Church URC, Chelmsford
SMET | bauprotec 850 M External Render | Kells Co Meath | Remark Plastering Ltd