Replacing an Original 1949 Roofing Waterproofing System Including New Rooflights

OVERVIEW

Perry Hall Academy, a large primary school built in 1949, with original waterproofing still in-situ. IKO assisted the Academy funding bid by providing a detailed survey report, including intrusive core sample analysis. The roofs were suffering from water ingress, cracks in the mastic asphalt, pooled water and poor heat retention, so decision was made to replace the roofs throughout. New rooflights were also specified to allow more natural light in while the design chosen reduced the external noise transmission. IKO worked with specifier Concept Education Services to deliver the project (some work during term-time) within 6 months.

No featured products in this case study

Contact Iko Ireland by clicking the button below to find out which products were used in this case study.

More case studies from Iko Ireland

View all case studies (24)
1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

A Cladding Refurbishment Project with Specific Colouring Requirements

A Cladding Refurbishment Project with Specific Colouring Requirements

A Flame-Free Solution to Reduce the Potential Fire Risk

A Flame-Free Solution to Reduce the Potential Fire Risk

A Natural and Locally Sourced Construction Required an Anti–Root Roofing System

A Natural and Locally Sourced Construction Required an Anti–Root Roofing System