NBS Source
I'm a manufacturer

"flooring joint fillers and sealants"

4,939 results found

Sort by:

Showing 721-756 of 867

Sponsored
Horgan's Quay, Ireland - Pyroguard Infinity

Horgan's Quay, Ireland - Pyroguard Infinity

Pyroguard UK Ltd

The ChallengeNo. 1 Horgan’s Quay is one of the development’s three office buildings, with the upper floors of the new modern structure cantilevered over the site’s original Goods Shed. The lobby area features a large glazed partition on the first floor, helping to create an open, light space, as well as sympathetically blending the old restored structure with the new.KCC Group, a door and glazing contractor, were appointed to deliver the EI30 SWS Screen works on the project. Site Contracts Manager, Ger McNamee, said: “In order to ensure the safety of those within the building, 30-minute fire protection was required for the reception area, providing a fire barrier between the lobby and the first floor. Once we had the fire safety glass specification from the architect, O’Mahony Pike Architects, it was up to our team at KCC Group to source a supplier – this is when our relationship with Pyroguard began.”The SolutionTo ensure that the desired aesthetic was achieved, while also meeting building safety regulations, Pyroguard Infinity T-EI30/24-2 SWS fire safety glass was chosen by KCC Group and installed in the glazed partition, within a Jansen steel profile system.Pyroguard Infinity is a range of fire safety glass certified for butt-joint applications. With no vertical frame profiles required, it’s the ideal solution for providing visually appealing seamless partitions. Manufactured to EI classification, Pyroguard Infinity provides the highest level of integrity and heat insulation, protecting against flames, smoke and heat.
Sponsored
Farmhouse, Somerset

Farmhouse, Somerset

Aluminium Roofline Products Ltd

Devils Pit Farm is a detached farmhouse and is situated in the Blackdown Hills, an area of natural beauty near Taunton.The client had been experiencing problems with the existing uPVC gutter – it had begun to fail, and the joints had separated, which led to dampness creeping into the building, causing damage to the paintwork.The client was impressed after Mike from Simply Seamless Guttering (SSG) demonstrated the Mustang® Aluminium Seamless Gutter Machine.Mike from SSG visited the property to measure up and provide a quotation to replace the whole system, including aluminium downpipes. This was accepted, and shortly after, SSG installed the new rainwater system on-site.Mustang® Aluminium Seamless Guttering is a unique joint-less system and is the only seamless gutter system approved by the British Board of Agrément (BBA).Mustang gutters are roll-formed on-site in lengths of up to 30 metres with no joints, meaning no leaks, creating a neat, maintenance-free product of the highest quality that adds extra visual appeal with the additional peace of mind a premium product has been fitted. Mustang® guttering is manufactured from 90% recycled Aluminium and can be recycled at the end of its useful life.Mustang® Seamless Aluminium Guttering teamed with Colonnade swaged aluminium downpipes is an ideal replacement for the existing uPVC gutters because it is lightweight, non-corrosive and cost-effective. Made from recycled aluminium, it is durable and long-lasting and has an expected life span of over 30 years.The homeowner was particularly keen on the benefits of having a low-maintenance and unique joint-less system.Mike Smith of SSG is a Mustang® approved contractor, meaning he has received training, and ARP has inspected his work to ensure it meets the highest standard. ARP are happy to recommend him on future contracts knowing he will use quality ARP products.For Mike, the ability to offer a BBA Accredited System gives his clients the peace of mind that a quality system has been installed and will last for at least 30 years with little maintenance. 
Sponsored
Soundis Absorb-R Gypline aw at Bristol University

Soundis Absorb-R Gypline aw at Bristol University

Soundis

Like every other institute of learning, the University of Bristol has to provide world class educational facilities, but also find new revenue streams. One such area is the provision of commercial conference space. This of course brings an extra pressure in the quality of the space provided to fee paying delegates.The atmosphere of the large open atrium was dependent on controlling the level of reverberation, without compromising on the architectural finish.Working closely with the Main Contractors Site Team, Architect and Client, we were involved in the specification for the new Atrium Feature Wall, along with all complex detailing, including expansion joints, louvres and display cabinets.Working closely with Vinci Construction, to carry out the Absorb-R GypLine αw Acoustic Plaster treatment to the Atrium Feature Wall at the University.Soundis Absorb-R GypLine αw system was installed to give a very desirable natural white stippled effect, combined with a highly absorbent functional wall spanning the length and height of the building, rising a full 5 floors.
Sponsored
20,000m2 Rapidur® B5 Binder | B Doherty Screeding Services | National Mental Health Hospital Portrane

20,000m2 Rapidur® B5 Binder | B Doherty Screeding Services | National Mental Health Hospital Portrane

SMET Building Products Ltd

SMET supplied 20,000m2 of superior-quality Sopro Rapidur® B5 Rapid Drying Screed Binder to Smet Supported Partner, Brendan Doherty Screeding Services, for the flooring solution in the new hospital complex, The National Forensic Mental Health Service (NFMHS) in Portrane.The NFMHS is a new state-of-the-art facility located 22 km from Dublin City in Portrane, North County Dublin. The project was awarded by Health Service Executive to the Joint Venture formed by OHL (50%) and OHL’s local delivery partner JJ Rhatigan (50%).German-made Rapidur® B5 Rapid Drying Screed Binder is a special polymer-modified binder for particularly economical ­production of high-strength, rapid-set cement screed – based on DIN 18560 – allowing early floor installation, and for laying to falls.  Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds, and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid Rapidur® B5 screed floor is ready to receive floor covering after approx. 3 days – after the achievement of moisture content ≤ 1.8 % CM. Sopro Rapidur® B5 is supplied in 25kg bags, with 40 bags per pallet.Key features of Rapidur® B5:• Ready for tiling after only approx. 3 days• Achieves grade CT-C45-F7 after 28 days*• Pumpable• For fast-track or tightly scheduled screed laying and laying to falls• Suitable for floor heating systems• Long working life: approx. 2–3 hours• May be applied in mixing ratios 1:4 and 1:5• High resistance to moisture migration from the substrate• Suitable for renovation and refurbishment schemes• EMICODE system of GEV (German Association for control of Emissions in Products for Flooring Installation): EC1PLUS R (‘very-low-emission-plus’) rating• For indoor and outdoor useSMET delivers another innovative, showcase flooring solution to their Smet Supported Partners. Click the link to see a showcase of jobs recently completed by expert screeder, Brendan Doherty Screeding Services.
Sponsored
Sherwood Lodge - Regeneration

Sherwood Lodge - Regeneration

Aspex UK Limited

Sherwood Lodge – a new £18.5m joint headquarters for Nottinghamshire Police and Nottingham Fire & Rescue Service. Scheduled to open by the end 2021. Aspex products were selected by YMD Boon working with Gleeds for Nottinghamshire Police, Fire & Rescue.Products supplied: Ironmongery, Integra Doorsets and Novista Riser Timber Doorsets
Sponsored
Rochdale Riverside Cinema - Acoustic Floating Floors

Rochdale Riverside Cinema - Acoustic Floating Floors

Total Vibration Solutions Limited t/a TVS Group

As part of the Rochdale Riverside new development, the TVS Group was approached to assist in the construction of a new 6-screen Reel Cinema to ensure that Reel’s acoustic requirements for the space were met, as well as ensuring that adjacent businesses would not be adversely affected.
Sponsored
Thyssenkrupp - Essen, Germany

Thyssenkrupp - Essen, Germany

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

The key to this unique spacial experience was choosing the right materials for the finish. PanDOMO® offered a monolithic system for a seamless, fully custom-designed surface resulting in a harmonious, flowing space with a clear, reduced design, resulting in an absolutely stunning effect.
Sponsored
Christopher Wren Church

Christopher Wren Church

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

St Andrew Holborn has stood as a Catholic Church for over 1000 years. Throughout its history it has received several major renovations, but it is most famously known for its late 17th century rebuild by the renowned architect Christopher Wren, who later went on to design one of London’s most recognisable and historic landmarks, St. Paul’s Cathedral. The latest large-scale works date back to the 1950s, and six decades on it was deemed in need of repair again.
Sponsored
Starbucks Roasterie - Shanghai

Starbucks Roasterie - Shanghai

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

The stunning appearance of the finishing surface produced by the PanDOMO® Wall System integrated with the ambient lighting effect perfectly, whilst complying with the owners quick installation and drying requirements.
Sponsored
Houses of Parliament - London

Houses of Parliament - London

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

As part of a major refurbishment of listed parliamentary estate buildings, only ARDEX products were trusted to restore and protect these iconic working areas for years to come. 
Sponsored
Monsoon Store - Wimbledon

Monsoon Store - Wimbledon

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Workers were walking over the levelled fl oor just 3 hours after applying the ARDEX A 38 fl oor screed, allowing work to continue and ensuring the store was open in time for the Wimbledon Tennis Championships
Sponsored
MEGAPRESS IMPRESSES AT STYLISH DEANSGATE DEVELOPMENT

MEGAPRESS IMPRESSES AT STYLISH DEANSGATE DEVELOPMENT

VIEGA LTD

Viega’s Megapress press connection technology has been installed across 11 floors of a new £85 million development, 125 Deansgate in Manchester. Selected for its speed of installation and its reputation as a trusted method for connecting thick walled steel tube without hot works, the Megapress connections have been used throughout the heating system.With 12 floors in total, 125 Deansgate echoes the industrial Victorian architecture of the Deansgate area and comprises 117,000 square foot of offices above 12,000 square foot of retail space at ground floor level. The development is expected to achieve a BREEAM Excellence rating on completion.Briggs & Forrester Engineering Services Ltd. were awarded the M&E contract by main contactor Marcus Worthington & Co. Ltd. and began on site in May last year. Briggs & Forrester had not previously worked with Viega’s Megapress system in its northern region so this was the team’s first experience of the product.On the decision to use it in this development, Richie Jones, Site Manager for the company commented: “The project specification suggested using a crimp system for the pipe connections, but Briggs & Forrester Engineering Services do not use lightweight carbon steel crimp systems, so we were looking for an alternative.“Our sister company, Briggs & Forrester Living highlighted that they had used a Viega press connection system on one of their projects and had also been on a Viega factory tour where they had been impressed with the Megapress system. After researching Megapress and the installation process ourselves, we decided to use the product for 125 Deansgate.”In total, approximately 7,000 Megapress connection joints were installed, with somewhere between 500 and 650 joints being used per floor across the 11 floors of office space.Richie highlighted that while Briggs & Forrester were working to a tight programme, Viega’s Megapress helped the company to meet its installation targets though its simple installation process.Using Megapress press connections can provide a 60% to 80% time saving compared with alternatives such as welding, grooving or threading tube. Viega’s proven SC-Contur technology is also designed to deliver a 100% positive leak if a fitting is left unpressed which is clearly discernible during leakage testing or when the system is filled for the first time. This prevents costly remedial work that might be required later on and can again save contractors a significant amount of time on site.Richie continued: “The installation of the Megapress connections was simple and we did not have any issues with the products. There is a good selection of connections to choose from to suit any installation requirement and the system is also simple to clean which reduces the flushing time and overall cost.“We will definitely use Megapress again - using Viega is like going back to using traditional heavy grade steel pipe systems but with a modern twist.”Paul McCormick, Senior Project Manager at Marcus Worthington & Co. Ltd commented, “As yet, Briggs and Forrester have not started to test the system; however, from a safety stand point the Megapress system is much better than traditional brazed pipework as it cuts down on the number of live hot works permits required at any one time and is also less prone to workmanship errors. I look forward to seeing the system prove its reliability during testing.”
Sponsored
Rhenofol CG and green roofing forms a key part of the roof design at Barking Riverside

Rhenofol CG and green roofing forms a key part of the roof design at Barking Riverside

AccuRoof

Green roofing forms a key part of roof design as part of a model for sustainable living in 21st century London. Barking Riverside is a joint venture project between Bellway Homes and the Homes & Community Agency. It is an element of the Mayor of London’s plan to build 10,800 new homes, retail, transport links and new town facilities in the Barking region of East London.
Sponsored
European Spallation Source (ESS)

European Spallation Source (ESS)

Inpro

Architect: Henning Larson - CopenhagenContractor: SKANSKA - SwedenThe ProjectESS / European Spallation Source, located in Lund, Sweden, is a joint European research facility to which 13 member countries contribute technical equipment, expertise and funding. Researchers worldwide will be able to study materials in detail allowing them to investigate solutions for some of the world’s most complex challenges in material research, renewable energy, biomedicine and pharmaceutical pursuits. The facility is expected to open for research in 2023.Not only will ESS become a world-leading research facility, it will also be one of the most sustainable and energy smart research infrastructures.The ESS energy concept is based on three pillars: the facility will be very energy efficient and will use as little energy as possible, all energy will come from renewable energy sources and the waste heat will be recycled.Inpro® Products UsedFireline® 140 Fire BarrierSeries 114 Drywall Wall and Ceiling Interior SystemSeries 651 Surface Mount Exterior SystemSeries 672 Bellows Roof Exterior SystemSeries 995 Fire-rated FoamWhy did Skanska decide to work with Inpro?The project started 2 years ago with a single request for information from Henning Larsen Architects – Copenhagen. In 2019 Inpro were asked by Skanska to tender for an expansion joint product line addressing the exterior cladding of this unique facility. At that time, several other manufacturing companies were being considered for the wide ranging scope of movement joints required. However after in depth interviews, only Inpro was able to offer all the complex joint solutions required in one primary supplier.Detailed Sustainability product information was submitted and verified by third parties.Complicated Shop Drawings and take-offs of the massive 6-building involved depicting multiple complicated transitions between varying substrates, differing products and a range of geometries for the custom-made solutions.Demonstrated our ability to overcome complex technical and field-related problems.Were involved with hours of online meetings with the main stakeholders- Skanska technical teams, the Architectural team and the Installing Contractor in a collaborative approach to implement best practice and minimize risk.This was an Inpro team project including Senior Product Management, Sustainability team, estimation and commercial management who all played an important part to land this iconic development with SKANSKA.
Sponsored
Solihull - Metal Gutter Coating

Solihull - Metal Gutter Coating

Liquasil Ltd

This metal gutter in Solihull was corroded, flaking and soiled, and the Liquasil Gutterseal system was specified for a fast, effective repair. Once prepared and cleaned, our SWT Corrosion Primer was applied prior to the application of our Non-Sag Sealer to the joints and Liquasil One topcoat to the entire length of the gutter.The completed installation formed a seamless finish, guaranteed to last 15 years from completion.
Sponsored
Alltech

Alltech

Canal Architectural

Canal designed and installed and impressive steel and glass feature staircase for a commercial setting. This bespoke design comprised of four joint free, smooth helical staircases, connected by an intermediate landing fabricated from reinforced concrete. The Canal team designed each staircase to comply with BS5395: Part 2, 1984 (spiral and helical staircases) and Building Regulations Approved Document K.
Sponsored
48 Carey Street, London

48 Carey Street, London

SELO

The high performance folded steel frames with an integral perforated plaster bead allow the plaster or tape and jointing compound to be applied up to the edge concealing the door frame and all fixings. Extensive testing has been carried out to cover all fire and acoustic requirements. As such, Selo’s range of concealed riser doors is the most extensive and versatile range on the market to date.
Sponsored
City of London Academy, The Britannia Project, Shoreditch Park

City of London Academy, The Britannia Project, Shoreditch Park

Junckers Ltd

City of London Academy Shoreditch Park by Feilden Clegg Bradley Studios forms a part of The Britannia Project, regenerating a thriving London community with new facilities and amenities including new housing, a new school and community leisure facilities. Built to cater for the anticipated expanding population, the new development forms a harmonious addition to the existing neighbourhood with new, high-quality public spaces. The new secondary school for 900 local students plus a 200 student sixth form school had complex underground constraints to take into consideration in the design process, a challenge which informed every part of the building, including the choice of flooring and its installation in the school sports hall. Proposed Crossrail tunnels beneath the building meant the sports floor had to be able to cope with a much larger amount of structural movement than what would be considered normal for a building of this kind. Junckers’ technical department worked closely with the architect exploring a number of options to finally help them arrive at a solution which could accommodate an unusually large amount of structural movement and at the same time retain the sprung quality of the floor for sports and other activities. Junckers Approved Contractor V.A. Hutchison fitted Junckers 22mm solid Ash Champion over New Era battens with 125mm insulation between battens. Line markings for four badminton courts as well as basketball, netball and handball courts ensure the sports hall will serve the school and the wider community as a hub for multiple events and activities. The floor is area elastic and fully complies with EN 14904 class A4, a high-performance sprung floor which will serve the school and community for decades to come. A 22mm Junckers sports floor can be sanded and refinished up to ten times without losing performance, and with regular sandings in 12-year intervals, a lifespan of 60+ years as set out by the RIBA 2030 Climate Challenge can easily be achieved. Funding for schools issued by the Department for Education is now dependent on fulfilling strict sustainability criteria. Junckers has independently verified certification to show its flooring fulfils these criteria, In addition to the sports hall, Junckers flooring was specified for the school’s main hall, which is used for drama and other activities. The original specification was for a vinyl floor, but as a more sustainable solution, Junckers’ 22mm Nordic Oak in the Classic grade was selected. V. A. Hutchison Flooring installed the oak floor on New Era battens with 125mm insulation, including an area of 91 m2 of extra battens for support in the main hall. Jo Gimenenz, Architect at FCBStudios added: “We have worked with Junckers for many of our projects, CoLASP being one of the most recent and they always provide an excellent technical service. Particularly so on this project where we had to overcome a complex structural movement joint detail in our ground floor Main Hall, due to proposed Crossrail tunnels beneath the building. A Junckers flooring system was also installed in our Sports Hall. For this space we opted again for a solid timber flooring in lieu of a vinyl topped raised floor as it was a more sustainable solution.” 
Sponsored
Innovative insulation solution helps housing project ensure quality fabric-first approach

Innovative insulation solution helps housing project ensure quality fabric-first approach

Recticel Insulation

Eurowall®+, Recticel’s innovative full-fill cavity wall PIR board, has been chosen for a new affordable housing development. With its advanced tongue and groove joint, it helped to achieve the project’s desired U-value whilst ensuring a ‘built as designed’ envelope.In total, 2000m2 of Eurowall®+ board was installed as part of a £3.3m new-build project in Bedmond Road, Abbots Langley – a large, picturesque village in Hertfordshire. On completion, the 17-home development on behalf of housing association, Thrive Homes, will introduce ‘good quality’ properties to the area. In order that the buildings achieved the regulatory U-value, the insulation needed to ensure a high-quality build whilst being simple to install. Eurowall®+ met both requirements comfortably.  Jarvis Contracting, in conjunction with architects, Avebury, was selected to deliver the scheme. It included the installation of 90mm-thick Eurowall®+ insulation, which earns its billing as Recitcel’s ‘flagship’ product due to its innovative composition and exceptional thermal performance. The boards have a tongue and groove joint on all four edges to ensure they lock tightly together. This inventive format helps to eliminate moisture ingress and possible heat loss through poor joints, whilst offering bricklayers a faster way to build. Once fitted together the boards created a thermally tight envelope, ensuring the fabric-first approach resulted in warm, efficient homes for the Bedmond Road project.  Eurowall®+ can achieve a 0.18 U-value with a 90mm-thick panel in a 100mm cavity. To reach the same thermal performance with mineral wool, for example, the project would require a much thicker insulation. Therefore, Eurowall®+ helps reduce a building’s footprint; a crucial characteristic where plot size is limited.  Indeed, the 10mm air gap, which is created by a 90mm Eurowall®+ PIR board achieving a U-value of 0.18 W/m2K in a traditional 100mm masonry cavity wall, helps speed-up installation times for a more cost-effective build in comparison with other rigid full-fill solutions.Simon Blackham, Technical Manager at Recticel Insulation explained:"Eurowall®+ benefits the installer, due to its slim composition facilitating a more rapid, effective installation, whilst its performance ensures regulation energy requirements are achieved. Such all-round capabilities made it ideal for the Bedmond Road project. It didn’t disappoint on either count."Strong and durable, Eurowall®+ will not degrade or deteriorate due to moisture. This means its thermal performance will be maintained for the long-term comfort and wellbeing of the future occupants of this fine-looking and much-welcome new housing development. About Eurowall®+:Eurowall® + is a premium, high performance full fill insulation board with precision cut tongue and groove joints on all four sides. This ensures that the boards lock tightly together minimising heat loss through thermal bridging. This unique joint offers increased protection against wind driven rain as well as improved windtightness. Eurowall® + is also designed with a 10mm cavity requirement in mind, so that space can be left for conventional bricklaying techniques.
Sponsored
Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

SMET Building Products Ltd

Job: Maldron Hotel Swimming Pool Renovation, Portlaoise, Co. Laois.Smet Supported Partner:Precision Building Services – Mark PembertonProducts: Sopro Rapidur® B5 Rapid Drying Screed BinderMerlin Barrier CoatSopro RAM 3 (454) Renovation and Levelling MortarSopro GD 749 Universal Floor and Wall PrimerSopro DSF® 523 Tanking MembraneSopro PUK 503 PU AdhesiveSopro VF HF 420 – VarioFlex® High Strength Flexible Tile AdhesiveSopro’s No. 1 Flexible Tile AdhesiveSopro FKM® XL 444 – Extra Light Weight Tile AdhesiveSopro Sanitary SiliconeSopro DE 014/015 Sealing CornersSopro FEP 508Sopro DBF-638Racofix 818Description:SMET supplied Smet Supported Partner, Precision Building Services (Mark Pemberton), for the renovation of the Maldron Hotel Swimming Pool, Portlaoise, Co. Laois. A total area of Floor screed @ 140m² | Wall tiling @125m² | Floor tiling @ 140 m² was completed.New floor installation with fast-track – rapid drying floor screed solution, using Sopro Rapidur® B5 Rapid Drying Screed Binder, a fast-setting screed which was laid to falls prior to waterproofing and tiling providing an early completion. German-made Rapidur® B5 Rapid Drying Screed Binder is a special polymer-modified binder for particularly economical ­production of high-strength, rapid-set cement screed – based on DIN 18560.Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid Rapidur® B5 screed floor is ready to receive floor covering after approx. 3 days – after achievement of moisture content ≤ 1.8 % CM. Sopro Rapidur® B5 is supplied in 25kg bags, with 40 bags per pallet.Sopro Rapidur® B5 was installed directly on top of Merlin Barrier Coat wet on wet. The screed was ready for waterproofing/tiling after 3 days. This system was also used to repair the Jacuzzi’s surrounding walls prior to waterproofing, tiling, and grouting.Sopro RAM 3 levelled the deck area (3-60mm) between the drainage channel edge and pool perimeter movement joint. Sopro RAM 3 was bonded with Sopro GD 749.
Sponsored
Verdo-Kew Bridge

Verdo-Kew Bridge

Keyfix

IntroductionThe speed of installation and improved build quality of the Keyfix Non-Combustible Cavity Tray System has played an important part in the construction of a major new high-rise residential development in West London and at the same time help meet and exceed regulatory requirements.OverviewLocated close to the Thames in Brentford West London, Verdo – Kew Bridge is a new mixed use development which forms part of a major new regeneration scheme that includes the new community stadium for Brentford FC. Designed by Broadway Malyan and built by developer EcoWorld, it comprises of 487 new one, two and three-bed homes alongside retail and business spaces, public green spaces and community areas.In order to safeguard the future of the development, Keyfix supplied 765 metres of Keyfix Non-Combustible Cavity Trays (NCCT) along with 2490 Corner Units, 4000 Pier Units and 5000 Weeps on blocks E,F,G and H of the development.ChallengeOne of the key challenges for Keyfix was the brickwork build programme which required early completion at the lower grid line levels of one to six. This was due to the scaffolding needed to be stripped away because it was blocking a walkway at Brentford Stadium and therefore needed to be cleared prior to the start of the new football season.SolutionWorking to a tight schedule, the offsite fabrication and preforming of bespoke non-combustible cavity tray units in line with the brickwork set out drawings saved time for the installation team at brickwork contractor DWG. This one-piece NCCT system allowed for a very simple and very efficient install, enabling the brickwork façade to continue at a fast pace.The Keyfix stainless steel NCCT was specified due to its self-supporting system which doesn’t need fixing back to the internal concrete frame and clips together for fast and easy installation. It is essentially a ‘Fix & Forget’ solution with no additional fixings, sealants or onsite fabrication required by the brickwork contractor. Therefore, installation of the trays did not impede the speed of bricklaying even when compared to traditional DPC. Installed in the outer leaf with no connection with the inner skin, this innovative cavity tray system does not create a thermal bridge and eliminates all issues associated with differential movement.Furthermore, the NCCT is manufactured with integral Stop Ends on each cavity tray to ensure water is trapped and channelled outwards via a Keyfix Non-combustible Weep (NCW). The integral Stop Ends also facilitate perp joint width adjustability of +/- 3 mm between 7–13 mm if required.With a lifespan of 125+ years it is the only non-combustible cavity tray system that does not rely on tapes and mastics to make watertight joints, therefore eliminating one of the main reasons for product failure.Commenting on the project, Kieran Coyle, Keyfix Technical Sales Manager said: “Verdo – Kew Bridge was the first project in which we created and used a Component Schedule and this is now the same component schedule template we use on every project. It allows installers to use new Component Codes to identify the different components and install the system to its full integrity.”Holding an A1 Fire Rating, the Keyfix non-combustible cavity tray solution exceeds the minimum standards set out in ADB (Approved Document B), whilst ensuring this major new development meets and exceeds the latest regulations. If the regulations become stricter, it will also be futureproofed maximising the whole-life value of the development.Set to make its mark on West London, Verdo – Kew Bridge is on track for completion, with the Keyfix Non-combustible Cavity Tray meeting the contractors requirements and enabling the creation of a development that has safety built in.For more information about the Keyfix range of non-combustible solutions download the product guide, visit https://keyfix.com/or for technical support call 028 8676 7508 or email info@keyfix.com
Sponsored
White Marble Stone Luxury Vinyl Marble Tile for Caffé Di Milano

White Marble Stone Luxury Vinyl Marble Tile for Caffé Di Milano

The Solid Wood Flooring Company

Our White Stone Impervia® Marble Tile is 100% waterproof and is finished to a commercial grade. This tile also has an MGO core and is reinforced with tough fibreglass for stability and durability which also means it's fireproof.Some of the benefits of our White Stone Impervia® Marble Tile include:The rigid core helps to prevent warping when exposed to moisture.Great at resisting damage from impacts like high heels and heavy objects.
Sponsored
Lush Store - Ottawa, Canada

Lush Store - Ottawa, Canada

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Lush sees PanDOMO® as the perfect option for feature walls in their retail locations. It offers rapid installation and provides a unique finish that can be colour matched to their different concepts.
Sponsored
City Library - Stuttgart, Germany

City Library - Stuttgart, Germany

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Considered an inspiration to science and culture, the architect's vision of absolute homogeny and clarity was realised with PanDOMO® offering the clean, virtually seamless surfaces required, whilst meeting the demands of high traffic areas.
Sponsored
HOTEL AND LEISURE - THE HEXAGON - STAIR NOSINGS

HOTEL AND LEISURE - THE HEXAGON - STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Challenge The Hexagon is a well established multi purpose venue, in the heart of Reading that was built in 1977. As well as drama productions, it hosts a range of events such as Dance, Comedy, Classical Music, Rock and Pop concerts. The venue can hold up to 1600 people, with much of the capacity arranged in levels of banked arena-style seating with stepped access. The nature of the performances at the venue mean access up and down these stairways by patrons is often in low light levels which means there is a risk of slips and falls.
Sponsored
TRANSPORT - SOUTHAMPTON AIRPORT - STAIR NOSING

TRANSPORT - SOUTHAMPTON AIRPORT - STAIR NOSING

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Southampton Airport is an international airport serving over 40 destinations. As the 18th busiest UK airport, it handled over 1.7 million passengers in 2013. Safety and security are paramount at any airport and emergency procedures and facilities need to be flawless and well maintained. Improvements were required to the emergency staircases in the airport’s multi-story car park. Previously, only a yellow strip was painted on the edge of the concrete steps across the 5 stairways, which meant the potential slip hazard was great.
Sponsored
HOTEL & LEISURE - THE HEXAGON - STAIR NOSINGS

HOTEL & LEISURE - THE HEXAGON - STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Challenge The Hexagon is a well established multi purpose venue, in the heart of Reading that was built in 1977. As well as drama productions, it hosts a range of events such as Dance, Comedy, Classical Music, Rock and Pop concerts. The venue can hold up to 1600 people, with much of the capacity arranged in levels of banked arena-style seating with stepped access.
Sponsored
Royal Albert Hall - London

Royal Albert Hall - London

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

400m2 of ARDITEX NA provided the perfect levelling and smoothing solution for one of the most treasured and distinctive buildings in the UK.
Sponsored
Adidas Store - Vantaa, Finland

Adidas Store - Vantaa, Finland

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Requiring a minimalist look for multiple stores across the globe, ADIDAS specified ARDEX K 80 Industrial Topping/Wearing Surface to provide the look and performance needed for such demanding environments.
Sponsored
Sydney Opera House - Australia

Sydney Opera House - Australia

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Australia’s busiest cultural precinct relied on 12,000m2 of ARDEX waterproofing products to offer protection against the enduring threat of moisture.
Sponsored
North Manchester General Hospital

North Manchester General Hospital

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Demanding environments require a proven system. This 1800m2 Accident and Emergency department was  refurbished with cost-effective, fast track products from ARDEX, to the total satisfaction of the client.
Sponsored
King's Cross Railway Station

King's Cross Railway Station

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

4,300m2 of screeding, tiling and grouting was installed in the new state-of-the-art ticket hall. Taking advantage of ARDEX’s unique RAPIDRY FORMULA Technology, ARDEX A 35 Screed Cement was laid to 85mm and was ready for tiling in just 24 hours.
Sponsored
Savoy Hotel Restoration Project

Savoy Hotel Restoration Project

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

“ARDEX have developed a range of tile fixing products that exceed expectations, and enabled us to maintain our reputation for excellence. We were delighted with the results at The Savoy”. Rafi Mimoni, MD Mega Marble
Sponsored
St.David's Shopping Centre - Cardiff

St.David's Shopping Centre - Cardiff

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

8,000m2 of limestone tiling was fixed using ARDEX X 7001 W Tile Adhesive with Rapidry Formula  Technology. The luxury tiles were grouted in just two hours, providing the perfect finish to the £675m modernisation of the shopping centre.
Sponsored
DAVID LLOYD LEISURE CLUB

DAVID LLOYD LEISURE CLUB

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

As part of a £50million group investment, the prestigious Colchester club needed 3,500m2 of tiling to cover the swimming pools, changing rooms, walkways and reception areas. Products used: ARDEX A 38, ARDEX E 100, ARDEX S 7, ARDEX WPC, ARDEX X 77, ARDEX X 78, ARDEX X 7, ARDEX-FLEX FS, ARDEX-FLEX FL, ARDEX WA
Sponsored
Selfridges Food Hall - London

Selfridges Food Hall - London

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Over 200 million visitors visit Selfridges every year. So when the iconic food hall needed renovating, only ARDEX products could achieve the speed and reliability needed for this high footfall environment which had to be ready for the public every morning.

Showing 721-756 of 867

Feedback