OVERVIEW
Caltite System integral waterproofing concrete was used in the project to waterproof the basement slab to the sub-extension of the pharmaceutical production unit, providing durable, waterproof concrete construction.
Architects: Baker Hicks
Contractor: O’Brien / Mid-Glamorgan Construction
Engineer: HBL Associates
Products used: Everdure Caltite ( 910m³)
Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.