OVERVIEW
Caltite System integral waterproofing concrete was used in the project to waterproof the basement slab and retaining walls containing the swimming pool, learner pool, and two tanks, ensuring durable, waterproof concrete construction at all joints, penetrations, and interfaces.
Architect: Robert Limbrick Architects
Contractor: Pellikaan Construction Ltd
Engineer: AMA Consulting
Products Used: Caltite (578m³)
Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.
MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES
AstraZeneca Campus, Macclesfield
Westbury Hotel, Mayfair W1
Waterloo Street, Glasgow