OVERVIEW
Caltite System integral waterproofing concrete was used in the project to waterproof the basement slab and retaining walls forming the car park in the new hospital, together with the two link tunnels, providing durable, waterproof concrete construction.
Architect: HLM Architects
Contractor: Dunne Group
Engineer: Robert Baird Associates
Products Used: Caltite (3,474m³)
Contact Cementaid (UK) Ltd by clicking the button below to find out which products were used in this case study.
MACAU UNIVERSITY OF SCIENCE AND TECHNOLOGY – FACULTY OF ARTS AND HUMANITIES
AstraZeneca Campus, Macclesfield
Westbury Hotel, Mayfair W1
Waterloo Street, Glasgow