Caltite System integral waterproofing concrete was used in the project to waterproof the Main Waste Bunker, the IBA Bunker, the Halo Bunker, the Boiler House Pit, and the goods lift pit, ensuring durable, waterproof concrete construction at all joints, penetrations, and interfaces, and providing corrosion-resistance durability designed in accordance with Eurocode 2 (EN 1992) for the relevant exposure classes, cover requirements, and crack control.
Products Used: Caltite (2500m³)
Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.