NBS Source
I'm a manufacturer

"sections including tapes"

2,803 results found

Sort by:

Showing 1-36 of 533

Sponsored
Thames Tideway Western Section

Thames Tideway Western Section

SMR PROJECTS LIMITED

Thames Tideway Western Section
Sponsored
Highway Soakaway – StormBrixx provides the infiltration solution on a key section of the A442 Project

Highway Soakaway – StormBrixx provides the infiltration solution on a key section of the A442 Project

ACO Technologies plc

When Telford and Wrekin Council needed to provide a safe, sustainable and maintainable infiltration solution for a key section of the A442, they turned to the expertise of ACO and its StormBrixx system.
Sponsored
Building bespoke SEND environments to include Ceiling Hoists

Building bespoke SEND environments to include Ceiling Hoists

Astor Bannerman

Boston Endeavour Academy is a newly built special school for children age 2-19 with a range of learning difficulties and disabilities, located in the market town of Boston, Lincolnshire. It opened to 100 pupils in September 2021 building to 140 over the coming few years. It features many state of the art facilities including therapy rooms classrooms and a hydrotherapy pool. Key Considerations:Installing ceiling hoists within multi-height ceilings Large spans are required throughoutRequires bespoke solution Working in collaboration with Kier and Wates Construction on this state of the art academy, our Astor OT200 hoisting system and Sensory Integration Swings have provided safe, supportive and comfortable accessibility to the children, allowing them to thrive in their educational setting. Main Equipment: Astor OT200 ceiling hoistH systemBespoke track systemRoom to room gatesTurntablesSensory Integration Swings“ The ceiling hoists are infinitely more convenient for supporting pupils from chairs to the floor to complete their work and postural changes. No longer having to rely on mobile hoists increases the space available that can be deployed for learning activities. The tracking in the pool area allows for speedy transitions to changing rooms reducing waiting times and the number of staff required to support transitions. The Sensory Integration swings have become a much-valued resource for supporting the regulation of many pupils. The advice given by Astor Bannerman representatives to be reliable and leading to excellent outcomes in terms of the resources for our pupils..” Richard Gamman, Headteacher Boston Endeavour Academy 
Sponsored
Replacing an Original 1949 Roofing Waterproofing System Including New Rooflights

Replacing an Original 1949 Roofing Waterproofing System Including New Rooflights

Iko Ireland

Perry Hall Academy, a large primary school built in 1949, with original waterproofing still in-situ. IKO assisted the Academy funding bid by providing a detailed survey report, including intrusive core sample analysis. The roofs were suffering from water ingress, cracks in the mastic asphalt, pooled water and poor heat retention, so decision was made to replace the roofs throughout. New rooflights were also specified to allow more natural light in while the design chosen reduced the external noise transmission. IKO worked with specifier Concept Education Services to deliver the project (some work during term-time) within 6 months.
Sponsored
Creating a Vibrant and Attractive Office Environment, Including the Roof!

Creating a Vibrant and Attractive Office Environment, Including the Roof!

Iko Ireland

A detailed visual and physical inspection, together with core and moisture probe analysis carried out by IKO on the roof, patio and walkway areas, indicated that the waterproofing membrane was in a condition commensurate with the age and the type of the traditional membranes installed. They had become fragile and brittle. The decks were saturated due to water ingress, and natural ageing had played a principle part in the deterioration of the waterproofing system. The build-up would not have met the requirements of the current building regulations Part L. IKO worked to refine the specification for the main roof,
Sponsored
Golden Side Return Extension, Including Opening Vario Rooflight.

Golden Side Return Extension, Including Opening Vario Rooflight.

VELUX Company Ltd

Jessica's home renovation and extension. Please see below a brief overview of Jessica's renovation journey in a blogpost:I’m not going to lie, renovating in a pandemic with no kitchen, was extremely stressful at times, particularly during the long stretches we were home-schooling, and it’s not something I’d want to repeat, but it definitely could have been worse, and we survived it.We bought this house six years ago and I have wanted to do the kitchen side return extension ever since Day One, but we had to wait and save, and then finally in September last year (2020) the day finally came, and we started the renovation. For reference, this is what it looked like when we bought the house. We did do a budget makeover in the interim by painting the cabinets and replacing the handles, but by the time we came to do the major building work we had doors hanging off, shelves collapsing, and the major lack of storage meant things were stuffed in and precariously balanced on top of each other and ready to topple as soon as anyone dared to delve in. I shared lots of my inspiration and ideas for the new kitchen before we started. I knew from very early on that I didn’t want to spend a huge amount of our budget on creating a fancy architectural kitchen extension. For me, the space inside was what was most important, and I just wanted to make sure we were maximising that to its full potential. We hired architect to draw up just the plans for us. I had initially wanted a pitched glass roof to run the length of the side return extension, but council planning regs and the unusual way our house is laid out, put paid to that idea. Our local council had recently introduced a height restriction of 2.5m at the boundary when extending more than 3m at the rear. Which we weren’t. Or so we thought! What we hadn’t realised is that the existing kitchen had already been extended and that counted towards the allowance, so the restriction did apply. This caused a lot of stress at the time, as we were so worried that the ceilings were going to feel low and dark. The good news is that as soon as the Vario by VELUX rooflights went in, all our worries melted away, and it’s not something I even notice or think about now.Another thing we did was speak to our neighbours about a third-party wall agreement. This was pretty key for us, as the buttress was on our side of the wall and if we had to build around it we would have lost at least half a metre of the side return. What we needed to do was take it down and build up right up to the boundary (saving as many of the London stock bricks as we could in the process). Luckily our lovely neighbours agreed, as this really did make a huge difference to the internal space.The LayoutI have had a lot of questions about many different aspects of the kitchen, but I think the thing I have been asked about most is the dimensions and the layout. We extended out 1.5m at the rear and around 2.5/3m to the side, bringing us to a total of 5m wide x 8m long. I think our layout is fairly unusual for a kitchen, and it seems to have inspired lots of people to try and do the same in their own kitchen renovations. The good thing about waiting almost six years to renovate your kitchen is that you get plenty of time to mull over what your dream kitchen might look like. The Design  knew I wanted to go with a seamless sleek, understated design and let the other materials do the talking, so I settled on the Urban kitchen, with slab doors. I worked with a kitchen designer to fine tune the space, and that’s where it really comes into its own, because they think of all the details you wouldn’t necessarily think of, and they know exactly how much space you need to allow you to move around your kitchen comfortably. The area around the island and peninsula was a tricky one to get right, because we didn’t want to interrupt the flow too much, but having lived in it for the last few months, I can confirm the kitchen designer got it spot on. We also included a fluted glass cocktail cabinet in our kitchen design, which houses all our glasses and drinks bottles and sits on the dining/entertaining side of the kitchen.The Vario by VELUX rooflightsOur previous kitchen had very little natural light and as a result none of us ever wanted to spend any time in there. So getting as much natural light as possible was a major priority in this renovation. We planned for two large rectangular rooflights along the side return (as we knew we needed a steel in between) and a square one towards the rear. Once we got planning permission, I asked our architect to tell me the absolute maximum amount of glazing we were allowed, and then headed straight for the Vario by VELUX website to design bespoke rooflights to the exact size we needed, using every last bit of glazing we were allowed! The bespoke nature of Vario by VELUX means you can tailor your sizes exactly to your needs. Using the 3D configurator online, you can also choose the frame colour, the type of glazing, and whether you want them to open or not. We have two 2.3m x 1m Rectangular rooflights (one opens) and a 1m x 1m square rooflight. Our builders had never worked with them before and were really impressed by the ease of fitting. The moment they went in, was the moment we really start to get excited about the new space. Even with screed floors and bare brick walls in November, the light was incredible in there. Now it’s finished, one of my favourite things is to work in the kitchen and watch the light as it changes and moves throughout the day. Even watching the rain is epic.
Sponsored
First class fire protection for the underground airport car park. 300 fire-proof doors and 52 sliding and sectional fire-resistant doors provide maximum safety on four car park levels.

First class fire protection for the underground airport car park. 300 fire-proof doors and 52 sliding and sectional fire-resistant doors provide maximum safety on four car park levels.

Teckentrup UK Ltd

A four-storey underground car park needs to meet enormous fire protection requirements. Preventive fire and smoke protection and fully functional escape routes and emergency exits were top of the list when planning the doors and barriers. T90 fire and smoke protection doorsets were used for highly frequented areas with a higher risk of fire and the gallery and escape routes between the individual fire compartments were fitted with single and double-leaf T30 doorsets with round glazing. Access points to the individual levels were equipped with T30 sliding doors and T30 sectional doors.
Sponsored
Whitethorn Village Apartments

Whitethorn Village Apartments

PARTEL

Whitethorn Village is an attractive residential scheme positioned adjacent to the centre of Naas. The contemporary development led by Cairn Homes PLC includes a mix of spacious family homes and two apartment buildings. These comfortable, sustainable residences offer the very best in terms of quality and energy efficiency.Developer Cairn Homes collaborated with Horizon Offsite to deliver the impressive 5-storey residential blocks in Whitethorn Village, benefiting from off-site fabrication, accuracy, and rapid completion within a tightly controlled cost plan.The apartments were constructed using an offsite fabricated light gauge steel (LGS) structural system. The external LGS wall panels and floor decking used in this system incorporated a number of Partel’s low carbon building envelope solutions. This included the advanced fire rated components EXOPERM MONO DURO 200 breather membrane and ECHOSEAL ALU FR airtight and windtight tape, the multi-purpose adhesive VERBOND, and also the phA Class Passive House Certified components IZOPERM PLUS vapour control layer and VARA SEAL smart airtight tape.
Sponsored
Creek Harbour - Dubai

Creek Harbour - Dubai

EFFISUS

This development includes a tower that will exceed the height of the Burj Khalifa, and a sanctuary development with exclusive villas and a canal district. Sustainability is at the heart of development, with a road and transport network designed to minimize environmental impact, as well as various ecological initiatives, including artificial forests and open green spaces. In this project, it is being used the A2 Class fire rated weatherproofing membrane Effisus Vapour FR to protect façade from environmental agents with superior fire resistance, and the bi-adhesive tape Effisus 2Bond DS, to seal the connections on the façades.
Sponsored
The Hepworth Gallery - Cafe and Education Areas of this Prestigious Gallery Include Stainless Steel Sinks, Worktops, Panels and Cabinet from GEC Anderson Limited

The Hepworth Gallery - Cafe and Education Areas of this Prestigious Gallery Include Stainless Steel Sinks, Worktops, Panels and Cabinet from GEC Anderson Limited

Anderson, GEC Ltd

GEC Anderson’s stainless steel worktops, sinktops, doors and splashbacks have been chosen for the modern Café Bar at The Hepworth Wakefield art gallery in West Yorkshire, for their contemporary and accurate appearance as well as their hygienic qualities associated with food service. The stunning building is formed of ten different sized trapezoidal blocks constructed using pigmented, self-compacting concrete and recently listed in The Times ‘Top 50 Galleries in the World’. The continuous stainless steel worktop installed behind the main serving counter of the Café Bar incorporates sinks, plinth, cupboards doors and splashbacks, all in brushed satin stainless steel.
Sponsored
The Fry Building, University of Bristol

The Fry Building, University of Bristol

Whitesales Rooflights

Extensive roof glazing refurbishment project including complex saw-tooth roof sectionProducts: em.glaze Monopitch, Northlights and a bespoke walk-on installation
Sponsored
The Moorings, Wales

The Moorings, Wales

PARTEL

The Moorings is a high-end, self-build project in an area of outstanding natural beauty in Anglesey, Wales.This collaborative project, between MBC Timber Frame and WM Design and Architecture, consists of a three-bedroom, 250m2 detached private residence that has been designed and constructed to achieve the airtightness and thermal performance targets required to meet Passive House standards. The timber frame home has been built incorporating a range of low carbon building solutions from Partel including high performing breather membranes ECHOFOIL EXO and EXOPERM MONO 150 and also the phA Class Passive House Certified components IZOPERM PLUS vapour control layer and CONEXO MULTISEAL airtight tape.
Sponsored
Forensic Laboratory Backweston

Forensic Laboratory Backweston

PARTEL

Forensic Science Ireland’s (FSI) new laboratory in Backweston campus, Co. Kildare, was designed by OPW.Their challenge was to build a durable, modern facility that was designed to meet the highest energy performance standards, with an effective wall assembly that helps protect laboratory staff from the elements.Partel worked with Duggan Brothers and Castle Ceilings to choose the most appropriate product system that would help achieve the Passive House standard for airtightness, considering the laboratory conditions.The forensic laboratory has been built incorporating a range of low carbon building solutions from Partel including the smart vapour control layer VARA PLUS, CONIZO and CONEXO MULTISEAL airtight tape, and also ACRAPRIME SPRAY.
Sponsored
GEC Anderson Outdoor Kitchen

GEC Anderson Outdoor Kitchen

Anderson, GEC Ltd

A recent example of an outdoor kitchen, that includes a single-piece worktop with integrated sink. Stainless steel base cabinets and special lowered section to receive BBQ unit. Architect: Jonathan Freegard
Sponsored
The Castings

The Castings

illbruck – a brand of Tremco CPG UK Ltd

Project: The Castings, Piccadilly EastLocation: Heyrod Street, ManchesterVCL membrane system supplier: ADA FastfixSystem used: illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer, illbruck TF448 High Performance Bonding Tape, ME322 Internal Tape 100illbruck, a part of CPG UK, have celebrated the successful installation of their new A2 fire classified vapour control layer within an exciting new residential development in the heart of Manchester.The projectThe Castings, Piccadilly East is on a 0.7-acre site in the Manchester Piccadilly regeneration area and includes four stepped building elements rising to 25-storeys high. The development will consist of 352 build-to-rent (BTR) apartments, including a mix of studio, 1, 2, and 3 bed units, alongside roof terrace gardens, retail and amenity space, and a public square. The project was designed with a focus on sustainability, to deliver low energy consumption with highly efficient building fabric.ADA Fastfix, a leading supplier into the construction industry, were approached to find an airtight vapour control membrane which would ensure high levels of thermal performance and energy efficiency in the building. As a ‘relevant building’ according to Building Regulations Approved Document B, the installed membrane needed to be a fire classified solution; an A2 fire classified solution was requested to provide enhanced fire safety for the building and its occupants.The solutionADA Fastfix selected illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer due to its enhanced reaction to fire classification of A2-s1, d0 to EN 13501-1, excellent product performance, and the accompanying technical support from the illbruck team. illbruck ME060 A2-Membrane uses advanced technology to combine reinforced glass fibre with an aluminium and laminated coating, providing long lasting strength and durability. The special coating also improves thermal performance by reflecting up to 95% of heat.  Its airtight and vapour-tight properties, which can be used to comply with Passivhaus, helps improve energy efficiency whilst protecting the building fabric from moisture vapour and condensation.The applicationOver 6,000m2 of illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer was attached to the Steel Frame Structure using TF448 50mm high performance tape. The lap joints and window details were then sealed with ME322 70mm tape. This system can be used on the internal structure of a timber frame or lightweight steel structure to manage air and moisture flow, as well as enhance the building’s thermal performance, energy efficiency, and fire safety. Alongside providing high performance products, the illbruck team also helped the client with detailed drawings, technical service and application guidance, and on-site support – to ensure a smooth installation process and great finished result.Project overviewScott Hurry, Area Sales Manager at CPG UK, said, “illbruck ME060 A2-Membrane was the ideal choice for this fabric first build due to its enhanced reaction to fire classification as well as helping to improve thermal performance in the building. This is the first major installation of our new ME060 A2 fire classified membrane - we’re delighted to work with ADA Fastfix to see our products installed in this development, where our membrane will be helping to protect the building and its residents for years to come.”
Sponsored
Rhondda Heritage Park

Rhondda Heritage Park

Polyroof Products Ltd

The Rhondda Heritage Park is a renowned tourist destination in South Wales, offering a glimpse into the coal mining community that thrived in the area for over 130 years until the early 1980s. Every year, thousands of visitors take a guided tour led by former colliery workers to experience the life of coal miners.The Heritage Park takes great pride in its appearance and the local heritage it represents. However, the aging asphalt roof terraces that covered the old mine shafts had been leaking constantly, damaging the visual appeal of the visitor site.The ChallengeThe Polyroof technical team was called in to help with the waterproofing and refurbishment of the two roof terraces, measuring over 1100m², that protected the underground mining attraction. After conducting a thorough survey of the roof terrace areas, a customized specification was prepared. This specification included a comprehensive set of recommendations for addressing the issues that had caused the aged and worn condition of the terrace areas over the years. To support the proposal, additional information was provided to the client to demonstrate how a liquid system could seamlessly encase and waterproof the terraces while maintaining an aesthetically pleasing solution that was true to the authenticity of the site.Satisfied that the solution proposed would provide the long-term peace of mind they were looking for, the Heritage Park awarded the contract to RM Polymers Ltd.Before starting the work, any areas affected by fungal growth or moss were treated with Polykill Anti-Fungal Wash to eliminate all spores. Any holes in the asphalt were smoothed out or removed, and levelled using Polyroof Structural Repair Mortar. All large cracks and voids were cleaned and repaired using the same mortar.PVC protrusions were removed and surfaces were cleaned with acetone. Any damaged, loose, or unsound concrete or brickwork was removed and repaired using Polyroof Structural Repair Mortar. All repairs were allowed to cure and dry before priming.The SolutionOne of the main features of the tourist attraction is the mining carts that were used to transport coal around the mine tunnels during its operation. Similar to train tracks, the mining cart tracks are fixed into the ground using metal bolts and fixings which over time had become a weak point for water ingress. Concrete and sandstone had been used as a “quick fix” to prevent rainwater entering the mine shaft below but a long-term solution was now needed. The cement and sandstone was carefully chiselled from the rails, exposing the original metal tracks which were then lifted and abraded back to their original condition. Whilst lifted, the underlying surface was made good before the application of the Protec System. Railway sleepers were then laid on a sacrificial layer on top of the waterproof membrane, upon which the tracks and mining carts were re-instated.As the terraces are constantly trafficked by the general public, the client was clear that an anti-slip finish would be required on any walkway areas.Following the application of the Protec System, Polyfinish and Quartz Sand Anti-Slip was applied to all walkway areas, to provide slip resistance and surface protection. A 50mm margin around the perimeters of the terrace was masked off to provide a neat termination of the anti-slip finish. Ensure masking tape was removed whilst resin was still wet. Then a third coat of Protec Resin was applied at a minimum coverage rate of 0.5Litres/m² (2.0m²/Litre) and whilst wet, clean dried quartz sand (0.7 – 12mm) was broadcast at an approximate coverage rate of 4.0kg/m². Once cured, the loose sand was removed.WorkmanshipThe engine houses along the tour experience featured vast amounts of intricate details and unique items and structures, such as “Bertie and Trefor” – the names given by the mine owner to the mine head stock wheels. This presented an exceptional challenge, particularly in regards to the difficulty of working on the intricate details of the degraded mastic asphalt upstands and decking.As a result of many years of weathering and gravity, the vertical sections of asphalt on the raised terraced roof had slumped and rippled, leading to stress cracks and ultimately water ingress. To overcome this ugly problem, the asphalt was stripped from these vertical sections back to the concrete and removed from site in accordance with the Health and Safety policies in place. The contractor then installed new 18mm OSB3 to these areas to create a flat substrate for the Protec System. The incorporation of Polyroof pre-formed GRP Drip trims at the bottom of the OSB3 ensured the timber would not be exposed to any rain water in the future as well as provide a neat, edge detail.To keep the overall aesthetic feel of the site, the application of the liquid waterproofing system at wall abutments was critical. This, combined with the undulating nature of the stone and brickwork meant that the contractor would not be able to install a cover flashing or termination bar. Instead, the contractor carefully dressed the system onto the wall to the standard minimum 150mm upstand height and into a chase.The edging was then finished with a mortar to provide a neat and clean weatherproof finish, in-keeping with the traditional methods of the site at the time of its construction.The roof terraces that cover the old mining areas also act as the main walkways to the Heritage Centre’s tour routes. Therefore, one of the main challenges of the project was the complex planning of the works to ensure that the site continued to operate so not to financially impact the heritage park. It was imperative that works were complete within an 8-week period with 17,500 visitors booked in for their annual Santa’s Grotto Experience Tour beginning in early December.The application speed of the catalyst cured Protec System, combined with communication between the contractor and the site to ensure unobtrusive installation, meant the centre stayed open and the tours running with minimum disruption.The benefits of using a fast-curing liquid waterproofing solution were also vital due to the ever-changing micro-climate in the Welsh valleys. On any single day, the weather would serve up anything from bright sunshine to windy, rainy conditions. Therefore, the fast-curing Protec System, combined with the flexibility of the installation team, who gave up weekends when required, ensured the project was finished on schedule. The works were completed to an extremely high standard with full encapsulation of the roof terrace areas and without a single detail being left exposed to the elements.ConclusionThe unique aspects of this project certainly kept the team on their toes. But they were determined to complete the project on time.The team worked tirelessly, even giving up their weekends to ensure that the project was completed on schedule. Despite the harsh Welsh weather, they pushed on and were determined to make sure that Santa could visit the children of the Welsh Valleys. It was a challenging project but the team’s hard work and dedication paid off.Finally, the project was completed and the results were astounding. The roof terraces are now fully waterproofed and refurbished, and the visual appearance of the visitor site was greatly improved. It was a project that was both memorable and rewarding to all those involved.
Sponsored
48 Carey Street, London

48 Carey Street, London

SELO

The high performance folded steel frames with an integral perforated plaster bead allow the plaster or tape and jointing compound to be applied up to the edge concealing the door frame and all fixings. Extensive testing has been carried out to cover all fire and acoustic requirements. As such, Selo’s range of concealed riser doors is the most extensive and versatile range on the market to date.
Sponsored
LED Lighting - Confetti X

LED Lighting - Confetti X

Gradus

Gradus has provided LED Step Lighting solutions for a new cross-media venue based in Nottingham, creating an atmospheric lighting effect while aiding wayfinding.Confetti X, a £5m complex at Confetti Institute of Creative Technologies, part of Nottingham Trent University, offers students state-of-the-art technology for esports production, content creation and other emerging technologies like virtual production. The 100-seater venue features a large video wall for 4k broadcast complete with LED wings and hosts amateur and professional esports tournaments.The Gradus ATD121L Aluminium Step Profile was supplied and fitted on the steps in the seating area, featuring the company’s 5w Gradus Impression 3000k Warm White commercial-grade LED tape to ensure long-lasting reliability. A selection of control equipment was supplied, including an RF controller with a wireless hand-held remote, enabling the theatre to control and adjust the lighting as required.
Sponsored
ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall

ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall

Architectural Street Furnishings part of WB White Foundry

ASF produced the full gamut of variants for this project, all using the ASF 5006 mitred top post system to give continuity. 114mm diameter post uprights were used to offer a substantial framework for these barrier and handrail systems. Some areas needed only handrail so a single sided underslung system was provided, with wrap around end profiles offering a pleasing end point to individual sections.On the post and panel sections a 48mm diameter top rail was used in conjunction with stainless steel perforated panels. These meshed perfectly into the step units that swapped seamlessly from post mounted to wall mounted handrail.Curves, corners and steps were included on this project
Sponsored
Drumhierny Woodland Holiday Lodges

Drumhierny Woodland Holiday Lodges

PARTEL

Nestled in Ireland’s Hidden Heartlands, over-looking the Shannon Blueway and River Shannon, Drumhierny is a unique development of high-end holiday lodges situated in a 100 acre woodland estate. This multi-unit project, consists of sixteen lodges, in four distinct architectural styles, each nestled within their own private area of woodland. The lodges have been designed, manufactured, and constructed to achieve an A-rated Building Energy Rating (BER). To help achieve a thermally efficient building envelope a number of products from Partel have been used.The buildings were constructed using an offsite fabricated Light Gauge Steel (LGS) frame. As part of the frame construction a number of Partel’s low carbon building envelope solutions were used. This included EXOPERM MONO 150, a high performing breather membrane, IZOPERM PLUS, a phA Class Passive House Certified vapour control layer; and CONEXO MULTISEAL, a phA Class Passive House Certified airtight tape.
Sponsored
Anchorage Gateway

Anchorage Gateway

Siderise Group

Standing tall in a prime location at the entrance to the Salford Quays – one of Greater Manchester’s most vibrant and prominent media and culture hubs – Anchorage Gateway is here to make a statement. The 250,640 sq ft, 29-storey residential high-rise, completed three months ahead of schedule, is set to be the tallest residential brickwork building in the UK.  Yet, behind this traditional brick façade finish is a design that demanded a modern approach to diverting moisture from the cavity to the outside of the building, using construction methods far more efficient than the conventional. Key information Completion date September 2023 Sector Residential Developer Cole Waterhouse Main Contractor Domis Construction Façade Contractor Kinlan Brickwork Delivery Architect Jon Matthews Architects  Products used Siderise CT Cavity Tray  Design and specification Representing the gateway entry point into Salford Quays, the build-to-rent (BTR) Erie Dock Apartments (Eda) development replaced a vacant four-storey office block of 1990s construction with a building designed to offer a truly contemporary residential experience. Hosting 290 apartments of various sizes and private amenities such as co-working spaces, a fitness studio, a screening room, and more, it was important that the building’s exterior reflected a feeling of home and community, giving it a sense of place in this rapidly developing part of the city.  The building’s L-shaped footprint is emphasised by the use of stepped massing, with the slimmer block extending to the top of the building and external rooftop terraces at the crown of each ‘block’. Each elevation is constructed from pale-coloured brickwork, supported by an SFS System and concrete core works, giving the building a solid and striking, yet clearly domestic feel in an area dominated by glazing and cladding.  Moisture management is a fundamental element of any masonry construction, and cavity trays must be installed to ensure that any rainwater entering the wall cavity through the external brickwork is directed away from the inner structure, reducing the risk of internal damp and mould. Main contractor, Domis Construction, and brickwork contractor, Kinlan, had previously been using the traditional approach comprising metal cavity trays. However, in their search for a more efficient method that could improve the speed and cost of delivery without compromising on quality, they came across Siderise CT Cavity Tray.  After carrying out their due diligence, the team engaged the Siderise Site Services to deliver training onsite, which included a benchmark installation. It was then that Domis Construction and Kinlan realised the huge labour and time-saving benefits Siderise CT Cavity Tray could offer and that ‘it did what it said on the tin’. The factory-engineered system was subsequently trialled on a section of another Salford project before being put forward to the fire consultants and building control officers for the high-rise Anchorage project.  The CT Cavity Tray achieves an A2-s1, d0 reaction to fire classification to EN 13501-1, is BBA certified and can comply with NHBC, LABC and Premier Guarantee warranty requirements.  David Ashworth, Project Manager, Domis Construction: “Siderise CT Cavity Tray has been a gamechanger for us. We’d been using traditional all-metal cavity trays, site-formed and pre-formed. Even though we’d used Siderise Cavity Barriers and Firestops before, we were somewhat unsure about this single-fix tray and insulation combo at first.   Nevertheless, we researched the product, confirming that it met regulatory compliance criteria and seeing the potential benefits in terms of time saving ability, labour cost reduction, and scaled-down site complexities associated with specialist tools, equipment, and segregated workshop areas for onsite fabrication.”  Installation and inspection Over 3,200 units of Siderise CT Cavity tray were used on the project, helping to realise installation benefits that carried real value for the project. On previous projects where traditional cavity tray solutions were used, the installation teams would need to share masts with the bricklayers on a 50/50 circa ratio. This meant that the bricklayers would take longer to complete their job, due to the time it would take to form and fit the cavity trays, as well as other products, ahead of them.   By using the pre-engineered Siderise CT Cavity Tray, which combines a flexible aluminium tray with non-combustible insulation, the installation team was able to install this lightweight element much faster with just a cutting knife and sealing tape for joining at details such as corners or windows. The requirement for specialist equipment, isolated onsite workshop zones, vast site storage facilities, soldering, sealants and installing insulation as a separate fix and was eliminated, enabling them to free up mast usage, with an estimated ratio of 70/30 in the bricklayers’ favour, speeding up the build programme.   David Ashworth, Project Manager, Domis Construction: “Working with our brickwork contractor, Kinlan, the Siderise Site Services team came down and delivered an in-person practical training programme before the install and it was during this in-depth session that we started to realise the operational advantages it would have. They have also been supporting us continually on the build, checking how we are installing their product and giving us any advice necessary to ensure a top-class delivery.”  Summary Anchorage Gateway demonstrates, with tangible evidence, how traditional building methods can be improved using modern products that have been engineered and tested to meet the demands of contemporary construction, allowing the creation of beautiful brickwork buildings without sacrificing on speed or quality of build.  
Sponsored
Aykon London One

Aykon London One

EFFISUS

Aykon London One is London’s luxury venture and the first of its kind in Europe. It was designed in partnership with the iconic fashion house Versace Home. Its residents will be able to enjoy the magnificent urban landscapes as well as the serenity of its private winter gardens. The building’s design make Aykon London One, the most exclusive real estate investments in London. In this new project the Effisus Breather B membrane was used for moisture management and protection of the façade against damp, and Adjoin TI tapes for the sealing of overlap joints between membranes.
Sponsored
New Product - Ecco Concertina Loft Ladder

New Product - Ecco Concertina Loft Ladder

Premier Loft Ladders Ltd

The Ecco concertina loft ladder features the very latest technology to achieve excellent thermal insulation and an airtight seal. The 4-point latching system ensures an airtight seal all the way around the hatch, while WDL tape provides an insulating seal between the hatch box and ceiling structure. Ideal for residential and light-duty commercial projects. The lightweight yet strong and durable aluminium loft ladder is easy to open and close. It is also suitable for smaller ceiling openings (as small as 800mm x 550mm).
Sponsored
Clement steel screen creates the ‘WOW’ factor in this striking London apartment

Clement steel screen creates the ‘WOW’ factor in this striking London apartment

Clement Windows Group

London based Granit Architects, chose Clement Windows to manufacture and install this fabulous two storey steel screen for this residential project in Clapham. Clement’s EB24 steel window system was specified for its slim, strong sections, allowing maximum light gain. The screen which included a multi point locking single door on the ground floor is polyester powder coated in RAL 9005 matt black and finished with a dark bronze effect handle.
Sponsored
Protection Board - London Aquarium

Protection Board - London Aquarium

Wallbarn Ltd

The contractor was relaying a waterproof membrane immediately above the London Aquarium and naturally the client was concerned about leaks with such precious livestock beneath. The waterproofing was torch-on bituminous felt membrane, due to be covered with road grade asphalt. Protecto-board was laid onto the waterproofing and secured with tape. It was cut to shape around the curbs cleanly and effectively without leaving vulnerable areas and without delaminating or crumbling, or leaching bitumen. It protected the waterproofing from temporary construction process damage and permanently protected it when covered with hot road grade asphalt afterwards
Sponsored
Drake's London

Drake's London

Crittall Windows Ltd

Haberdasher Street is the appropriately-named location for the new headquarters of Drake’s London, a firm that since the late 1970s has specialised in the design and manufacture of men’s ties. The choice of Crittall Corporate W20 windows was not a difficult one – given that the main section of the building dates from the 1930s it was a natural decision to choose steel windows as these would have been installed originally. The functions within the building include workshops where people handmake ties, requiring a lot of natural light.
Sponsored
St George's Hospital, Roehampton

St George's Hospital, Roehampton

Rapid Ramp Limited

REQUIREMENT: Two temporary laboratories were planned for installation in the hospital parking lot.It was determined that a ramp with a wide platform was necessary to accommodate the diverse range of daily users of the system, including those operating patient-moving equipment, carts, and pedestrians accessing the cabins.END RESULT:A fully compliant ramp featuring an extra-wide metal walkway was designed and successfully installed. This product boasts a secure loading capacity of over one ton!FEATURES INCLUDED:Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp or step. Additionally, it helps users distinguish any level changes.Infill Handrail - if the ramp height exceeds 380mm, Infill handrail is a requirement to prevent users from climbing or falling through gaps.1100mm High Rail - 1100mm handrails are attached to any level sections.Mesh Platform – a self-draining mesh platform allows water to pass through rather than puddle on the surface and potentially freeze. Minimum width: 1500mm.Rest Platform - a rest platform at 5 metres is required to allow the user to pause.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Standard Continuous Handrail - this handrail system ensures the users always have support to hold onto.EXTRA FEATURE INCLUDED:Yellow 900mm High Handrail To Ramped Sections – designed to be gripped by children and wheelchair users. A bright colour such as yellow is generally the easiest to see because of the colour's ability to reflect light.
Sponsored
Hollandgreen - London

Hollandgreen - London

EFFISUS

The idea behind the project was to explore a new usage for the main exhibition hall and replace the administrative wing and develop it from a residential point of view. The project sits at the southern end of Holland Park and occupies an area of 30.000 m2. Effisus weatherproofing solutions and Consulting Services have been integrated throughout the project, aiming to maximize the building’s energy efficiency and air quality. Some of the Effisus solutions installed were: Effisus Ecofacade Membrane, Effisus Breather+ Membrane, Effisus VAP Vapor Control Barrier, Effisus Bonding KF Adhesive and Effisus 2Bond GO Tape.
Sponsored
The Long Barn, Bedfordshire

The Long Barn, Bedfordshire

Anderson, GEC Ltd

Large stainless steel island worktop with double bowl sinks, ultra-deep square edge, cut-out for hob and special sliding section to reveal additional storage.Integral sinksSinks are seamlessly integrated (no joins or crevices or dirt-traps) in the specified location. Vola single lever mixer tap with swivel spout.Sliding section A sliding section was introduced to provide concealed storage for items such as toaster and kettle.
Sponsored
ULMA drainage channels in the Jaguar Land Rover Site- Tonbridge.

ULMA drainage channels in the Jaguar Land Rover Site- Tonbridge.

ULMA Architectural Solutions

Multi V+ drainage channels have been installed in the outside area of the Jaguar car dealership.These channels with V-shape section, provide a higher speed with lower flows, and have been developed to drain water faster, improving the self-cleaning effect of the channel. Its optimized cross section, larger than the traditional V-sections currently available on the market, provides bigger hydraulic capacity for extreme flow situations. 
Sponsored
Acoustic fencing provides noise mitigation for train maintenance depot near Paris

Acoustic fencing provides noise mitigation for train maintenance depot near Paris

Jacksons Fencing

Due to the close proximity to residential areas and various commercial properties including a performing arts theatre, it was essential to provide noise mitigation to minimise disruption and noise pollution for the surrounding areas, particularly during night times. We supplied a total of 280 metres of Jakoustic® Commercial and Highway Reflective acoustic fencing in two sections of 2.5m and 4.5m heights. The timber acoustic fence features 34mm thick ‘V’ boards and is designed to eliminate gaps that sound can pass though, resulting in a noise reduction of up to 28dB*.
Sponsored
Clement steel screens create a sensational backdrop to roof terrace at iconic film studios

Clement steel screens create a sensational backdrop to roof terrace at iconic film studios

Clement Windows Group

Twickenham Studios was established in 1913 and is one of the UK’s oldest and most celebrated film and TV studios. The Lounge is the Studio's new rooftop bar. This fabulous facility is accessed through brand new Clement steel screens. Made from strong EB24 steel sections, they are robust, but also incredibly slim and elegant. The bespoke doors have genuine T bars and a high glass specification, including Guardian Sun Guard offering solar protection and an argon gas filled cavity which improves thermal efficiency.
Sponsored
Le Cristolien - Paris

Le Cristolien - Paris

EFFISUS

Completely restructured, the building is BREEAM Good, certified by BBC Effinergie Rénovation and HQE Rénovation Très Bien. With its partners, was chose a bold architecture that meets the challenges of the future, anticipates future developments, considering all its dimensions. Several Effisus solutions were used in this project: Effisus Ecofacade, to ensure water and air tightness of all facade elements connections, the waterproofing adhesive Effisus Bonding KF, the facade joint sealing solution for rainwater with pressures up to 600Pa Effisus Sealexpand XTRA 600 and also the multifunction double-sided butyl-based sealing tape Effisus 2Bond GO.
Sponsored
IAE Zebex Fencing - Distribution Centre Perimeter Fencing

IAE Zebex Fencing - Distribution Centre Perimeter Fencing

IAE

Perimeter fencing for a national distribution centreAs part of the development of a new national distribution centre, IAE Fencing Division supplied it’s Zebex fencing system to secure the perimeter and internal areas of the site.2000m of FencingThe supply included over 2000m of fencing, which enclosed areas containing the main distribution warehouse, company office, staff car park, and company vehicle maintenance yard.Safety & SecurityPerimeter fencing is included to prevent accidental ingress and deter malicious intruders.The site has the potential to be very dangerous, as there are lots of heavy good vehicles and forklifts moving around. The perimeter fence provides a significant boundary, preventing members of the public from accidentally entering the site, and channelling site visitor to designated access points. This is important as the site owners are liable for the safety of anyone on the site, and one of the most effective ways to protect people is to make sure they can’t access potentially dangerous areas to being with.The fence also provides a significant obstacle, acting as a deterrent to more malicious intruders such as thieves and vandals and reducing the likelihood of costs associated with theft and damage.Flexible SystemIAE’s Zebex is a flexible system that can be adapted on site to most ground conditions.The distribution centre included many areas of uneven ground with extended sections of the site boundary including substantial inclines.The Zebex system was simply stepped using the pre-drilled holes in the posts to account for the undulating ground.Zebex Site GatesTo complete the perimeter around the site IAE supplied several gates clad with Zebex mesh panels for a consistent look with the rest of the perimeter, including pedestrian access and main goods vehicle entry points.Specifying IAE’s Zebex Perimeter FencingZebex Perimeter Fencing is one of IAE most popular fencing system and has been installed on hundreds of sites across the country. To add the system to your project, check out the featured products section below, or contact IAE Fencing Division directly.
Sponsored
The Erratics Exhibition

The Erratics Exhibition

ROCKWOOL Ltd

The Erratics Exhibition features an impressive 6.5m by 5.5m sculpture, created by Lubna Chowdhary, who fabricated a stunning giant modular sculpture using ROCKWOOL® RockLap heating and ventilation pipe (H&V) sections.Lubna Chowdary chose ROCKWOOL RockLap sections as it was a material that could be easily formed and constructed into more complex shapes with minimal tools and processes.Traditionally used for heating and ventilation pipes in a range of settings, ROCKWOOL RockLap sections have been proven to deliver thermal insulation performance.
Sponsored
Green Hollow, Cheshire

Green Hollow, Cheshire

Technal

This contemporary style, five-bedroom detached house commands a floor area of 10,000sq ft and includes an indoor swimming pool together with gym and leisure facilities. Rear facing, the property has been constructed on raised land that slopes down to a natural stream with breath-taking countryside views beyond.Following the initial design with the architect, TECHNAL provided a full NBS specification for the aluminium systems with typical through sections and full thermal value calculations, as well as budget budget pricing pre-tender to ensure an accurate tender package.

Showing 1-36 of 533

Feedback