Over 2,000m² of BEMO N65/400 in stucco embossed aluminium was supplied on the new motorway services for the M6 near Rugby. Lengths of over 60 metres required the panels to be site rolled at eaves height, while the envelope took advantage of the non-metallic GFK halter to ensure resistance to the friction forces associated with thermal movement of long roof sheets.
No featured products in this case study
Contact BEMO Project Engineering UK Ltd by clicking the button below to find out which
products were used in this case study.
More inspiration from BEMO Project Engineering UK Ltd