Building bespoke SEND environments to include Ceiling Hoists

OVERVIEW

Boston Endeavour Academy is a newly built special school for children age 2-19 with a range of learning difficulties and disabilities, located in the market town of Boston, Lincolnshire. It opened to 100 pupils in September 2021 building to 140 over the coming few years. It features many state of the art facilities including therapy rooms classrooms and a hydrotherapy pool. 


Key Considerations:

  • Installing ceiling hoists within multi-height ceilings 
  • Large spans are required throughout
  • Requires bespoke solution 


Working in collaboration with Kier and Wates Construction on this state of the art academy, our Astor OT200 hoisting system and Sensory Integration Swings have provided safe, supportive and comfortable accessibility to the children, allowing them to thrive in their educational setting. 


Main Equipment: 

  • Astor OT200 ceiling hoist
  • H system
  • Bespoke track system
  • Room to room gates
  • Turntables
  • Sensory Integration Swings


“ The ceiling hoists are infinitely more convenient for supporting pupils from chairs to the floor to complete their work and postural changes. No longer having to rely on mobile hoists increases the space available that can be deployed for learning activities. 

The tracking in the pool area allows for speedy transitions to changing rooms reducing waiting times and the number of staff required to support transitions. 

The Sensory Integration swings have become a much-valued resource for supporting the regulation of many pupils. The advice given by Astor Bannerman representatives to be reliable and leading to excellent outcomes in terms of the resources for our pupils..” 

Richard Gamman, Headteacher Boston Endeavour Academy 


Products featured in this case study

View all products (19)
Hygiene Room for Secondary School (BB103) and SEND (BB104)

Hygiene Room for Secondary School (BB103) and SEND (BB104)

Astor OT200 Ceiling Track Hoist

Astor OT200 Ceiling Track Hoist

Hygiene Room for Primary School (BB103 & BB104)

Hygiene Room for Primary School (BB103 & BB104)

More case studies from Astor Bannerman

View all case studies (22)
Wimbledon Tennis Installs Changing Places Rooms

Wimbledon Tennis Installs Changing Places Rooms

Wisley - Made Possible by Changing Places Toilets

Wisley - Made Possible by Changing Places Toilets

Hoists in Changing Places Toilets: Top 4 Considerations

Hoists in Changing Places Toilets: Top 4 Considerations

Leeds Royal Armouries Officially Opens New Changing Places Toilet

Leeds Royal Armouries Officially Opens New Changing Places Toilet

More case studies from Accessible WC package systems

View all case studies (9)
Lord's Cricket Ground Changing Places

Lord's Cricket Ground Changing Places

Changing Places in Hospitality

Changing Places in Hospitality

Changing Places in Healthcare Settings

Changing Places in Healthcare Settings

Changing Places for Local Authorities

Changing Places for Local Authorities

More case studies from Assisted transfer hoists

View all case studies (2)
St Andrew's Hospice

St Andrew's Hospice

Dr Kershaw's Hospice Integralift Bed Hoists

Dr Kershaw's Hospice Integralift Bed Hoists