NBS Source
I'm a manufacturer

"liquid fuel tanks"

1,460 results found

Sort by:

Showing 145-180 of 237

Sponsored
Old Granada Studios

Old Granada Studios

MOY

Part of the prestigious St. Johns development in Central Manchester, was formerly the location of Granada TV Studios and overlooks the cobbles of the former Coronation Street set where the facade of the legendary Rovers Return can still be seen by the turnstile at the entrance to the site. The Old Granada Studios project has been delivered by B&K with the roofing installation carried out by approved contractors S1 Roofing. The project features a full MOY Specification comprising Paromelt Hot Melt Liquids on the main roof at level ten and the level eleven stair core, and on the level 9 balcony along with a RBM warm roof on the level 12 lift over run.
Sponsored
Aberdeen Railway Station, Scotland

Aberdeen Railway Station, Scotland

Sika Limited

Aberdeen Railway Station is the UK’s busiest station north of Edinburgh and Glasgow and is listed is listed as ‘Category A’ by Historic Environment Scotland. The station building has a glazed canopy roof, which needed a full upgrade. This included replacement of the glazed roof area and waterproofing of the gutters around the perimeter of the canopy and of the plinth that connects the gutters to the glazed roof, forming the base for all maintenance walkways.The project had to be carried out without interruption to rail services or disruption to passengers, while adhering to strict health and safety requirements.Components:Sika Liquid Plastics Sikalastic®-825 -625.Metal Primer.S-Vap 5000 SA.Sika® Primer 600.
Sponsored
Cement based floor screed solution for underfloor heating

Cement based floor screed solution for underfloor heating

Tarmac

A new flooring solution was required as part of a large, high-specification selfbuild housing project on the stunning Archerfield estate in North Berwick. Underfloor heating had been specified for the ground floor of the house and it was important that the chosen floor solution would help to optimise heating efficiency. Given the scale of the project it was also important that the chosen screed solution could be installed quickly over a large area to fit within the build programme. Following initial discussions and a successful pump trial the customer decided to use Tarmac’s TOPFLOW Screed C cement based liquid screed.TOPFLOW Screed C is a free-flowing, cement based liquid screed that can be trafficked after just 24-48 hours and dries within 21-28 days. It can be pumped into place and allows large areas to be covered quickly with up to 120m2 laid in as little as 45 minutes. Fast drying times mean it can be laid later in the programme when the building is fully water-tight and still hit deadlines for installation of flooring. It is ideal for use with underfloor heating systems. As a self-compacting screed, it fully encapsulates heating pipes without leaving any voids and is also a more conductive medium than traditional sand and cement screeds, improving the thermal performance of the system. It is also compatible with most cement based adhesives meaning it can be used with a wide range of flooring types.The fast-drying times and early trafficking characteristics of TOPFLOW Screed C enabled other trades to follow on quickly, helping to provide continuity and efficiency within the client’s build programme. The contractor was delighted with the outcome, commenting on how good the material was to work with and on the excellent finish achieved.
Sponsored
Tesco Express Store - Shaw, (near Rochdale).

Tesco Express Store - Shaw, (near Rochdale).

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi Access – Bespoke access platforms. Services: Existing condensers. Roof build-up: Existing warm roof design (bituminous felt) – Overlaid with a liquid applied plastic waterproofing layer. An operational Tesco Express store, in the heart of the Shaw community, that had existing high level rooftop condensers requiring annual maintenance. Pump House supplied a safe access solution around two existing high level condensers. Pump House carried out a site survey and provided full working AutoCAD drawings for approval. The access solution was manufactured in smaller modules which facilitated easier lifting and fitting. Pump House attended site on the day of installation.
Sponsored
Burton Green Primary School

Burton Green Primary School

Polyroof Products Ltd

Burton Green Primary School is located in the historic city of York, an outstanding school at the heart of a local community this primary school strives for excellence. The challenging and nurturing learning environment allows children to learn and grow, while achieving the highest potential possible in all areas of the 21st century curriculum.When the roof began showing signs of ageing, it was clear that a long-term solution was required. Working with Project Managers Charles Garth and Principal Contractor Castle Special Projects, Polyroof would work towards providing the best solution to refurbish the ageing roof.The work required and condition of the roof needed to be established first, to do this a survey was scheduled to take place. The survey was conducted on roofing area and it was determined that there were 6 flat roofs that required refurbishment. Areas 1 to 2 were constructed of a built up felt with mineral cap sheet, 50mm PUR insulation, bituminous vapour control, asphalt, 12mm fibreboard and a 50mm woodwood slab deck with timber joists. Areas 3 to 5 were constructed of a built up felt with mineral cap sheet, 50mm Jablite insulation, bituminous vapour control, asphalt, 12mm fibreboard and a 50mm wood wool slab deck with timber joists. Roof area 6 was made up of built-up felt with mineral cap, plywood and timber joist. The original build-up of roofs 1 to 5 needed to be stripped back to the asphalt due to the aged condition of the built-up felt, numerous leak reports were reported. Roof 6 and its original waterproofing was to be retained and made good, later this surface would act as the substrate for the new waterproofing system.Once the survey was completed, a bespoke specification was written and it was recommended that the roofing areas would all benefit from a high-performance waterproofing system. In addition to this it was specified that the roof would be thermally upgraded to reduce the risk of condensation and provide lower fuel bills and energy consumption for Primary School further adding benefits to making improvements to the roof.Liquid Roofing Limited an experienced roofing contractor and Polyroof Approved Contractor was chosen to undertake the work to this project. The proposed system for this project would be Polyroof Protec Warm Roof System. Protec’s liquid roof membrane has a unique flexible hybrid polymer formulation and can be applied to virtually all common roof surfaces.The areas that were required for installation firstly needed to be stripped and removed back to the asphalt, areas 1 to 5 required this. Area 6 was then repaired of any defects and made good where necessary. All roofs required a deep clean, removing any dirt or debris that remained from the first stage. Once this preparation was completed an Air & Vapour Control Layer (AVCL) was then installed to roof areas 1 to 5 making sure that all surfaces are smooth and without voids.Using a Polyroof Twin Pack Insulation Adhesive the Polyroof RES insulation (T&G) boards were bonded and laid to each of the 6 roof areas completing the second stage of the warm roof upgrade. Before the last stage of the installation could begin all joints in the insulation were sealed using taping matt and Polyroof Protec Resin. Polyroof’s extra-tough GRP trims were then installed to create neat and robust edge detailing for exposed perimeters before the main Protec system application commenced.During the project there were some challenging aspects that required care and attention. The project featured a large array of different details ranging from installation of new substrates and trims for parapet walls to the removal of and preservation of tiles/cladding so that the Protec system could be applied correctly. These features required delicate work so that the original tiles/cladding could be reinstated after the application of the system was completed. During the project the rooflight that was originally in place was removed and replaced with a new, before this could happen the Protec system was taken up the upstands and then sealed under flange.Once the project was completed within the relevant time frame of the client and within the budget specified, the Polyroof Technical Services team conducted a detailed inspection showing a high level of workmanship which lead to the client gaining the trusted Polyroof Accredited System Guarantee.
Sponsored
ABG blueroof - Rooftop Stormwater Attenuation, St James Quarter, Edinburgh, UK

ABG blueroof - Rooftop Stormwater Attenuation, St James Quarter, Edinburgh, UK

ABG

St James Quarter is an impressive new galleria retail shopping centre and residential development that rejuvenates a large area of the New Town in Edinburgh city centre. The site was formerly occupied by a dated 1960s era shopping precinct, and with the exception of the John Lewis store, all of these old buildings have now been demolished to make way for the new development. The £1 bn project creates 850,000 sq. feet of new retail space, with a capacity for 80 units focussed on high-end retail alongside the Bonnie & Wild’s Scottish Marketplace and Food Hall.Such a large city centre development is subject to strict planning conditions for the management of surface water. The Water Environment Regulations3 (CAR regulations, Scotland) require all surface water from new developments to be attenuated and treated by a Sustainable Drainage System (SuDS) before it is discharged into the water network. The aim of SuDS is to mimic natural drainage, encourage infiltration and attenuate hydraulic impacts to minimise downstream flood risk. Excavating underground storm water storage tanks to control surface water run-off was not possible since three levels of basement parking are incorporated beneath the retail centre. Even where possible, basement tanks are comparatively expensive compared to roof level attenuation systems, with high spoil disposal costs, increased safety risks arising from the excavation activities and a large carbon footprint incurred as a result of the number of additional site vehicle movements.The proposals for drainage and SuDS at the St James Quarter development were mainly focussed on the large 15,000m2 catchment area on roof level 5, with 4,734m2 of 80mm deep attenuation void capacity installed by ABG’s installation division ABG Installs. The blueroof system treats and restricts storm water that deluges onto the roof before it is gradually released over a number of hours via outlet control and filtration chambers to the underground drainage system.The attenuation and restrictor chambers on level 5 (east and west of the soon to open central circular W hotel building) and onto balcony areas 1 and 2 at the front and back of the upper apartment buildings, are supplemented with an additional of 2,280m2 of ABG Roofdrain geocomposite, installed at the base of rooftop planters to provide a connected drainage and irrigation / reservoir layer as part of the landscaping design.ABG calculated and designed the required attenuation capacity, including a new diffuser chamber solution to control water outflow at downpipes.
Sponsored
Alderley Park, Science and Innovation hub

Alderley Park, Science and Innovation hub

Garland UK

Formerly the home of AstraZeneca, Alderley Park is a world-leading life science and innovation campus situated across 93,000 sqm on the outskirts of Manchester city centre. With a mix of new-build waterproofing requirements and existing roof refurbishments, the client appointed Garland UK as a roofing partner across the multi-building site. Alongside the refurbishment and new-build site works, Garland UK was also briefed to provide a tailored design specification for the Glasshouse Project, which would become the largest triple pitched standing seam roof in the UK.Garland UK's 3 system portfolio of high-quality bituminous membranes, cold applied liquid coatings and profiled metal ensured that each roof would get the right system for its unique challenge.
Sponsored
Luxury Car Valeting Centre, Belfast

Luxury Car Valeting Centre, Belfast

Dura Composites Ltd

d² Dura Grating Mini Mesh and Solid Top Raised Flooring | Case StudyNew Glass Reinforced Polymer (GRP) Mini Mesh and Solid Top d² Dura Grating is the ideal raised flooring solution for luxury car valeting centres, car workshops and other automotive facilities thanks to its lower cost, weight saving and improved visual inspection capability versus previous generation grating.The Dura Composites raised flooring solution is a full design and supply system, incorporating both the raised pedestals, floor grating and mounting system. The unique d² Dura Grating design also allows for improved visibility of the substructure below, offering a clear view of draining liquids from the valeting process from a much wider range of angles than were previously achievable.
Sponsored
Long lasting car park surface for police centre

Long lasting car park surface for police centre

Tarmac

As part of a £44m project to build a major new police operational command centre, surfacing was required for the large parking area and access roads. The parking area would be used by more than 1,200 officers and support staff and a wide range of vehicles from police cars to heavy goods vehicles. Originally an AC 10 close graded surface course material had been specified. However, after early engagement with the surfacing and main contractor, it was clear that a more robust and durable solution was required that could withstand the high volumes of traffic using the site.Tarmac’s ULTIDRIVE asphalt was chosen as the solution. Designed to resist the long term effects of daily vehicle movement, ULTIDRIVE is a high performance asphalt with a smooth and highly durable finish. An advanced modified binder enhances the toughness of the surface, provides improved resistance to scuffing and abrasion from power-assisted turning and reduces softening in hot weather. It also gives enhanced resistance to temporary fuel and oil spills compared to conventional asphalt surfacing.
Sponsored
ABG blueroof, Rooftop Stormwater Attenuation, FoSS Building, Sheffield, UK

ABG blueroof, Rooftop Stormwater Attenuation, FoSS Building, Sheffield, UK

ABG

The 16,500m2 new Faculty of Social Sciences building is designed to meet the future growth demands of the department up to the year 2035 and creates a world class, BREEAM outstanding building that encourages collaboration and enhances the Faculty’s reputation for excellence in teaching and research.The landscape design for the new University of Sheffield building set out to create a large area of public realm on the social sciences campus, with provision for sustainable drainage systems including extensive use of tree pits and rain gardens. As part of the SuDS design specifications, a Blue Roof stormwater drainage system was considered as an alternative option to underground attenuation tanks to keep surface water run-off within the discharge consent.ABG were able to demonstrate that specifying a shallow Blue Roof attenuation layer involved much lower carbon emissions than excavating underground storage tanks.The volume of vehicle movements required to install underground stormwater attenuation compared to the ABG blueroof system was calculated (delivered from ABG’s factory based 25 miles away), and a carbon footprint saving of 59% was estimated. The reduction in construction emissions was deemed particularly important given the site’s proximity to the Royal Hallamshire Hospital.The 108mm ABG blueroof system design was fitted over a 4,500m2 roof catchment area by the ABG Installs team over a period of 8 weeks. The inverted roof system build-up includes a 245mm XPS insulation installed onto the waterproofing with a Water Flow Reducing Layer (WFRL) above. The ABG Deckdrain 4mm geocomposite drainage layer is installed above a 100mm void former, wrapped in a Terrex NW20 geotextile layer to prevent debris entering the drainage voids. The roof build-up is completed with a surface finish combination of stone ballast and 63mm pavers.For the majority of the year, the roof drains into the rainwater outlets as normal, however during prolonged spells of heavy rainfall the void formers begin to temporarily attenuate the stormwater. During storm periods the rainfall outflow rate is slowed using 13 stainless steel restrictor chambers, positioned above each rainwater outlet.This controls the volume of water that is able to discharge from the roof during the storm, minimising surface water run-off and reducing the risk of flooding in the local area. The system is calculated to only reach maximum attenuation volume during a 1-in-100 year storm event, as calculated using the Flood Estimation Handbook rainfall data for Sheffield, plus 40% allowance for climatic change. The system features an integrated overflow outlet in the event a storm occurs that exceeds this designed capacity.
Sponsored
SMET LiteFlo® | B. Doherty Screeding | Self Build West Donegal | 280 Alpha Hemihydrate

SMET LiteFlo® | B. Doherty Screeding | Self Build West Donegal | 280 Alpha Hemihydrate

SMET Building Products Ltd

SMET Supported Partner, Brendan Doherty Screeding Services supplied Südanit 280 Alpha Hemihydrate Screed and SMET LiteFlo® Lightweight Flowing Screed for the floor solution in this self-build in picturesque West Donegal.The ground floor was prepared with 280 Alpha Hemihydrate Screed at 50mm with UFH, maximising the clients’ insulation. The first floor was completed at 50 mm SMET LiteFlo® Lightweight Flowing Screed poured on UFH on timber joists.The 280 Alpha Hemihydrate Screed self-levelling liquid screed is remarkably quick to walk-on – applied at 500m² per day and walkable within 6 hours thus ensuring the follow-on trades were not delayed. it’s particularly suitable for use with UFH, fully encapsulating pipes and services, providing excellent heat transfer – and with thinner floors and more insulation – this increases the performance of underfloor heating.SMET LiteFlo® Lightweight Flowing Screed used on the first floor of the timber frame house is ideal where loading is an issue. SMET LiteFlo® Lightweight Flowing Screed is a high-quality, innovative, pumpable factory-produced, CE marked, self-levelling screed based on calcium sulphate.German-made LiteFlo® is unique, in that it’s the first pumpable lightweight flowing screed. Made from specially selected aggregates, makes it 30% lighter than conventional flowing screeds and therefore 70% lighter than traditional sand & cement – ultimately this means less is required per m2. LiteFlo® complies with EN 13813: 2002, is CE-marked, and is available in 27Kg bags or bulk silos.TDS SMET LiteFlo® Lightweight Flowing ScreedAftercare SMET LiteFlo® Lightweight Flowing ScreedSMET Floor Screeds and Compounds Product SelectorHave a look at the Northern Builder MagazineTop 5 Liquid Screeds Article.  Read about SMET LiteFlo® in the Irish Construction News.SMET delivers another innovative, showcase flooring solution to their Smet Supported Partners.
Sponsored
White Rhino House Heating - Whipsnade Zoo

White Rhino House Heating - Whipsnade Zoo

Powrmatic Ltd

Zoo Animal Enclosure Heating SolutionIn partnership with HEVAC Services Ltd of Kings Langley, Powrmatic was approached to develop a heating solution for the White Rhino’s House at Whipsnade Zoo, which saw the installation of an overhead gas-fired (LPG) continuous radiant heating system, as the previous electric heating system inside their indoor habitat was not efficient enough and heat was escaping through the timber structureProject BackgroundThe White Rhino house at Whipsnade Zoo is the home to a herd (also known as a “crash”) of seven southern white rhinos, Sizzle being the only male – the six females are; Mikumi, Bertha, Tuli, Jaseera, Fahari, and Nandi. Sizzle and Tuli are the parents of the latest baby rhino Nandi born in August 2021.The heating inside their indoor habitat at Whipsnade was not efficient enough. Localised electric heaters were spread around the large space to create coverage, but the heat was escaping through the timber structure. It was decided to upgrade the structure by foam insulation to the internals of the asbestos roof and to provide a new continuous gas-fired overhead radiant heating system providing blanket heat coverage to the complete floor area of the house.  Project SolutionHEVAC Services Ltd of Kings Langley, Hertfordshire, who undertake servicing of HVAC equipment at Whipsnade Zoo on behalf of Pareto FM for the end client ZSL (Zoological Society of London), approached Powrmatic to develop a heating solution for the rhino’s house. The brief was to provide an overhead gas-fired (LPG) radiant heating system to blanket cover the complete floor area of the rhino house, but also design it so that it could be zone controlled, should one of the herd have a need to be in an area of a higher or lower temperature.The LPG propane tanks for the heating system needed to be sunk into the earth at the edge of the rhino house to avoid having to remove any trees, thus maintaining the conservation ethos of ZSL. For a structure such as the rhino house, being the size of a large sports hall, a Powrmatic SRP-PCV+ continuous gas-fired radiant tube system comprising; 4 x 73kW burners was the proposed solution, arranged in 4 temperature zones, with the new MC400/C controller and just the one flue discharge to atmosphere.Project ResultThe installation of the new PCV+ continuous overhead radiant heating system was skilfully undertaken by HEVAC Services Ltd, with the contract programme being driven by the daily habits of the rhino herd! Whether they wanted to be in their house or out on the field. Thus, the logistics of undertaking the heating installation were unique compared to working in a standard commercial/industrial environment.The White Rhinos now have a refurbished home and a heating system that delivers radiant heat in exactly the same way that we (and the rhinos) receive energy in the form of heat from the sun. Radiant heating systems efficiently radiate infrared radiation, which is the transfer of energy in waveform from a hot surface to a relatively cooler surface without heating the medium between. Thus, the rhinos can bask under the radiant heat, whether indoors or outside under the sun.The ZSL Whipsnade Zoo White Rhino Enclosure now benefits from a highly energy-efficient Powrmatic SRP-PCV+ system, listed on the Carbon Trust Energy Technology List (ETL), endorsing the Seasonal Space Heating Energy Efficiency of; 92.1%, and thus delivering low; energy usage, fuel bills and carbon emissions minimising their impact on the environment.
Sponsored
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Polyroof Products Ltd

As described by Eastleigh Borough Council, the £25 million facility underpins the council’s commitment to promoting a healthy borough. It incorporates a high quality design in keeping with the parkland environment and has high environmental standards. The new building will boast many facilities that are larger than at present, including an eight-lane, 25-metre swimming pool, a larger, versatile learner pool, 15-badminton court sports hall, a versatile, multi-station gym and a group spinning studio. This case study will look at the challenges and solutions of this vast project that involved insulating and waterproofing over 8,500m2 of flat roof areas.Following decades of experience using Polyroof’s liquid systems to protect buildings throughout the district, including waterproofing the original Fleming Park Leisure Centre back in the early 1990’s, Eastleigh Council specified the Protec system for the project.
Sponsored
92 Construction

92 Construction

Aeromix Flowing Insulation

PROJECT NAME: NORTHENDEN CUSTOMER 92 CONSTRUCTION LTD PRODUCT SUPPLIED AEROMIX SUPPLIED BY WOTMIX MANCHESTER INSTALLER CONCEPT CONSTRUCTION RIBBLE VALLEY LTD AEROMIX was chosen for this renovation project thanks to its many benefits allowing all UFH to be more cost effective and energy efficient, smoothness of finish and speed of install. Significant savings were had on this project by using AEROMIX. The customer 92 Construction Ltd complimented better U-values, a much cleaner process, no excess waste and allowed the project to complete the whole process within 1 week thus saving time and money 92 CONSTRUCTION LTD said “great progress recently over at Northenden project, with the internal sub flooring now complete, we up’d our game with this one and went for the new innovative AEROMIX liquid insulation base ground bearing slab 
Sponsored
Westminster Bridge Road

Westminster Bridge Road

OptiTec Ltd

We have recently completed a 600m2 project in Westminster with installation by one of our main Approved Contractors, Ridgewell Flat Roofing.Specification – System UsedThis project called for extremely durable yet cost-effective waterproofing to be installed, which made the OptiTorch-Premium Bituminous Felt System the ideal choice. Having been used in the roofing industry for over 50 years, felt has been consistently developed and improved, and still remains one of the most popular systems available.OptiTorch-Premium bituminous felt is a high-performance waterproofing system that can be installed year-round, with excellent flexibility at temperatures as low as -25oC. This system provides long lasting resistance against UV rays and even contains special additives to protect against root growth.There was also a lot of detailing work and some gutter repairs required, so OptiFlex-Rapid PMMA Liquid was used for these parts of the project to ensure a completely watertight and visually appealing result.OptiFlex-Rapid is a quick-curing PMMA liquid waterproofing system with a typical curing time of just 20 minutes! It is cold-applied and is reinforced with 150gsm matting for extra resilience. OptiFlex-Rapid can be applied year-round and is a great choice for detailing and repair work as it can be applied directly onto most surfaces without the need for primer, which can often save time and money!The ProjectThis project was a 600m2 warm roof design with a standard build-up including 120mm tissue-faced PIR insulation, and also consisting of: OSA5 Primer, Vapour Control Layer, Insulation Adhesive, Insulation, Premium Self-Adhesive Underlay and Techno58 SBS Capsheet.Ben Ridgewell, owner of Ridgewell Flat Roofing, took on the project with Grant Jones (Co-Director) and his team, and completed the installation to their consistently high standards with an impeccable finish.The ResultsThe overall completed look of this project is very tidy and aesthetically pleasing – thanks to Ben and his team for a great installation, including an OptiTec warranty of 20 years to ensure peace of mind for the building owner for years to come.
Sponsored
REPerformance, Swindon, Wiltshire

REPerformance, Swindon, Wiltshire

Vebro Polymers

Client: REPerformanceLocation: Swindon, WiltshireSector: Automotive / IndustrialYear: 2021Project Size: 400 m²System: vebrores EP HBC (2 coats of vebro EP Universal)Requiring a protective resin flooring surface that could withstand grease, oil, fuel and heavy loads, as well as a high-gloss finish that could be quickly and easily cleaned, the specialist applicator installed two coats of vebro EP Universal in Graphite Grey to the main workshop, with Black under lifts and Red demarcation. Based on epoxy resin, vebro EP Universal solvent-free high-build coating is seamless and impervious, this means any dirt or spillage can be easily cleaned, wiped or mopped away without seeping into and damaging the protective coating.vebro EP Universal is available in a wide range of colours to incorporate line-marking, chevrons and cross-hatching into the floor design.For areas requiring a slip-resistant profile, graded quartz sands can be incorporated into the build-up between coats to provide additional texture, this is particularly important in areas prone to becoming wet such as valeting stations!REPerformance is over the moon with the final finish!
Sponsored
Durham University Gateway

Durham University Gateway

Polyroof Products Ltd

The Durham Gateway project is a major new development at the Durham University that houses a variety of departments. Although aesthetically stunning, the concept presented several challenging issues.The project was carried out to a BREEAM ‘Excellent’ Standard and as such only used components that had minimal environmental impact. Cold-applied liquid roofing membranes, such as those manufactured by Polyroof, have been recognised by BRE to help roofing elements achieve up to an A+ rating (depending on the roof construction).Part of the works involved the construction of three curved roof areas that required a high-performance and durable waterproofing system which was to be covered by a timber shingle system. The shingles were supported by over 1,170 steel stanchions – all of which were seamlessly waterproofed with the Protec System.The main contractors of the project, Laing O’Rourke, were able to achieve the visual impact they wanted with the peace of mind that the roof was protected by a totally seamless and highly durable waterproofing membrane.
Sponsored
Heavy Duty Drainage for Merry Hill Shopping Centre

Heavy Duty Drainage for Merry Hill Shopping Centre

ASPEN by Canal Engineering Limited

The Merry Hill Shopping Centre in Brierley Hill recently underwent an expansion and overhaul of its entrance area. Aspen were approached to design, manufacture and install bespoke drainage for the newly renovated entrance area to the shopping centre.Aspen worked closely with the client to manufacture and install stainless steel solutions to support the performance of the outdoor environment. There was great importance placed on the rainwater calculations and anti-slip resistance to ensure the channels and covers were fit for purpose in an outdoor setting. Aspen provided engineering drawings, samples and prototypes to ensure a seamless manufacturing process and delivery of the project from day one.Aspen Stainless  HD Heel Guard Drain Cover and Drain Channels were specifically designed to support the flow of rainwater within the entrance area. The standard central bottom Meribel Outlet was installed to efficiently dispose of non-liquid waste built up within the outlet. The trap featured fully removable trash baskets to allow for the efficient disposal of non-liquid waste, built up within the outlet.The HD Heel Guard Cover was specifically tested using the pendulum anti-slip test. The pendulum assesses the friction offered by the floor when a foot comes into contact with the surface. The cover was tested to ensure that the surface presents a safe level of grip in end use. The pendulum anti-slip has proven to deliver the most accurate results and is therefore the key adopted method for assessing floor slipperiness in all conditions. The pendulum CoF test is the subject is a British Standard, BS 7976: Parts 1-3 using an imitation heel (rubber soling sample) sweeping over the drain cover. The slipperiness of the flooring has a direct impact on the value provided and is therefore the adopted method for assessing floor slipperiness in all conditions.The dedicated project manager worked closely with the contractor during the installation process to ensure highest standards for drainage and protection were achieved. The design, manufacture and installation process was specifically scoped out to meet with all the necessary building regulations in line with the latest HSE and UKSRG guidelines.If you wish to find out more about Aspen Stainless solutions please email: aspen@canalengineering.co.uk or speak to one of our technical sales team via our online chat portal.
Sponsored
Performance Drainage For Britvic Recycling Facility

Performance Drainage For Britvic Recycling Facility

ASPEN by Canal Engineering Limited

The global drinks manufacturer Britvic have recently completed the expansion of its manufacturing site in Rugby. This particular investment involved installing a fourth canning line, growing the site capacity by 18%.This new, state of the art canning line was designed to boost Britvic’s Rugby facility, which continues to produce recyclable cans for popular drinks brands such as Tango & Pepsi. The additional capacity will also be used as a platform to drive further innovation and expansion within the business.Aspen Stainless Davos Plus drain channels with ladder covers were installed to cope with the high level of waste demand on site. The channel profile was carefully designed to provide an easy to clean surface with a self-draining slope feature. The strictest level of hygiene standards are required within food manufacturing facilities due to the build-up of bacteria and possible cross contamination of liquids. The new drainage channels were designed to match the existing flow and volume capacity of their existing drains and included bespoke outlets, tied into the building’s underground drainage systems.Banff outlets were also installed with a hinged trap, the removable trash baskets were designed to efficiently dispose of the non-liquid waste, which has built up within the outlet. It’s essential the drainage is perfectly aligned to ensure a seamless connection across the entire site to boost performance standards.The drainage channels are designed in compliance with EHEDG (European Hygienic Engineering & Design Group) to support safe hygienic engineering in food manufacture. The EHEDG states ‘product contact surfaces must be easy to clean, non-absorbent and not present a toxicological hazard by leaching of substances and foodstuffs’ the cleanability of the drainage is also an important hygiene requirement as stated in the EHEDG ‘Improperly or insufficiently cleaned equipment cannot be effectively disinfected’The perfectly fitted drainage system boosted the overall hygienic performance of the new drinks recycling facility. This included employee health & safety, operational costs as well as consumer safety. The dedicated project managers worked closely with the contractor during the entire installation process to ensure the highest standards for drainage and protection were achieved.If you have any questions regarding our drainage solutions, please email aspen@canalengineering.co.uk or visit our website and speak to one of our technical advisors for more information.
Sponsored
Creamery production facility uses FasTop

Creamery production facility uses FasTop

Sherwin-Williams

Wensleydale Cheese has been made in Wensleydale, Yorkshire since 1150 when monks settles and lived at monestary at Forsnear Hawes. Today cheese is till handcrafted with the original recipe at the two Wensleydale Creamery sites using milk from local cows.Wensleydale Creamery required floor finishes throughout production floors which would be hygienic and very durable to provide a long term solution. Excellent chemical resistance was required against regular spillages from dairy produce such as whey.Dairy production procedures mean that floors are subjected to heavy duty use and impact from fork lift trucks and storage equipment.SystemThe system chose was FasTop TG69 polyurethane floor screed which has been applied throughout the two creamery sites. The system provides a completely seamless finish which is ant-slip even in wet conditions and which can be cleaned to the exacting conditions required in a modern food factory.Coved skirting has been formed around perimeters of all production and storage areas to create a 'tanked' finish which can be cleaned with hot water processes such as steam cleaning. The product has been tested and certified by Campden BRI as a non-taint product and is certified by HACCP as a food grade material.
Sponsored
Beckfoot Allerton Primary School

Beckfoot Allerton Primary School

Polyroof Products Ltd

Beckfoot Allerton opened on 19th November 1894, a proud day for the village of Allerton and its people. The school underwent many changes throughout the years surviving and contributing to both war efforts, while continuing to hold their high standards of education. In 1928 the school official became a primary school and later in 1960 a junior and infants’ school further undergoing changes. After a local authority change in 2000 Beckfoot Allerton Primary school was reborn. In the present day the school is much different to when it was opened generations ago and continues to serve as a corner stone of the village and its community.Taking into consideration all of the requirements of the roof, a bespoke specification was prepared to refurbish the roof. Polyroof’s Protec System, a hybrid polymer liquid system with extremely fast curing and installation times, was the chosen system of use for the project. Due to its fully cold-applied application the works could be carried out during the Primary Schools term times, without having to wait for closure periods between terms.
Sponsored
Binary large objects an architectural design with single ply finishing

Binary large objects an architectural design with single ply finishing

RENOLIT Cramlington Ltd

To create a Blob... CHALLENGE For the design of a Texaco service station on the highway near Antwerp the architect decided he wanted to create a Blob (Binary large objects) architectural design. The service station consists of three functional lobes that together look like an oil stain. The actual gas stations are covered with 4 lobe-shaped canopies. To accentuate this futuristic design the architect wanted to create liquid formed shapes in a metallic look. As the walls of the main building were planned using a polurea metallic finishing coating the architect sought a suitable compatible material to finish the rest of his Blob roof surfaces. SOLUTION Synthetic roofing membranes are the most flexible materials on the market and are suited to waterproof almost all possible roof shapes. For this particular project the silver coloured RENOLIT ALKORPLAN membrane was the best solution. This silver membrane is produced with a protective coating creating a roofing membrane that is easy to clean. The RENOLIT ALKORPLAN Metallic membranes combine excellent durability with added aesthetical appearance.
Sponsored
GEORGE REDGRAVE DBCP

GEORGE REDGRAVE DBCP

Aeromix Flowing Insulation

ASE STUDY PROJECT NAME: DERBYSHIRE HOUSE RENOVATION PRODUCT SUPPLIED AEROMIX SUPPLIED AND INSTALLED BY: CLOCKWORK SCREED INITIAL BRIEF: Garage to a one bed bungalow conversion. Aeromix was chosen for this project thanks to its many benefits of offering warmth, smoothness of finish and speed of install. The floor needed to be strong and warm so by using Aeromix with its thermal properties the finish was amazing. 175mm Aeromix was poured directly over compacted hard core topped with 65mm C20 liquid screed . The builder who completed this project AA BUILDERS DERBY said “The product is amazing and the finish is amazing, I would recommend it to anybody and everybody” Building control, GEORGE REDGRAVE DBCP He was very impressed with the flooring and commented “what a nice finish. , this is the way forward” Aeromix provided the ideal solution for the insulation on this project, compared to the normal concrete floor and other traditional methods, the speed of pumping the insulation coupled with the high thermal properties has contributed in saving the customer both time and money. 
Sponsored
SelfBuild Contract Floors

SelfBuild Contract Floors

Aeromix Flowing Insulation

ROJECT NAME: RENOVATION PRODUCT SUPPLIED SUPPLIED: INSTALLER SELFBUILD CONTRACT FLOORS AEROMIX was chosen for this renovation project thanks to its many benefits of offering warmth, smoothness of finish and speed of install. This project came with a challenging access issue meaning a long pump distance and lots of services in the floor AEROMIX was the perfect solution. This was the perfect product, providing an ideal solution for the insulation for this project. Reducing CO2 due to reduced carbon emissions within the product. The installer who completed this project SELFBUILD CONTRACT FLOORS said AEROMIX was poured as insulated ground baring slab, installed at 250mm deep achieving the required 0.11 u-value, this allowed the customer to clip the UFH pipes directly to it before being topped with a 65mm C20 liquid screed AEROMIX provided the ideal solution for the insulation on this project, compared to the normal concrete floor and other traditional methods, the speed of pumping the insulation coupled with the high thermal properties has contributed in saving the customer both time and money. 
Sponsored
Ellis Guilford School

Ellis Guilford School

KWC DVS Limited

Ellis Guilford has over 1,300 hard-working and enthusiastic students studying under their roof. The school promotes a supportive and engaging environment where pupils can express their individuality, ambition, and drive. The school was looking for a washroom revamp that would keep with the school’s core values. Inspired Washrooms, a Nottingham-based fit-out company, designed a set of vibrant, contemporary, and practical washrooms with a range of specified KWC DVS products. The full range of products provided are as follows: • 4 x SOLX2400 Washtroughs with four wash places • 8 x DRYX600 Hands-in dryer Our Miranit range is durable and stylish. Our High Speed “Hands-in” hand dryer is suitable for wall mounting and made of an antibacterial ABS plastic, ideal for educational environments where a pupil’s hygiene and safety are paramount. Silver in colour, the dryer is modern in design, with an impressive drying time of 7-10 seconds, which is beneficial in areas of frequent use. The product is easy to clean and maintain thanks to an auto shutdown after 25 seconds feature and a separate water tank. Chris Kightley, Managing Director of Inspired Washrooms, commented, “We work with KWC DVS on a recurrent basis and can always count on them to provide us with quality products. A trusted partner, we’ve worked on many projects together. Their Miranit composite range and their Hands-in dryer were perfect for the colourful and functional washroom refurbishment the school was after.”
Sponsored
Commercial to Residential Basement Conversion

Commercial to Residential Basement Conversion

Delta Membrane Systems Ltd

Commercial to residential, it may be last orders for some of our great British pubs, for other’s its discovering exciting ways of transforming commercial structures into luxury residential dwellings.  The growing trend of converting old inns offers new homes a unique history whilst being packed with character and features.Delta Registered Installers, Advance Property Preservation Ltd were engaged to assist on a troublesome vaulted basement to a property, based in central London which had already been converted into high living accommodation.Just off the basement area were two large vaults around 12m long. Made from brick barrel construction, this below ground space had previously used for storing kegs of ale!One of these vaults had previously been converted into a spa area with jacuzzi and steam room, the other was used as a storage area. The owners had previously had the storeroom tanked with a Type A, render system, however this approach repeatedly failed, allowing for substantial water ingress which was causing damage to items stored in this area.With Structural Waterproofing one of the major contributors to project failure lies with the design. When hiring contractors, ensure the design, procurement of materials and installation is undertaken by one specialist will naturally reduce these known and associated risks. A specialist contractor will always be able to offer quality assurances.
Sponsored
USING VOLCANIC PUMICE BUILDING BLOCKS TO BUILD A CHIMNEY DURING A SELF-BUILD PROJECT.

USING VOLCANIC PUMICE BUILDING BLOCKS TO BUILD A CHIMNEY DURING A SELF-BUILD PROJECT.

Schiedel Chimney Systems

Avoiding gas reliance when building a new house.Traditional self-build projects have always had heating systems such as gas central heating and solar panels installed. However, with the increasing costs of gas, and the uncertainty of future supplies, a secondary heating source is required.There are options such as ground heating pumps, etc. but a real heating system independent of the grid, plus a stunning focal point has to be a wood burning stove.In fact, wood logs are now the cheapest domestic heating fuel. According to the Stove Industry Alliance, wood now is “costing households 74% less per kWh than electric heating and 21% less than gas heating”. The benefits don’t end there. “Using a modern wood burning stove also costs 29% less to run than an air source heat pump. Wood logs are 87% less carbon intensive than gas, 88% less than electricity and 74% less than an air source heat pump.”Building a traditional steel pipe flue system is always an option, but steel systems are more suitable in retrofit projects where minimum disruption is required. When you are building a house from the ground up, then a more permanent and ultimately lifetime option is the better one.
Sponsored
Dublin City University Polaris Building | baseTherm® Poured Insulation and B Doherty Mobile Screed Factory Jan 24

Dublin City University Polaris Building | baseTherm® Poured Insulation and B Doherty Mobile Screed Factory Jan 24

SMET Building Products Ltd

A fine cooperation from our clients - the floor screed specialists at B Doherty Screeding Ltd | Mobile Screed Factory along with baseTherm® Ltd Liquid Floor InsulationProjectDCU Polaris Building | School of Health & Human PerformanceMain ContractorWalls & McKeown Joint Venture Floor Screed PackageB. Doherty Screeding & baseTherm® Joint VentureVoid Former500 m³ baseTherm® 200, supplied and installed by baseTherm®Floor Screed3,500 m² Rapidur® EB5 Floor Screed by ourselves B. Doherty Screeding LtdContact your professional baseTherm® team for efficient, fuss-free, floor insulation results: 🔥📞Philip +353 (0) 87 333 0683📞Eddie +353 (0) 87 223 2456📩 sales@basetherm.comFor stunning floor screed results give B Doherty Floor Screed a call:📞 +353 (0)74 9383654📱 +353 (0)86 6031230📧 info@bdohertyscreeding.com
Sponsored
Coloured, frost resisting concrete for lido restoration

Coloured, frost resisting concrete for lido restoration

Tarmac

Funding was secured to renovate a Grade II listed lido in Pontypridd. The lido, which had remained derelict since 1991, was given a new lease of life after the local authority clinched the funding required to restore it back to its former glory. As part of the scheme, the existing derelict buildings would be renovated and the Lido bathing area remodeled into three heated pools. The restoration included external covered showers, heated changing facilities and a learning and historical interpretation centre. The client needed a coloured product that was highly durable, easy to place and maintain, available in a range of colours and, most important of all, capable of retaining its colour and beauty. TOPTINT coloured was recommended as the ideal solution. TOPTINT contains an integral colour pigment which is UV stable meaning that the colour will not degrade from natural sunlight. Also, because a liquid pigment is used the colour is evenly mixed throughout the concrete. As this pigment is integral to the mix it is a long lasting and frost-resistant solution, requiring little on-going maintenance and therefore making it a more sustainable long term solution.
Sponsored
Metal Roof Coating - Merlin Grey

Metal Roof Coating - Merlin Grey

Liquasil Ltd

This metal roof in Warwick was suffering from cut-edge corrosion, delamination of the factory finish, and spot corrosion.The specification called for a full liquid roof coating in Merlin Grey, which Liquasil was able to supply for installation by Nadco Roofing Services. Liquasil's Metalseal can be made in any RAL or British Standard colour to suit the client's needs.After the corroded surfaces had been prepared back to bare metal and the substrate had been jet-washed and dried, a single coat of Metalseal was applied to the entire roof at a wet film thickness of 350 microns.Despite the steep pitch of the roof, runoff was not an issue; the product stuck to the roof and did not drip, leaving a consistent, glossy finish that left the whole roof looking like new.Metalseal can be made in more than just the standard goosewing grey - if you have an industrial roof that needs coating, Liquasil can meet your needs - no matter the colour.Give us a call on 0121 709 5352, or email us at info@liquasil.com.
Sponsored
Halo Project, Kilmarnock,

Halo Project, Kilmarnock,

AG

HALO is an imaginative, innovative and inspirational regeneration initiative to revitalise Urban Cities and Towns of the UK.A first for Scotland is HALO Kilmarnock at the heart of Kilmarnock town center. The HALO project will support the growth and resilience of the Ayrshire economy. HALO will create a dynamic commercial, educational, cultural, leisure and lifestyle quarter of the town, fueled by renewable energy, where people can live, work, learn and play.This multi-faceted regeneration of a 28-acre site, was supplied over £80,000 worth of AG Plaza Paving, TerraKerb® and TerraPave® Step Units to complement the stunning architectural work of the modern building and surrounding areas.David McCandlish Regional Sales Manager at AG stated: ‘This was a major win for AG. We supplied a range of hard landscaping products around the new project. Our Plaza premium granite paving, TerraKerb and TerraPave step units provided the perfect combination of durable paving and modern sleek design for this stunning project.’The focal point of HALO will be an Enterprise and Innovation Hub being created to stimulate digital learning, inspire innovative thinking and provide a conducive environment for spin-out, new-start, scale-ups, digital, manufacturing and cyber businesses.The completed HALO will feature a new Urban Park, surrounded by entrepreneurial businesses in computer technology, cyber research, engineering, fashion, financial services and light manufacturing.
Sponsored
Co-operative, Avonmouth

Co-operative, Avonmouth

Berry Systems

Berry Systems supplied and installed Internal and external safety barriers to protect doorways, walkways, columns, racking, site and equipment at the Co-operative, Avonmouth project.The 435,780 square foot (40,485 sq m) state-of-the-art facility is conveniently located near to Junction 18 of the M5 and ideally placed to distribute goods to 482 Co-Operative stores in the Bristol, North Somerset and South Wales area. Our safety barriers have been installed extensively both inside and outside the distribution centre. The access roads are lined with Barrier Rails mounted on semi-flexible Flexi-Posts. In the vehicle waiting areas power cables have been integrated into the barrier with post extensions mounted to every other post, for the power outlets. The Flexi-Posts give greater protection if a reversing vehicle fails to stop in time, avoiding damage to the barrier, power cables and HGVs. We also installed a number of exterior bollards to protect doorways and other access points and additional barriers to protect fuel storage and other plant. Inside the distribution centre, structural columns benefit from our column protection units that flex upon impact to minimise damage. Other areas have our unique double rail system mounted on spring steel buffers to create an impenetrable but flexible  barrier from ground level to a height of 610mm.
Sponsored
Basildon & Thurrock University Hospital

Basildon & Thurrock University Hospital

Bauder Ltd

Basildon & Thurrock University HospitalBauder Total Roof System (BTRS) and LiquiTEC cold applied waterproofing systemSynopsisBasildon and Thurrock University Hospital’s existing roof was failing in multiple areas, and 80 rooflights needed replacing. The client wanted the refurbishment to make as little impact as possible on the departments directly below which included drug refrigeration, x-ray and ultrasound clinics, patient wards and operating theatres.Bauder Building BoardProject:Basildon & Thurrock University HospitalLocation:EssexProject Type:RefurbishmentRoof Area:900m²Specifier:NHSApproved Contractor:Breyer ConstructionProject challengesThe plant on the rooftop could not be turned off or raised and many of the AC units and boilers had to be left running due to the nature of the rooms below. Certain areas had to be repaired before others and detailing under and around the plant that could not be raised was almost an impossible task. When working around the plant, COSHH regulations had to be considered and adhered to.The result Coordinating with both the client and approved contractors was key in this project, and by using cold liquid applied waterproofing the contractors could ensure a watertight seal with quick application, allowing them to complete the remainder of the roof using reinforced bitumen membrane, and meet the tight project deadline of 12 weeks.System installedBauder Total Roof System (BTRS)Suitable for a variety of applications on both new build and refurbishment projects and can be used in warm, cold and inverted roof scenarios.1 Bauder K5KA top quality, heavy duty, torch-applied SBS elastomeric bitumen capping sheet. The product features a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUO 35A 3mm thick technically advanced self-adhesive elastomeric bitumen underlayer with DUO lap technology and glass lattice reinforcement.3 BauderPIR FA G16 Tapered (laid to falls)Tapered insulation is a lightweight, convenient, easy to install and cost-effective alternative method of providing falls to a roof instead of incorporating them into the structure.4 BauderTEC KSD FBSA technically advanced, self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finished upper surface to allow easy bonding of insulation using the specified Bauder insulation adhesive.LiquiTEC Roof SystemThe Bauder LiquiTEC roof systems combine ease of application, fast cure and durability to provide a cold applied liquid waterproofing product second to none.1 LiquiDEK with reinforcement layerA cold applied liquid fast curing waterproofing resin, for use on the main roof area of the LiquiTEC Roof System. It is applied in 2 coats ‘wet-on-wet’, with a layer of Bauder 110g reinforcement fleece between them. The product is a PMMA based resin and requires the addition of catalyst to trigger curing. It is solvent, isocyanate and halogen free, minimizing its environmental impact.2 BauderTEC KSD DUOCarrier membrane & Vapour Barrier is a technically advanced self-adhesive elastomeric bitumen vapour barrier with patented “DUO” lap technology. The product features an aluminium foil facing for vapour impermeability.AdvocacyBreyer Roofing’s Contracts Manager for the project, Kerry Cutts:“The main challenge was working around the hospital’s requirements. For example, we provided a weekly plan for the areas we were working in and the rooflights / plant affected. Where possible, we worked out of hours while doing rooflight replacements to minimise any issues. We also worked closely with Bauder to vary the specification when we had to work around live plant. The communication between Bauder and Breyer Roofing was exemplary throughout and I was pleased this completed project was nominated for a national award."
Sponsored
SOLUTIONS | Cairns Regional Council Vertical Expansion Stormflow Joints Replacement Project

SOLUTIONS | Cairns Regional Council Vertical Expansion Stormflow Joints Replacement Project

Five Star Products

Date of Project: September 2017Project Owner: Cairns Regional CouncilProject Contractor: Waterstop Solutions Pty, LtdProject Engineer: Cairns Regional Council Market/Environment WastewaterSubstrate: ConcreteSize of Project: 12 x 2m joint replacementTHE CHALLENGEThe joints on a municipal wastewater treatment tank had degenerated to the point where repairing and resealing were necessary. Cairns Regional Council required a product with a fast cure time and rapid compressive strength gains.Five Star® SolutionFive Star Structural Concrete® V/O was selected due to its rapid set and high early strength gains; it reaches 2,500 psi (17.2 MPa) within three hours. This rapid strength gain allowed for the repaired joints to be resealed with minimum turnaround time in preparation for the installation of a joint sealant system.ABOUT FIVE STAR STRUCTURAL CONCRETE® V/OThis is a high-strength, rapid-setting, one-component, permanent concrete repair material for vertical and overhead structural repairs.It produces a repair that is dimensionally stable, develops an integral bond to existing concrete, and restores structural integrity within hours of placement.Provides increased corrosion protection to steel-reinforced structures with migrating corrosion inhibitor technology and very low chloride ion permeability. Moisture-sensitive coatings can be applied in 8 to 24 hours.Can be troweled vertically or overheadOne product for thin and thick placementExcellent freeze/thaw resistanceOutstanding corrosion resistance for protection and rehabilitation
Sponsored
JACKOBOARD® Knutsford Swimming Pool Project

JACKOBOARD® Knutsford Swimming Pool Project

BEWI UK (JACKOBOARD®)

This amazing swimming pool refurbishment project in Knutsford, Cheshire was undertaken by Abstract Pools Ltd. Tiles from Designworks and more than 100 JACKOBOARD® construction boards were used.Manufactured with an extruded polystyrene (XPS) foam core and a special coating on both sides, JACKOBOARD® construction boards form an ideal base for tiling. The surfaces of the JACKOBOARD® system provide an extremely strong bond and can be used on virtually any substrate. The boards are waterproof, thermally insulating, truly lightweight and very strong. This combination of characteristics makes them ideal for pool hall work. The result of this refurbishment is absolutely stunning and the owners of the property are delighted unsurprisingly.The owner was abroad while the renovation was carried out. The pool was situated in the basement of the house and had been left empty for a few years. The contractor was tasked with refurbishing the pool hall and bringing it back to life. They stripped everything back to the existing substrate, and then rendered and screeded the pool itself, the jacuzzi and the pool surrounds.A new steam room was added, using JACKOBOARD®. All of the pool hall walls were lined with JACKOBOARD®, ready to receive tiles. All tiles on this project were supplied by Designworks Tiles, the specialists in tiles and mosaics for swimming pools and spas. The tiles used on the project were Ezarri Lisa Black Mosaic for the pool tank, District Grey 1200x600x10mm for the pool hall walls, District Dark Grey for the pool coping tiles and District silver 600x600x10mm for the pool floor surround
Sponsored
Colchester County High School

Colchester County High School

Langley Waterproofing Systems Ltd

The purpose: Water penetration into classrooms alerted theOfsted “outstanding” rated Colchester County HighSchool for Girls in Essex to a problem with its roofs.Its premises advisors, Archer Building Consultancy,turned to Langley to offer technical support for themost efficient best-value rectification, with fundingprovided by the school’s governing body, The AlphaTrust.Our solution: We carried out an in-depth roof condition report which highlightedthat the four flat asphalt and 10° pitched copper standing seamroofs urgently need repair.We advised the most efficient solution and use of resources wasto strip the copper roof back to the plywood deck and form a newwaterproof layer from our TA-30 Flat Roofing System and theasphalt roofs overlaid with TA-30 and our Liquid Roofing System.By leaving the original roof, we were able to minimise disruption.In the process, we assessed the roofs for their suitability forphotovoltaic (PV) installation, then helped address energy costs:one over a three-storey building was deemed appropriate. Finally,in partnership with Archers, we supported the detail required toapply for Salix funding to cover the supply and installation of thePV array.

Showing 145-180 of 237

Feedback