OVERVIEW
A 23,000 m² surf lagoon development where the system was used throughout all areas of the bathymetry slab and walls, allowing the removal of the previously specified polyurea coating.
Contractor: WH Malcolm
Engineer: Ramage Young Partnership
Products used: Everdure Caltite ( 9029m³)
Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.
MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES
AstraZeneca Campus, Macclesfield
Westbury Hotel, Mayfair W1
Waterloo Street, Glasgow