NBS Source
I'm a manufacturer

"mesh perforated sheet wires ropes rods"

7,703 results found

Sort by:

Showing 253-288 of 425

Sponsored
Hathersage Road Car Park, Manchester Royal Infirmary

Hathersage Road Car Park, Manchester Royal Infirmary

Rapid Ramp Limited

PROJECT BACKGROUND: Patients, staff, and visitors for the Oxford Road site of Manchester Royal Infirmary use the linking Hathersage Road Car Park daily.REQUIREMENT:A compact internal ramp for the level 2 and level 7 entrances.END RESULT:Two small internal ramps with bespoke yellow handrails and a 1:15 gradient were installed within a few hours. Our ramps come in components that were small enough to be carried into the carpark lift and onto the levels.The ramp feet were bolted into the ground to keep the systems securely in place.FEATURES INCLUDED:Standard Handrail - this handrail system ensures users always have support to hold onto.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Powder coated Finish – rails are coated with thermosetting powder to provide a non-conductive, non-slip and scratch resistant surface.Telescopic Legs - these can be adjusted to accommodate different threshold heights.EXTRA FEATURE INCLUDED:Yellow Powdercoated Handrails – yellow is one of the easiest colours to see because of its ability to reflect light.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and level changes.
Sponsored
Edinburgh College

Edinburgh College

Forbo Flooring Systems

For the refurbishment of Edinburgh College’s busiest campus, its FM team called upon Forbo Flooring Systems’ Modul’up adhesive free sheet vinyl for its unique ability to be installed quickly and easily, while reducing downtime and disruption to day-to-day college life – as the floor covering could be walked on immediately after installation.
Sponsored
Harbour Central

Harbour Central

Schöck Ltd

The development district now known as London Docklands is an area alongside the River Thames to the East and South East of London. The Harbour Central project involves the construction of a large single storey reinforced concrete basement, high-rise reinforced concrete cores and frames varying in height from 24 to 41 storeys, plus two low-rise reinforced concrete cores and frames.The product used to prevent punching failure throughout the Harbour Central development is the Schöck Bole® reinforcement system. This widely used and trusted Schöck Bole® solution consists of double-headed studs and anchors, with spacing bars, which enable installation after the bottom reinforcement and before the top layer. The two-spacer rods, which are welded to the vertical studs, ensure the correct distance between uprights and the size of the stud heads guarantee a perfect finishing bond with the concrete. As result, when compared with a typical stirrup reinforcement system, an increased shear force resistance of around 70% is achieved. It is cost-effective and timesaving solution and as the Modebest Senior Engineer on site, Sean Togher commented: “The Schöck Bole® product was easy to understand from a reference point of view and we found it really straightforward to install”.
Sponsored
Light and free

Light and free

RENOLIT Cramlington Ltd

A lightweight solution... CHALLENGE A lightweight solution was required for the mounting of the PV installation on a production hall from Opel in Rüsselheim. For some years there existed no smart solutions for PV installations on roofs. Today we start to see the downside of PV roof installations that are not coping well with the weather conditions on top of roof constructions. Common mistakes made on PV roofs: • PV panels flying off the roof due to high winds where the attachments have not been strong enough and not fully tested. • Water leaks due to structural damage from the PV installation itself. Mainly due to the minute movement of the metallic/ aluminium PV-mounting on the roofing membrane. • Water leaks due to perforations through the roofing membrane when fixing the PV installation to the roof. • Roofs collapsing due to an excess of ballast of the ballasted PV installations. • Accelerated ageing of roofing membranes due to the use of incompatible materials on the roofing surface. SOLUTION RENOLIT ALKORSOLAR PV fixing system. This lightweight PV fixing system does not require extra ballast nor perforates the roofing membrane. The main parts of the system are PVC or EVA profiles that are heat welded onto the synthetic roofing membranes. This system is the only system that is fully tested for wind loads up to 200 km/h, has an Avis technique (France) and a DIBT approval (Germany).
Sponsored
Durlum Polylam at The Sands

Durlum Polylam at The Sands

LSA Projects Ltd

The Sands - Durham WaterfrontArchitect: Ryder Architecture LtdInstaller: Pennine ContractsProduct: Durlum Polylam BafflesLSA Projects supplied over 300 linear metres of Durlum Polylam baffles to the new facility The Sands on Durham Waterfront in the city centre. The new riverside development was intended to move the County Council headquarters into the city centre for improved public transport connections for staff and other visitors.In 2022 the building applied for change of use planning to convert the landmark building into additional learning spaces for Durham University Business School. The change of use allows the department of the Russell Group university to move straight into the ready-made facility after delays with their original plans for a different site.The £50m facility has space for the 2,300 students and members of staff at the business school across the 1.4 hectare site. In addition to traditional learning spaces the building has modern working space for staff and academics and hopes to attract leading businesses to work with the university and graduates.Durlum Polylam baffles were used for the feature ceiling in the main event space. The ceiling is made up of 320mm deep 100mm wide baffles in concentric squares with the outer square measuring an impressive 20 metres across. Polylam pieces were finished in a Dur-Graphic faux Cherry veneer print and mounted in 9 double-row rings with alternating strip lighting and integrated ventilation systems.Polylam from Durlum is a versatile ceiling system made up of vertical baffles available in a range of sizes up to 100mm wide by 800mm deep. Pieces can be installed using suspension grid systems available from Durlum in a variety of ways including independent mounting and group mounting with regular spacing and options for demount-ability.Baffles are made from either galvanised sheet steel or aluminium and finished in a choice of RAL colour powdercoating as a standard with options for gloss and metallic finishes as well as Dur-Graphic and Duroplan printed designs. Acoustic perforations can also be applied to the baffles as well as incorporating Dur-Sonic acoustic mineral wool filling to the inside of the hollow baffle lengths.
Sponsored
81 Piccadilly

81 Piccadilly

Cemfloor Liquid Screeds

Project Location:81 Piccadilly, LondonProduct Used:Cemfloor Level PlusCemfloor Level Plus was used in a project involving the renovation of a 5-story building.The buildings existing floor was completely removed to allow for an increase in ceiling height, which necessitated the installation of service trenches for wiring.Cemfloor Level Plus was poured to a depth ranging from 12mm to 60mm above the services, providing a viable floor solution to accommodate the required ceiling room. Additionally a 3mm latex layer will be applied, followed by a 2.5mm vinyl layer.The screed was chosen for its many benefits, including its cost effectiveness and ease of installation which meant that there were significant savings across all 5 floors when it came to time and labour.
Sponsored
The Eden Project Treetop Canopy Walkway | Commercial Non-Slip Decking Case study

The Eden Project Treetop Canopy Walkway | Commercial Non-Slip Decking Case study

Gripsure (UK) Ltd

The world-famous Eden Project in Cornwall attracts one million visitors each year. Gripsure non-slip decking is used in many areas at the Eden Project, with some decks being in place for 15 years. Our products have helped contribute to the attraction’s excellent health and safety record. Treetop Canopy Walkway The Eden Project installed a Treetop Canopy Walkway in the Humid Tropics Biome to give visitors a unique opportunity to experience the rainforest from among the treetops. The walkway needed to be accessible to wheelchairs and buggies, as well as being able to cope with the heavy footfall from the tens of thousands of visitors that visit Eden every year. The Eden Project's Humid Tropics Biome is designed to house over 2,000 species of tropical plants in an environment that will allow them to reach their full potential. This means that the paths, floor surfaces and bridges can be damp. In this severe environment, which is maintained at 30°C and 60% humidity, materials degrade more quickly than in a normal external environment. The Eden Project has strict requirements for sustainable, renewable materials, and a modest budget. Rather than using conventional decking that becomes slippery when wet, Eden approached Gripsure. We supplied them with Gripsure Contemporary non-slip decking. The profile is a plain deck board with two non-slip aggregate inserts that deliver a high slip resistance with a sleek finish. Safety is top of the agenda for a large attraction such as The Eden Project. They required something durable, low maintenance, and above all safe. Eden were delighted with the outcome: "We are very happy with the added safety the product brings for our visitors and we have received excellent service from Gripsure" Canopy Rope Bridge Visitors to The Eden Project can stride out with confidence – even on the new wobbly bridge! The 23-metre aerial rope bridge stretches between two of the 50 metre-high Rainforest Biome’s tallest trees. Fitted with Gripsure non-slip decking, it has a safe and hardwearing surface, so explorers can enjoy a new perspective without any slip ups. The Eden Project selected Gripsure’s Yellow Balau hardwood anti-slip decking. These boards are extremely strong and hardwearing, boasting an expected in-service life of more than 50 years. Gripsure non-slip decking will help visitors safely experience a hot, steamy rainforest as they travel to the treetops. Bamboo Steps Our most recent collaboration with Eden was the installation of Gripsure Bamboo non-slip decking in the Malaysian hut and other areas of the Rainforest Biome. The facilities team chose Bamboo decking for its sustainability credentials, which are so important to the Eden ethos. Moso bamboo only takes 5-7 years to reach maturity and is a net carbon sink over the life span of the product. The non-slip decking boards will provide a safe surface for Eden’s visitors for many years.
Sponsored
Leicester Southern Fire Station

Leicester Southern Fire Station

HD Sharman Ltd.

Upon inspection of this property, Sharmans found the existing gutters corroded and extensive cut edge corrosion to the existing roof sheets. Delamination of the existing roof coating was also present so Sharmans recommended a full gutter and roof refurbishment using the Plygene Gutterline system, Seamsil for cut edge corrosion and the Delcote architectural roof coating system.
Sponsored
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Norwood Group Limited

PROJECT OVERVIEWOrthoplastics is a global leader in the development and manufacture of orthopaedic implants and components, helping surgeons transform lives around the world. This project, the first phase of a fit out programme for a new facility in Bacup, Lancashire, involved the delivery a new cGMP advanced manufacturing area for the production of Ultra High Molecular Weight Polyethylene (UHMWPE) sheets used in the manufacture of orthopaedic implants. The requirement was for a production area that can provide a controlled environment, isolated from the rest of the floorplate, during processing periods, while enabling access by a remote controlled mobile crane to remove the completed UHMWPE sheets when the equipment is non-operational.PROJECT SPECThe new Orthoplastics building is a single storey facility and the size and weight of the UHMWPE equipment required excavation of additional space below ground to accommodate both the machine and the building services required to process materials at up to 2400C. The 1000m2 processing area needs to be a cleanable cGMP compliant environment to avoid the risk of contaminants in materials that will be used in orthopaedic surgery. The partitioning for the perimeter is 11m tall and connected to the ceiling of the existing building shell. To provide the structural stability required for such tall walls, the standard Norwood 100mm Mediline partition thickness has been increased to 200mm. The project also included rapid rise doors for access by the remote control crane that removes the large UHMWPE sheets following the process. The fully demountable double skin bi-panel system enabled a fast and robust installation enabling the project to get back on track quickly following interruption by the pandemic. The panels were prefabricated in-house by Norwood, enabling a fast-track installation programme.Norwood was also designed, manufactured and installed a range of their single and double steel doors in blue.
Sponsored
Stainless Steel Security Rolling Grilles at BMW Motorcycle Showroom, Manchester

Stainless Steel Security Rolling Grilles at BMW Motorcycle Showroom, Manchester

Bolton Gate Company

Bolton Gate were specified to provide the security grilles for the recently completed extension and refurbishment of the BMW Motorcycle showroom in Manchester. In keeping with the prestigious appearance of the building and high-end motorcycles on show, parallel mesh electric grilles in polished stainless steel were chosen to protect the showroom and external windows. In order to remain unobtrusive during trading hours, the bottom rails and side guides were powder coated white to match the surrounding walls and ceiling. For ease of operation, all grilles were electrically linked to allow simultaneous operation.
Sponsored
Axis Madrid

Axis Madrid

EFFISUS

The property, that has been renamed Axis, has four floors and an amazing facade, composed by a structure of beams and supports that cross diagonally. A feature that allows to minimize energy costs, because of the large stainless steel and glass cube that uses the latest technologies to combine a transparent facade with an outer mesh. Effisus Ecofacade SA Edge membranes were used on this project for sealing facade connections. Effisus Pre-Fab True Seal, a pre-fabricated sealing solution, was developed and applied for sealing difficult facade 3D details, minimizing human error possibility.
Sponsored
Multi-Storey Car Park at Pioneer Square, Bicester in Oxfordshire

Multi-Storey Car Park at Pioneer Square, Bicester in Oxfordshire

Lang+Fulton

Pioneer Square is a mixed use retail and leisure development in the the heart of Bicester in Oxfordshire, anchored by a Sainsbury’s superstore and including a 7-screen cinema, offices, library and hotel.As a regeneration project within the city centre, it included a 526 space car park over two levels. Lang+Fulton supplied 134 panels of Terra-34 open mesh grating to act as a security barrier over an area of 1010m2. In addition, 85 panels of Italia-100 louvres in various dimensions were supplied to cover an area of 231m2 which required visual screening.
Sponsored
Moto Services, Rugby

Moto Services, Rugby

BEMO Project Engineering UK Ltd

Over 2,000m² of BEMO N65/400 in stucco embossed aluminium was supplied on the new motorway services for the M6 near Rugby. Lengths of over 60 metres required the panels to be site rolled at eaves height, while the envelope took advantage of the non-metallic GFK halter to ensure resistance to the friction forces associated with thermal movement of long roof sheets.
Sponsored
HASC: Top level occupational safety and emergency care

HASC: Top level occupational safety and emergency care

GKD - GEBR. KUFFERATH AG

Great emphasis is placed on safety in Pasadena, a suburb of Houston, Texas. As America’s oil stronghold and home to NASA’s legendary Space Center, the region is famous for its particularly dangerous and hazardous working conditions. The Houston Area Safety Council (HASC) was therefore established back in 1990 on the initiative of local industrial operations as a non-profit institution to provide safety training. The objective here was to train workers in order to raise their safety awareness as a way of preventing workplace accidents. Some 25 years later, this idea has developed into a leading international training and occupational safety center that trains over 1,500 people every day. Construction of a dedicated occupational health clinic with emergency care represented another key step on the HASC’s holistic support program. The clinic design by Kirksey Architecture gets its distinctive face from the semicircular main entrance. GKD-USA used a new etching technique for the design of the 100 square meter roof parapet, which is made from semi-transparent Omega 1510 stainless steel mesh from GKD – GEBR. KUFFERATH AG. This led to a silhouette-like panoramic view that reflects the dynamic economic region and the everyday working life of the people that live in it.Oil and gas have been produced in Houston for more than 100 years. However, the region experienced a genuine boom from shale oil drilling and fracking. Today, around one third of all oil produced in the US comes from Texas. With its Mission Control Center, which has enjoyed worldwide fame since the Apollo flights to the moon, the Space Center Houston has been just as important for the development of the city. Space flights are still monitored here to this day and astronauts from across the globe are trained for future missions. The city’s skyline is characterized by massive production plants from the oil, gas, chemical and food industries, as well as research institutes and countless buildings of the supply industry, construction and service sectors. The huge influx of workers resulting from the oil boom led to enormous growth of the city. With 2.3 million residents, Houston is today the fourth largest city in the US – behind New York, Los Angeles and Chicago. Starting in 2009, the new campus of the Houston Area Safety Council was created in three construction stages. It was constructed on a 34 hectare site in Pasadena, just 15 kilometers from Houston, that was acquired one year previously. Local architecture firm Kirksey, which specializes in green buildings for industrial operations, planned the entire project. It designed the campus as a one-stop shop for employee selection, training and development, background screening, workplace and site safety as well as company health and welfare services. The first phase of construction focused on the 6,300 square meter training center with twelve classrooms, a 220-capacity auditorium, computer laboratories with 650 workplaces, various convention and common rooms, as well as a car park for 1,000 vehicles. It was opened in 2013 as the new HQ of the HASC. Just one year later, the campus then opened two further large areas, boasting 2,700 square meters each. Providers of tool and workplace equipment, as well as a training center for practical training, complemented the location’s offer from then on. Construction of a 1,580 square meter occupational health clinic with emergency care marked the third and last major construction phase to date. This meant that within a period of just six years a state-of-the-art campus employing the latest training facilities was established, offering 1,500 practical and computer-based training sessions every day – which represents over a million units per year. To cater to these requirements all buildings were equipped to the latest technical standards. They also set standards in ecological and energy-usage terms and are all LEED-certified.Visualization of identityThe Occupational Health Center of the HASC was also planned with a keen eye for detail. Ceiling-high windows create friendly rooms in the clinic that are flooded with light and whose inviting ambience is underlined by a carefully coordinated interior color concept. The challenge for the planners was to make the atmosphere light and pleasant, yet robust enough to withstand the rough day-to-day operations with heavy footwear or soiled work clothing of the patients. A fully-glazed semicircular entrance area underlines the building’s welcoming effect. Its raised canopy bears the clinic’s name and also creates the stage for one of the rooftop parapets made of stainless steel mesh that follow the semicircular building form. The shimmering texture combines technical aesthetics with a large number of functional performance characteristics. The mesh thereby guarantees efficient solar protection for the recessed windows on the top floor, while granting unrestricted views of the beautifully sculpted green spaces on the campus. Despite its sophisticated appearance, it also offers reliable protection from the hurricanes regularly encountered in the region. Low-maintenance, durable and almost completely recyclable at the end of its useful life, the mesh supports the LEED-certified sustainability of the building. For the architects, however, the decisive impetus for selecting this material came from the specific mesh design, which facilitates imaging by etching. Their design included an illustrated balustrade as an identity-creating element of the clinic that visualizes working life in the region and thereby also the focus of the HASC. The image developed by Kirksey shows the skyline of Houston with skyscrapers, drilling rigs, chimneys and cranes together with the people that work there. This complex perspective was applied to the stainless steel mesh in a silhouette-like form using a special etching process developed in-house by GKD-USA. The smooth surface and relatively tight structure of the Omega mesh provided ideal prerequisites for this. Using blasting abrasives, GKD modified the metallic surface in such a way that the template, which was highly filigree in places, appeared finely contoured. When using etching, all surfaces that are to remain untouched are usually masked off carefully. However, the complexity of the motif specified by the architects at Kirksey presented the mesh specialists with the challenge of designing multiple levels to lend the image the desired spatial depth. Unlike a painting, with etching it is not possible to achieve dimensions, perspective and depth simply by using different colors. In comprehensive tests, GKD therefore developed a process with which the design template could be blasted with the desired level of detail and spatial effect. This led to a visually seamless panoramic view of the hustle and bustle in the region over a total area of 100 square meters, comprising seven panels – each measuring 3.4 x 4.3 meters. Without any further surface treatment, this imagery is both permanently weather-proof and UV-resistant. Depending on the incidence of light and the viewing angle, the images can appear either transparent or opaque. At night, spotlights lend the scenery the appearance of a shadow theater using targeted light accents.
Sponsored
Robsinson's, Dubai

Robsinson's, Dubai

SAS International Ltd

Bringing a variety of new brands to the region, Robinsons is located in Dubai Festival City is the first in the Middle East. SAS International supplied a bespoke SAS200 system to the project to match with the urban brand decor. Using a traffic grey coated panels, SAS200 was selected to smoothly integrate with the clients choice of wall panelling. Designed by the SAS Dubai Technical Team, a 19mm diagonal-pitch perforation was also developed to compliment the industrial look of the fit-out. A concealed grid product, the system gives access to M&E services while providing a continuous look.
Sponsored
2 Semple Street, Edinburgh

2 Semple Street, Edinburgh

SAS International Ltd

2 Semple Street offers six floors of Grade A office space. With an impressive and sustainable specification, the building boasts EPC 'A' and BREEAM 'Very Good' ratings. Offering design flexibility, the popular SAS330 was specified for the main office floorplates. For the reception area, SAS600 feature rafts had an oblong perforation that oversailed the tile edges. With this prime city centre office offering prospective tenants an exceptional specification throughout, SAS International has once again provided high performance ceiling systems that make the grade for cutting edge commercial office buildings.
Sponsored
Residential Development, Galway, Ireland

Residential Development, Galway, Ireland

Advanced

Fire and security service providers, Securecom Claddagh Ltd, carried out the replacement and upgrade of an ageing fire alarm system, installing a Go panel in each of the three-storey apartment blocks.A Go panel was installed near the front door of each building, covering their hallways and landlord areas. The panels were hard-wire integrated with Apollo detectors and with a CSL fire-specific remote monitoring communication device that communicates to an alarm receiving centre, allowing the relevant key holders to be informed when triggered.Securecom Claddagh has been using Advanced fire panels for a number of years in its projects due to their ease of programming and standardisation across sites, as well as the panels allowing effective technical phone support from Advanced in the event of a fault or unwanted alarm.
Sponsored
Wythenshawe Hospital

Wythenshawe Hospital

Inpro

ClientManchester University NHS Foundation Trust (MFT) Market SectorHealthcare The Project BriefWythenshawe Hospital is a major acute teaching hospital part of the Manchester University NHS Foundation Trust (MFT). Its area of specialisms includes cardiology and cardiothoracic surgery, heart and lung transplants as well as cancer and breast care services and supports patients from across the North West and beyond.During the upgrade of the Emergency Department (E.D) the team decided on both protection and preventative measures to ensure only the highest of standards were adhered to which were in line with the Hospital’s renowned reputation. The SolutionIntastop Ltd was chosen to supply and fit a range of protective products designed specifically to integrate seamlessly with the hospital aesthetics.They included Bed Head Protection, Hand Rails, Sanparrel® Wall Sheet and Corner Guards from the Inpro product range in addition to Intastop’s innovative I-Gienic Smooth Hygienic Sheet and Rigid Frame Guards. Impact protection sheet along with the other products installed at Wythenshawe Hospital boast a plethora of benefits including high impact resistance, Class ‘O’ Fire Rated; tested to BS476 Parts 6 & 7 and available in a variety of colours. Additional Benefits of Impact Protection SheetEnsures staff and patient safety in the event of a fire by maintaining fire integrity of the surface.Protects against localised damage.Maintains a clean, safe environmentAchieves colour contrast for critical surfaces to assist with visually impaired staff and patientsWhat the client saysMarcus Ashurst, project manager for the emergency department said“With a collaborative approach from the inception of the project through to completion, the Trust was mindful that the new emergency department operating 24 hours a day would require careful thought and consideration with regards to the finishes selected. With leading healthcare architects IBI plans were drafted with full engagement with the clinical teams to develop an extremely well-considered and effective design – fit for purpose.Working with Interserve, the principal supply chain partner appointed to construct the new development, Intastop were nominated to supply and install a fully comprehensive system of door and wall protection that would not only withstand and protect the built environment, but also enhance the aesthetics of the environment. The holistic approach taken and end result was indeed most satisfactory.”
Sponsored
Marston Equestrian Building

Marston Equestrian Building

Eternit

Eternit profile 6 fibre cement roof sheets in Laurel Green and natural Yorkshire boarding, was specified on Marston Equestrian Building to help the building blend in with the surrounding agricultural land. As well as providing excellent noise and thermal insulation, the composition of the high strength fibre cement reduces condensation within the building, which is important when multiple horses and riders are exercising inside.
Sponsored
George Abbot School

George Abbot School

Bauder Ltd

George Abbott SchoolBauder Thermofol single ply waterproofing system with Bauder Euroglaze rooflightsSynopsisLocated in Guildford, George Abbot School is a secondary education school which provides education for 2000 people aged 11 to 18. The school had a history of leaks in the DT rooms above which a profiled sheet metal roof was installed.Following many attempted repairs, Bauder was commissioned to carry out a roof survey on the 228m² profiled sheet metal roof. The report identified issues with not only the gutter area, which was originally believed to be the problematic area, but also with the adjoining profiled roof and also with the large rooflight unit.Bauder Building BoardProject: George Abbott SchoolLocation: Guildford, SurreyRoof Area: 228m²Specifier: Baily GarnerApproved Contractor: Inspire Contract ServicesThe specification Bauder submitted a proposal to refurbish all areas of the failing roof:The gutter area needing standing water to be removed for which Bauder tapered insulation was proposed to create effective drainage falls.The adjoining profiled sheet metal roof requiring a new waterproofing system. The Bauder Profiled Roof Overlay system was determined to be the best solution, using bespoke profiled insulation boards specifically designed to fit the shape of the roof. The Thermofol U15 Fleece Back membrane was then specified as the waterproofing layer providing a robust yet lightweight waterproofing system to the roof.The existing rooflight unit, being one of the problematic areas of the rooftop, was also replaced with Bauder Euroglaze rooflights. Products appliedInsulation infill systemIntended for refurbishing profiled sheet metal roofs or increasing the thermal performance of existing insulated cladding systems.Bauder Euroglaze rooflightsModular rooflight designed to provide high standards of illumination, insulation and ventilation to the interior of flat roofed buildings. These are made to order and the size can therefore be tailor made to fit any roof aperture. The resultBauder approved contractor, Inspire Contracts, installed the roof system and rooflights. Bauder’s expert site technicians carried out over 10 site visits during the 4 months of works on the site. Following a final site visit and a leak test Bauder was able to issue a 20 year product and workmanship guarantee to the client.The choice to use Bauder, a single source of manufacturing for the roof systems and the rooflight, proved beneficial as it enabled Bauder’s flat roof technician team to design out a number of the detailing issues responsible for the historic leak problems and it also eased the installation process for the client and the approved contractor, as Bauder provided its integral service from the roof survey to the final site visit and the issue of the guarantee.System installed Bauder Thermofol PVC single ply waterproofing system 1 Bauder THERMOFOL U15 FRA 1.5mm thick, reinforced PVC waterproofing membrane. Stated within BBA certificate 06/4354, the Thermofol PVC waterproofing membranes have a service life in excess of 35 years. 2 Bauder PIR MTissue-faced flat board insulation, benefitting from a zero ODP and a Green guide rating of ‘A’.3 DeckProfiled sheet metal
Sponsored
Heron Tower, London

Heron Tower, London

FOAMGLAS®

FOAMGLAS® READY BOARD T4+Design Architects: Kohn, Pedersen, Fox Associates – KPF London, Marcus BlanesMain contractor: SkansaConstruction: 2011Application: Compact Roof - FOAMGLAS® Ready Board T4+Finish: Umicore VM ZincThe roof level 41 of the Heron Tower (with a height of 120m) is designed to the most exacting standards for sustainability and efficiency.The building received the BREEAM rating of 'Excellent', with FOAMGLAS® thermal insulation being part of a green and energy efficient building. The roof is composed with FOAMGLAS® READY BOARD insulation and Umicore VM Zinc roofing as a durable finish.FOAMGLAS® insulation has the ability to withstand high structural loads and has developed a special fixing system for metal roofing.Square metal fixing plates are inserted into the upper surface of the insulation and covered with a waterproofing and a separation sheet.This is the perfect system to fully support metal standing seam roofing which is screwed to the metal plates without thermal bridging between the metal roof sheet and the building structure.
Sponsored
Stoke Gifford Rail Depot

Stoke Gifford Rail Depot

Lionweld Kennedy Group

Working for Hitachi Rail, Lionweld Kennedy supplied open mesh flooring, handrails, stairs and removeable chains to 3 number 250 meter long inspection walkways and 18 number 27 meter long access platforms.Making use of our safegrid and saferails, Lionweld Kennedy provided Stoke Gifford Rail Depot with safe and efficient platforms for inspection. The site is part of a wider £5.7 billion development on the Great Western (GWR) and East Coast Mainlines. For the next 17 years at least, it will serve as a crucial maintenance facility for Hitachi Rail Europe’s service delivery operations.
Sponsored
V&A, Dundee

V&A, Dundee

SAS International Ltd

SAS International delivered visually-striking, sustainable ceiling solutions in V&A Dundee. To complement the shape of the building SAS600 ceiling rafts were chosen. Presented with a unique mesh texture, SAS600 accentuated the open-plan layout of the light foyer. SAS730 was selected for its alternative aesthetic finish and ability to allow airflow in areas such as the exhibition space. Providing a more premium motif, SAS740 tapered baffle were specified to ensure easy maintenance without compromising the product’s geometric design. Working with the design team, SAS developed a bespoke extrusion shape for the linear ceilings to meet this requirement.
Sponsored
London Drinks Manufacturer has FasTop RS69 as heavy duty flooring solution

London Drinks Manufacturer has FasTop RS69 as heavy duty flooring solution

Sherwin-Williams

Sherwn-Williams demonstrated what technical assistance can be provided on projects before any quotations or specifications are organised. A low viscosity primer Resutop Binder was recommended as a penetrating primer to case harden and consolidate the screed. Epoxy screed repairs were installed where required to make good any damaged areas. Once a sound substrate was established Resuprime MVT moisture tolerant primer was installed incorporating a fabric mesh over all joints and pitted areas to reduce any potential cracking of this substrate, followed by 9mm thick FasTop RS69 polyurtehane screed.
Sponsored
Economical housing replaces factory: Merker-Park, Baden, Switzerland

Economical housing replaces factory: Merker-Park, Baden, Switzerland

Hawa Sliding Solutions AG

The Merker site in Baden now houses 45 low-cost apartments where the enameling plant once stood. The five-story structure sets new standards with regard to insulation and energy consumption. Architects Zulauf & Schmidlin have designed 45 apartments as the second stage of converting the site of the former Merker factory in Baden. The owners wanted an energy-efficient building and apartments with different layouts – suitable for singles and families. The folding sliding shutters made of lasered, perforated metal plate are equipped with the HAWA Frontfold 20 hardware.The shutters are powered by the building's electric system.
Sponsored
Vertical Rainscreen Cladding Panels at Chelsea Waterfront, London

Vertical Rainscreen Cladding Panels at Chelsea Waterfront, London

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Lots Road, Chelsea, LondonProject Type: HousingDevelopment Cost: £60mProduct: Rainscreen CladdingMeridian Wall CopingsShadex 150 Privacy ScreensPerforated Secret Fix Soffit Panels (To Balconies)Finish: Syntha Pulvin RAL 7012 Matt Basalt Grey S4L0891: Qualicoat 2Fire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: CK Asset Holdings LtdArchitect: FarrellsMain Contractor: Rollecate Facades LtdSub Contractor: Rollecate Facades Ltd
Sponsored
LogMeIn

LogMeIn

SAS International Ltd

Working with a design concept from FKM architects, SAS International developed a hybrid ceiling based on their existing SAS500 offering. This tailor-made system was formed to incorporate the intricate design pattern while maintaining the systems stability. The perforated baffles installed in LogMeIn incorporate an acoustic backing pad and are finished in a Calm White shade. Chosen for its superb acoustic properties, this bespoke baffle solution offers an eye-catching and unique ceiling. The bespoke linear system is a unique feature of the office and lends itself to SAS’ design and manufacturing capability to take on complex and challenging designs.
Sponsored
DHL Supply Chain, Barming Depot in Aylesford

DHL Supply Chain, Barming Depot in Aylesford

Ampteam Ltd

210 Metres of Unifold Gutters was installed at the DHL Supply Chain, Barming Depot in Aylesford.Installed by Blenheim Roofing, the project was a full strip & re-sheet of an asbestos cement roof.During initial surveys it was discovered that historically, the existing asbestos gutters were prone to leaks and overflow issues into the building.Unifold was not only used to line the gutters to cure the leaks but also increase the capacity.
Sponsored
Terra-34 Architectural Grating used as facade for new extension at Donegal Garda Station

Terra-34 Architectural Grating used as facade for new extension at Donegal Garda Station

Lang+Fulton

The new extension for the Donegal Garda is a prominent feature utilising materials that respond to its topology and enhance the building’s civic presence in the town. The dark coloured brick plinth of the semi-basement grounds the building while the upper floors which feature a facade of open mesh grating provide an open and transparent interface with the public whilst maintaining necessary security provisions.Lang+Fulton supplied the bespoke steel mesh cladding for the glazed upper floors of the facade. The grating achieves a contemporary aesthetic and delivers the practical advantages of protection and a brise-soleil solution, while achieving a transparency that offers the public an insight into the activities of the station; the degree of transparency and solar shading creating an interesting variety, dependent on the angle of view, the time of day and light conditions.The Terra-34 grating, which features an anti-climb aperture, was also used to create walkways, soffits and a secure enclosure around the roof-top plant. The gratings were made to 19 different custom-sizes and shapes for each floor with 3038mm high panels for the facade cladding. Slotted tabs were designed for fixing to the support steelwork. The material was supplied in a hot-dip galvanized finish to withstand the coastal environment.Donegal Town Garda Station has won 4 national awards including Best Cultural/Public Building (RIAI). Adjudicators said that, “The project stands out for its laconic civic presence and its no-nonsense adaptation of the spatial culture of a thriving historic town … the building demonstrates that thoughtful architecture can quietly and carefully edify our everyday culture”.
Sponsored
St George's Hospital, Roehampton

St George's Hospital, Roehampton

Rapid Ramp Limited

REQUIREMENT: Two temporary laboratories were planned for installation in the hospital parking lot.It was determined that a ramp with a wide platform was necessary to accommodate the diverse range of daily users of the system, including those operating patient-moving equipment, carts, and pedestrians accessing the cabins.END RESULT:A fully compliant ramp featuring an extra-wide metal walkway was designed and successfully installed. This product boasts a secure loading capacity of over one ton!FEATURES INCLUDED:Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp or step. Additionally, it helps users distinguish any level changes.Infill Handrail - if the ramp height exceeds 380mm, Infill handrail is a requirement to prevent users from climbing or falling through gaps.1100mm High Rail - 1100mm handrails are attached to any level sections.Mesh Platform – a self-draining mesh platform allows water to pass through rather than puddle on the surface and potentially freeze. Minimum width: 1500mm.Rest Platform - a rest platform at 5 metres is required to allow the user to pause.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Standard Continuous Handrail - this handrail system ensures the users always have support to hold onto.EXTRA FEATURE INCLUDED:Yellow 900mm High Handrail To Ramped Sections – designed to be gripped by children and wheelchair users. A bright colour such as yellow is generally the easiest to see because of the colour's ability to reflect light.
Sponsored
Weigh Cabin Platform & Steps, Birmingham

Weigh Cabin Platform & Steps, Birmingham

Rapid Ramp Limited

PROJECT BACKGROUND: The construction of weighbridges and a weigh cabin.The cabin will be elevated 1.5m above ground level on support columns.Lorries will drive up to the cabin for initial checks before the weighbridges are used to calculate the load by weighing the lorry when empty and when loaded.REQUIREMENT:A walkway around the cabin in a L shape with steps to allow the site operatives access. ADDITIONAL INFORMATION:2D and 3D CAD drawings were created by our designer in-house. These were given to the client with their quotation.END RESULT: A Rapid Ramp platform was raised around 1.5 metres high and included steps. The appropriate height was reached with adjustable telescopic legs. Plus, cross bracing was achieved using longer length tubes to ensure rigidity under all platform legs.The system was completed within a quick three-day turnaround time.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of a step or level change.Trombone Ends - these are added to the ends of a step unit to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour: Black - Black is the standard handrail colour. Handrails are powder-coated to create a durable finish that is tougher than conventional paint.
Sponsored
Lincoln Cathedral, Lincoln

Lincoln Cathedral, Lincoln

Rapid Ramp Limited

REQUIREMENT: In order to enhance wheelchair accessibility to the cathedral, it was necessary to install both internal and external ramps to overcome the steps.END RESULT:Great care was exercised when installing the ramps to preserve the cathedral's floors and walls. These ramps do not require any ground or wall attachments; once the components are securely bolted together, their weight ensures stability. Additionally, slip-resistant rubber tiles have been placed beneath each support foot.Should wedding parties wish to take photos at the entrances without the ramps in the frame, these systems can be easily disassembled before the event and reinstalled afterwards. This flexibility is a unique advantage neither wooden nor concrete ramps can offer.FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate threshold heights.Standard Colour Black - ramps are powder-coated black to create a hard finish that is tougher than conventional paint.EXTRA FEATURES INCLUDED:Infill Handrail - this product prevents children from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and helps users distinguish any level changes.Standard Step Unit - an ideal addition to any ramp installation, providing the access needed for able-bodied users. They can also be stand-alone units, independent of the Rapid Ramp System.
Sponsored
HSBC Bank Leeds

HSBC Bank Leeds

CLD Physical Security Systems

The White Rose Office Park in Leeds; is a purpose-built 27-acre business park owned and operated by Munroe K. In 2014, they unveiled a £12m office for the global banking giant HSBC.Utilising in-depth knowledge, that Munroe K had about their client and the local area; the project had a number of specific requirements that needed to be addressed from the start.The BriefSecurity and Aesthetics were the two key areas taken from the client’s requirements for their car park security fencing. These included the following:A fencing system that would provide open ventilation for the car park.Additional high security fencing to the rear of the car park due to the construction of plant and control equipment compounds.Anti-climb and anti-cut properties to all fencing systems.Aesthetically pleasing without compromising on the inbuilt security.After working through the wide range of car park security fencing systems in the CLD range, the client selected Safeogril Open Mesh Fencing for the front of the car park and Securus 358 Anti-Climb Mesh Fencing System to secure the rear. They required the front of the car park to look visually pleasing and; at the same time, fit within HSBC’s brand to complement the new offices. Alongside the aesthetics, the architects wanted the car park security fencing systems to still encompass a wide range of security features in order to keep the car park secure.The installation was completed by Davison Fencing, a member of CLD Systems Approved Contractors, working with ourselves and the architects for the duration of the installation process.
Sponsored
Westfield, Stratford

Westfield, Stratford

Berry Systems

Vehicle and pedestrian safety barriers for edge protection on perimeters, ramps and other areas in three multi-storey car parking at a new shopping mall adjacent to the London Olympic Park.Berry Systems installed one of our largest ever car park safety barriers projects at Westfield Stratford City with over 7 kilometres of Berry Beam barrier, all mounted on our impact absorbing spring steel buffers.The £1.5bn Westfield Stratford City complex covers an area of 1.9 square miles and houses 300 retail outlets, 70 food outlets, 3 hotels, multiplex cinema, bowling alley and casino. It also has 5, 000 parking spaces across 1 adjacent and 2 integral multi-storey car parks. The safety barriers were very carefully specified by architects: Buchan Group International. The car park structures are metal framed with concrete decks with an exterior expanded metal mesh surround and cladding. All floors have our Berry safety beams mounted on RB1X and GH spring steel buffers to provide full perimeter protection meeting BS EN 1991-1-1 and BS 6180 standards.All the ramps in the two overground car parks have curved Berry Beam barriers to match the varying radius of the ramps. On tighter bends and at ramp exits, chevron signs have been mounted directly to the barriers. All ramp returns and split level areas are protected by our barriers, again mounted on RB1X buffers with handrail extensions and anti-climb mesh.
Sponsored
Fast, sustainable construction of fibre reinforced floor slab for London academy school

Fast, sustainable construction of fibre reinforced floor slab for London academy school

Tarmac

This major redevelopment of Charlton Park Academy school involved replacing temporary mobile classrooms and a single storey building with a two-storey steel framed brick building to better meet the needs of students, teachers and carers. A structural flooring solution was required for use over precast planks, covering 800m2 on the ground and upper floor at a depth of 75mm to 120mm. Space and access would be challenging, due to the small footprint of the site, proximity to the existing school building and access from a busy main road. Given the large floor area, a traditional sand cement screed would have been very time consuming to place. Tarmac’s TOPFLOW SF a self compacting steel fibre reinforced concrete was chosen as the solution. Its flowing nature would allow it to be quickly pumped into place and adapt to the variable thickness criteria. TOPFLOW SF is designed to act as a structural topping with both, steel mesh & fibre reinforcement. The steel fibres added to the TOPFLOW SF gave its robustness and flexural strength as it was being placed over a precast plank system that could flex with loadings. They also reduced the risk of cracking. By replacing steel mesh reinforcement, it helped avoid problems with access, storage and handling and kept the site open for parallel trades. Using TOPFLOW SF rather than a sand cement screed or reinforced concrete, improved productivity and saved time. This saved 13 days or just over 2.5 weeks on the programme. 
Sponsored
Davit Arms - They are not sugar cubes

Davit Arms - They are not sugar cubes

Sayfa Group Ltd

The number of Davit Arms required for a project should not sound like the quintessential British question of "one lump or two" for your cup of tea.It should depend on the specific project parameters but it is a question we are often asked, even if the employer's requirements or access strategy specifically identify a quantity.There are however a few definitive requirements. If the system is designed for single users (due to roof/building structural load limitations for instance), then two Davits must be provided to facilitate safe rescue. Equally, although Davits are component form and portable, the units are not light to carry between buildings, might be too large for service lifts and no one even wants to think about the stairs - the buildings being cleaned by rope access for a reason!Additionally, the duty holder and building owner should consider cleaning times and crew efficiency. Responsible IRATA contractors operate in a team of three, with one level 3 supervisor and two operatives. With a single davit, two of the team are effectively non-productive.Finally, it can be that multiple outreach davits are required. The projection requirements can vary depending on rooftop socket locations, parapet sizes, and façade elements. For extended cleaning cycles, Davit arms should project so that there is a naturally extended reach.Leave the one lump or two questions for your cup of tea, or number or shots of espresso if you prefer……….

Showing 253-288 of 425

Feedback