NBS Source
I'm a manufacturer

"fencing"

766 results found

Sort by:

Showing 109-144 of 150

Sponsored
CHIEF DUBS G8 SUMMIT ‘MOST SECURE EVER’

CHIEF DUBS G8 SUMMIT ‘MOST SECURE EVER’

Zaun Limited

The G8 Summit in Enniskillen of the world’s most powerful politicians involved 4,700 Police Service of Northern Ireland (PSNI) officers and 3,600 from other UK forces in a security operation that cost about £60m.The PSNI wanted the securest G8 ever at a time of ‘severe terrorist threat’ and hoped that its reputation for dealing with public disorder plus unprecedented physical, cyber, technical and logistical protection would keep many potential protesters away.The SolutionPSNI approached Zaun to design, manufacture, project manage and install an ‘impregnable cordon’ around the world leaders to guarantee their security throughout the summit at Lough Erne.The rectangular site was protected on its long northeastern boundary by the Lough Erne lake. After extensive testing, Zaun designed its single largest ever temporary installation using two of its premier high-security fencing systems for the other three sides.It installed its 3.6m high SecureGuard PAS68 temporary security fencing along the 5.7km road to the southwest of the site, which runs broadly parallel with the lough. In addition, Zaun integrated rising arm barriers and 10 PAS68 gates for secure access control along the fence line.It also put in 1.7km of its award-winning Rapid Deployable System (RDS) at each end, creating a secure perimeter from the road to the edge of and into the lake.RDSZaun had to make several adaptations to its multi-award-winning RDS that was first used for four political conferences on the mainland in 2012 and bought by The Home Office to add to the National Barrier Asset.In addition to the cable system on the front of the fence line gives the system it's PAS68 rating of 30mph (PAS 68:2010 V/7500(N2)/48/90:11.6/0.0), Zaun incorporated further enhancements to prevent mob attack on the run-up to the summit. Both RDS and SecureGuard were extensively tested by PSNI and the Home Office against mob attacks. These tests will now form the basis of a new standard adopted by the Home Office when testing systems.Zaun also created specially designed posts to carry additional one-tonne weights to prevent movement on the 30-metre section of RDS fencing that actually tracked into the lake itself to discourage protesters from breaching the perimeter via the water.RDS was used on remoter areas around the edge of forest land, dirt tracks and grassy knolls with undulating ground, and boggy land at the airport to provide Airforce One and other presidential jet landings.
Sponsored
Cobalt Business Park

Cobalt Business Park

CLD Physical Security Systems

At 1.5 million sq ft, the Cobalt Business Park is the UK’s largest office park. The development is home to a number of public and private organisations such as the Department for Work and Pensions, North Tyneside Council, Utility Wise, Procter & Gamble, and Accenture.Along with the offices, the park also houses three data centres, designed to store data for companies. These Data Centres cover 10,000 sq M of Data Hall space, making it one of the largest carrier-neutral wholesale co-location campuses in the North.The BriefPhysical security was key for the creation of a Fencing and Gate package to protect over 10,000m2 of data hall space.358 LPS 1175 SR1 Fencing SystemAnti-Climb MeshSawtooth Security ToppingUpgradable System in event of change in security requirementsVarious Physical Access Control Systems
Sponsored
RAF Akrotiri

RAF Akrotiri

CLD Physical Security Systems

RAF Akrotiri is home to the Cyprus Operations Support Unit providing joint support to British Forces Cyprus and operations in the region to protect the UK’s strategic interests.The base was opened in 1955 to initially relieve the pressure on the main RAF station on the island, and has since grown into a forward thinking training unit. However, back in October 2015 the RAF base was subject to many reports when 114 refugees landed at the British Sovereign base; a critical front line station for the MOD and Royal Air Force.The BriefIn order to detect, deter and delay any potential threat, the client had a number of requirements to meet the increasing level of security for the base.Increase protection of assets and personnel with their security fence line.Approved for Government Use fencing system.Provide a robust solution to stand up against the rigours of daily life and exposure to harsh aviation fuels.
Sponsored
MEDIA CENTRE GETS GOLD MEDAL SECURITY

MEDIA CENTRE GETS GOLD MEDAL SECURITY

Zaun Limited

Olympics organisers accredited 21,000 media and broadcasters to report on the greatest show on earth. They were crafting the story beamed to the estimated global audience of almost five billion tuned in to London 2012.Quite apart from keeping them safe and secure, any hint of a breach of security would have been latched upon, sending negative tales of London far and wide and damaging the city’s image and the nation’s tourist industry for years. The SolutionThe London Olympics Media Centre (LOMC) was designed by architects Allies and Morrison. It is 900,000 sq ft and 275m long and cost £355 million to build on the former Hackney Wick Stadium close to the Riverbank Arena.The main contractor Carillion asked Zaun to design, manufacture and install the 1.5km of HiSec and MultiFence security fencing with the same Super6 panels as the Olympic Park perimeter. The two high-security fencing systems use a close mesh of 6mm steel vertical wires near impossible to scale and very hard to cut through except with power tools.The fencing incorporated vehicle and pedestrian access points, as well as detection systems and CCTV. The Olympic Delivery Authority planned to create a high-security complex of business space that would form part of the legacy to the Games, recouping much of the public investment in the construction.The LOMC was part of Zaun’s Olympics contract, its largest ever, which included work on the perimeters to the Olympic Park and Stadium and temporary installations at venues across the country, all completed on time and within budget.
Sponsored
GLASGOW 2014’S GOLD MEDAL SECURITY

GLASGOW 2014’S GOLD MEDAL SECURITY

Zaun Limited

The city’s reputation assured under the spotlight of billions of viewersThe ChallengeCommonwealth Games hosts welcomed almost 5,000 athletes from 71 competing nations to the 20th Games at Glasgow 2014. They were the players on the stage across 18 sports, with the action broadcast to an estimated global audience of one and a half billion.For a fortnight of summer 2014, the eyes of the world were trained on Glasgow, so organisers had to deliver impeccable security to protect competitors, spectators, volunteers and dignitaries alike to preserve and enhance the city’s global image.The SolutionOrganisers awarded the prestigious contract as the Protective Perimeter Security provider to Selex ES, the Finmeccanica subsidiary, who turned to the largest supplier of perimeter fencing protection to the London 2012 Olympics.Selex ES handed almost £4 million of contracts to integrated high-security perimeter event overlay specialist Zaun to design, manufacture, install and decommission a broad vista of temporary high-security fencing systems across Glasgow 2014 sites.Together, they provided a wide range of physical security measures to secure over 20 Games venues at Glasgow 2014, including the Commonwealth Games Village for athletes and other Tier One venues such as the iconic Celtic Park, which was used for the opening ceremony, and Hampden Park, where the games officially closed.Zaun supplied several thousand metres of its MultiFence and award-winning RDS systems at heights of 3m and 2.4m, with sections fitted with Hostile Vehicle Mitigation (HVM) enhancements.Zaun also installed hundreds of vehicle and pedestrian gates and CCTV columns incorporated into the fencing.
Sponsored
FRESH WHARF DEBUTS DBS SECURITY SYSTEM

FRESH WHARF DEBUTS DBS SECURITY SYSTEM

Zaun Limited

A former brownfield industrial site alongside the River Roding in Essex is converted into attractive mixed-use community housing. The Met Police custody and patrol base for the borough, industrial businesses, restaurants, river moorings and 1000 homes.The developer wanted to replace old and damaged wooden hoardings around a section of the Fresh Wharf Estate perimeter in Barking and prevent damage to a bus shelter from stone chips thrown up by passing vehicles on the adjacent A406.The SolutionFresh Water Developments approached Zaun to devise a bespoke solution for the site on the banks of the Roding, a Thames tributary. They wanted a sustainable perimeter, deflected flying stone chips, minimised noise and met their aesthetic, design and functional needs.Zaun has integrated a new highly resistant laminate made entirely from mixed waste plastics with its market-leading Duo fencing to produce a system that won’t rust or rot. In addition, it is low maintenance and reusable or recyclable if damaged.The innovative product design named DBS Security boasts great acoustic-loss properties, rated B3 and 36dB loss, and gives protection against damage from flying objects flicked up by passing vehicles.DBS Security protects a bus shelter close to the North Circular that constantly has to undergo repair. A large section of the perimeter to the industrial site and housing is fitted with Zaun’s twin-wire Duo fencing system. Two horizontal wires resist being welded on either side of the vertical wire.Zaun combined both standard and bespoke fencing to tailor the overall solution to the site’s specific requirements.
Sponsored
ZAUN HOCKEY SOLUTION HAS NO NOCKERS

ZAUN HOCKEY SOLUTION HAS NO NOCKERS

Zaun Limited

Leading English National Premier League side Cannock Hockey Club were fed up with the high maintenance costs of replacing nets and wooden boards damaged by constant ball impacts.So they wanted lower maintenance perimeter fencing when they upgraded their pitches in 2009 – and ideally to limit the noise of the wooden boards under constant impact from 5.5oz balls travelling at speeds in excess of 80mph which was affecting the experience for players and spectators alike.The SolutionFounded in 1905, ‘The Nockers’ is one of the most successful National Premier League hockey clubs in the country, having won the title seven times since the league’s inception 25 seasons ago.But their traditional wooden perimeter boards were effectively sacrificial under hockey’s cannonball-like impacts. As they quickly broke and got worn out, the club was in a constant and expensive cycle of buying and installing new ones.The grounds committee turned to Zaun as a development partner to create a ground-breaking low-noise and -maintenance metal fence perimeter.It replaces nets and wooden boards with twin wire mesh fencing. Fixings every 200mm and rubber EPDM inserts at each fixing virtually eliminate rattle during play.The bottom 210mm – or up to 400mm behind the goals – uses twin horizontal 8mm wires in a close 25x50mm mesh pattern that reduces significantly the noise while withstanding a far greater number of ball impacts without damage.The system is then topped with Zaun’s Super Rebound, which gives better viewing, no risk of player or spectator injury from splinters or mid-rails and no solid surface for vandals to graffiti.
Sponsored
SECURITY WORK FLOWS FROM THAMES WATER

SECURITY WORK FLOWS FROM THAMES WATER

Zaun Limited

The UK’s largest water and waste company is aiming for savings of £500,000 over the next three years in the supply and installation of security fencing and gates across its estate that supplies water to over 14 million people.However, given the risk of accidental pollution, theft and mindless vandalism, safety and security must not be compromised in making the savings across its 600 sites that supply 2,600 million litres of tap water and treat more than 4 billion litres of sewage per day.The SolutionThames Water Utilities chose Zaun as one of four appointed contractors for their three-year framework agreement for the supply and installation of security fencing and gates, with an option to renew for a further two years, worth around £2 million, and one of three for their ongoing maintenance.Thames is looking for savings and the benefits of dedicated account management, certified and experienced perimeter protection designers, engineers and technicians, access to new and innovative products and robust management reporting linked to an exacting service level agreement. Zaun proved its reputation with Thames Water during its multi-billion pound London Tideway improvements to create a cleaner healthier River Thames, on which Zaun addressed some complex planning issues and security needs. Zaun designed, manufactured and installed its ArmaWeave, the highest-rated single panel fencing solution for defending against forcible attack. This solution meets Thames’ security requirements and enables certain installation concerns to be mitigated.Zaun has also put in Axiom, turnstiles, vehicle barriers and pedestrian access control across the Thames’ estate.
Sponsored
WORLD LEADERS SECURED IN THE HAGUE

WORLD LEADERS SECURED IN THE HAGUE

Zaun Limited

Holland had to mount its largest-ever security operation when it hosted the third Nuclear Security Summit at the World Forum in The Hague in March 2014, with 13,000 police officers, 3,000 soldiers and 4,000 military police mobilized during the summit.Organisers had to guarantee the security of the world leaders from 53 countries, including event sponsor US President Barack Obama, and up to 3,000 journalists without unduly disrupting the day-to-day lives and business of local Dutch citizens.The SolutionDutch police turned to a British high-security fencing systems manufacturer with a growing international reputation as the go-to company when world leaders gather and the hosts need to guarantee their protection.Zaun installed 30km of fencing to secure the London 2012 Olympics including VIP emergency gates at the Olympic Stadium which were dubbed the Obama Gates.Last year it provided the same service for the G8 Summit in Northern Ireland and the influential meeting of global leaders and the world’s commercial, political and financial powers at the Bilderberg conference at The Grove in Watford.Zaun worked with long-term partners Hardstaff Barriers and Highway Care to design, manufacture, install and decommission the temporary high-security cordon around the summit, which included 13 gates and almost 3km of fencing, much of it designed to mitigate the attack by hostile vehicles or protesting mobs of people.Debates within the security cordon – 1.8km of SecureGuard and 1.1km of its RDS Rapid Deployable System – focused on how to lock up the world’s nuclear materials more securely so they would not be so easy for terrorists to steal: a field again where Zaun has helped in securing the nuclear industry.
Sponsored
Reducing roadside noise at Fresh Wharf

Reducing roadside noise at Fresh Wharf

Mobilane

Flanked by excellent transport links and with direct access to the A406 North Circular, the construction of the new residential development at Fresh Wharf Estate in Barking, Essex has taken consideration of the resulting traffic noise for its residents. Installed along the perimeter of the development expertly by Billericay Fencing Limited, the resulting 500 linear metre expanse has been soundproofed using Mobilane NoiStop noise reducing acoustic wall.
Sponsored
Distribution HQ: Combi Palisade SL1

Distribution HQ: Combi Palisade SL1

Lochrin Bain Limited

Lochrin Bain were appointed manufacturer of choice for the 2020 perimeter security requirements on Braithwaite Groups latest Mega Shed project for Farmfoods Ltd. Founded over 60 years ago from a butcher shop in Aberdeen, Farmfoods today Employs close to 4000 staff with over 300 shop locations across the UK, from its new Cumbernauld HQ. The projected consisted of a new 240,000 sq ft warehouse, to house one of the largest freezers in the country along with ambient storage facility of over 130,000 sq ft and new Grade A office space for headquarter staff. From the outset of the 52-week build, Lochrin Bain worked with Braithwaite to ensure a specification that offered their client a peace of mind 25 year guarantee while keeping to the original budget. During initial conversations, it was identified that the new LPS1175 Issue 8: A1 certified Combi SL1 Palisade system would be the perfect choice. Alter Landscapes based at Lochwinnoch in Renfrewshire were awarded the supply and installation of the fencing package with several hundred metres of fencing and various gates supplied and installed.
Sponsored
Crawley Down lifted to new FA standards

Crawley Down lifted to new FA standards

Zaun Limited

League regulations demand the installation of a rigid mesh fence with a spectator handrail around the perimeter of the pitch to a height of 1.1 metres. Zaun completed the complex supply and installation as changing ground levels required adaptation to ensure maintaining the 1.1m height around the whole pitch. Zaun contracts manager Steve Hancock visited the Haven Sportsfield Ground to take all of the site details for manufacture and supervised the installation, which was completed a week ahead of schedule.
Sponsored
Manchester City Etihad Training Complex

Manchester City Etihad Training Complex

CLD Physical Security Systems

“We are building a structure for the future, not just a team of all-stars” announced Sheikh Mansour in 2008 with reference to Manchester City Football Club.Six years and £200m later, Mansour’s vision has been realised in the Etihad Training Complex; an 80-acre site where over 450 players train each week. The site, home to 17 football pitches and a 7,000-seat stadium for reserve matches, is an epitome of innovation and state-of-the-art design that CLD is proud to have contributed to.The BriefCreating a world class training complex presents a number of key requirements when it comes to the external, internal fencing systems and physical access control.An external perimeter to LPS 1775 SR1Swing gates with guaranteed delay of at least 3 minutes against attackFast operation cycle main gates to prevent tailgatingPitch separation that allows clear viewAbility to stop balls leaving the training area up to 6m in heightMust compliment the Manchester City brandMUGA fencing that can withstand impact from Professional PlayersFull Operation and Maintanence Schedules ProducedCAD Design and ‘as-built drawings’ of all systems used on the project
Sponsored
North Pole Depot

North Pole Depot

Lionweld Kennedy Group

Lionweld Kennedy provided 'North Pole Depot' with the supply and installation of 2nr maintenance access gantries with integral lifting beams, end stairs, demarcation fences and removeable polyester powder coated lift out handrails.Owned by Hitachi Rail, the North Pole Depot gives direct access to both West London and North London Lines.Utalising our range of safegrids and saferails, we created a accessible and safe platform, which complies with British and European standards.
Sponsored
Sadolin Classic – the versatile choice

Sadolin Classic – the versatile choice

Sadolin, product of Crown Paints Ltd

The ideal choice for specifiers looking for multi-functional wood protection, Sadolin Classic blends outstanding performance with a beautiful finish. Suitable for all exterior wood, Sadolin Classic delivers long-lasting protection for a wide range of timber, including decking, cladding and fencing. It features a high performance formulation which enables the product to absorb deep into the timber, providing exceptional protection against the elements. And as well as being a versatile choice, Sadolin Classic is also available in over 40 shades.
Sponsored
M&S Distribution Centre, Bradford

M&S Distribution Centre, Bradford

Brandsafe

Marks & Spencer has a vast distribution centre located in Bradford. Despite its massive size, they still required a new three-storey mezzanine in order to increase their overall storage capacity. With pallet trucks being operated on these floors, Brandsafe were brought in to provide the required custom solution. A combination of 2.4m high security fencing with built-in pedestrian handrail and low-level Armco protection was produced and installed on-site by Brandsafe. Polymer column protectors were also supplied to protect the mezzanine supports at ground level.
Sponsored
Accoya selected for stunning split-level West Vancouver home

Accoya selected for stunning split-level West Vancouver home

Accoya

Accoya was selected as the ideal material for this breathtaking home in West Vancouver. Accoya was used for the railing, siding, fencing and soffits throughout the property. In addition, an Accoya handrail was specifically custom designed by Upper Canada Forest Products. Unlike anything surrounding it, this home’s irregular shape and atypical residential building materials are more akin to modern-day South American projects that stem from their surroundings to showcase concrete’s versatility. This is why the Accoya was left in its rough state, to accentuate the minimalist and harmonious aesthetics of its natural environment.
Sponsored
Bulk Storage Facility

Bulk Storage Facility

Lochrin Bain Limited

The technical team at Lochrin Bain were approached by an existing client looking to secure a new bulk storage centre located outwith their current secure facility. The global Defence, Aerospace and Security company having worked with Lochrin Bain on previous retro-fit and new build projects, instructed the design house and main contractor Wates Construction of their approved specification with the clients Security Manager opting for Lochrin Bain’s patented High Security Combi™ fencing over a traditional Palisade or Mesh alternatives.
Sponsored
Canaan Lane Primary School, Edinburgh: Italia Eurobin Stores

Canaan Lane Primary School, Edinburgh: Italia Eurobin Stores

Lang+Fulton

Canaan Lane Primary School has been built within the Grange Conservation Area in Edinburgh, an affluent suburb of early Victorian villas. The context of the project therefore called for thoughtful consideration of the neighbouring buildings and the use of a natural palette of materials.The bin store area for refuse and recycling collection occupies a prominent position between the front of the building and the low stone boundary wall to the street. Durability and quality were therefore prime considerations in the choice of product.The wheelie bin stores were made from Italia/100, a robust steel louvred product which provides total visual screening. The double leaf doors were supplied with extra heavy 100×100 SHS posts with base plate fixings to meet the special loading requirement for an environment with small children. A site survey ensured that the hinges were precisely positioned on the posts in a staggered arrangement, to suit the existing slab which was stepped across the rising ground.Each compound was divided with lateral bump rails to accommodate 1100 litre eurobins; in addition the back panel was protected from potential damage by an internal bump rail. Panels and posts were hot-dip galvanized and polyester powder coated RAL7043.Lang+Fulton also supplied Siena fencing around the playground boundaries; a railing fence which provides secure perimeter protection and features a conical top for a smart, traditional appearance.
Sponsored
Whalley Primary School - Clitheroe

Whalley Primary School - Clitheroe

DCM Surfaces

DCM Surfaces were thrilled to be awarded the contract to construct this new build MUGA, following a lengthy tender process.The project included all elements of the build including; excavation of the existing surface, the MOT stone build up, macadam subbase, PCC edges and 1.8m twin rebound wire fence panels around the perimeter.A 12-15mm of black EPDM was installed direct to the tarmac subbase, and then sprayed with an anti-slip coating.Coloured line markings were added following the install, to enable multiple games such as; football, netball and basketball to be played.
Sponsored
One Tower Bridge, London

One Tower Bridge, London

The Outdoor Deck Company Ltd

One Tower Bridge is a prestigious development offering five-star living by the banks of the Thames. It offers uninterrupted views of one of the world’s most iconic landmarks, unrivalled residents’ facilities and the highest of specifications. The Outdoor Deck Company supplied and installed decking, contemporary screens, butt-joint fencing, seating, step and riser units plus pergolas (RAL colour-matched aluminium with hardwood and Cedar slats). This prestigious project was awarded the `Grand Award` and `Principle Award – Hard Landscaping Construction over £1.5m` at the BALI National Landscape Awards in December 2017.
Sponsored
The SSE Hydro: decorative wall cladding for the stage entrance constructed from Stereo-kinetic system.

The SSE Hydro: decorative wall cladding for the stage entrance constructed from Stereo-kinetic system.

Lang+Fulton

The SSE Hydro is the biggest performance arena ever designed by Foster + Partners. Lang+Fulton have now supplied a decorative solution for the stage entrance constructed from their STEREO-KINETIC cladding system. Each stainless steel sheet is engraved with name of an artist, commemorating their performance. When the Hydro first opened in 2013 Lang+Fulton supplied the Roma-3 grating fence which secures the perimeter of the complex and storage compounds, as well as a Micro-15 balustrade for the elevated walkway which connects the car parking facilities with the venue. Product: STEREO-KINETIC cladding
Sponsored
The Hydro: Infill panels for the balustrade were supplied by Lang+Fulton, made from Micro-34 architectural grating.

The Hydro: Infill panels for the balustrade were supplied by Lang+Fulton, made from Micro-34 architectural grating.

Lang+Fulton

The SSE Hydro is the biggest performance arena ever designed by Foster+Partners. One of the main points of access to the venue is across an elevated walkway. Infill panels for the balustrade were supplied by Lang+Fulton, made from Micro-34 architectural grating; the galvanized finish and rectilinear appearance complimenting the surrounding buildings. Continuity throughout the overall project was achieved with a Roma-3 grating fence and entrance gates to secure the northern perimeter of the site. In addition, a series of Roma-3 compounds were designed for the secure storage of Events Catering deliveries.
Sponsored
Flood Defence Scheme

Flood Defence Scheme

Lochrin Bain Limited

In the summer of 2007 the country witnessed extensive flooding with areas in England experiencing “over two months rainfall in just 14 hours.” Loss of water and electricity supply was experienced with thousands of homes. Providing protection against a 1 in 1000 year flood event involved building over 1 kilometer of reinforced concrete and sheet piled walls. As well as protecting the site from future flooding, the team at RHI Industrials worked in partnership with Lochrin Bain to ensure the security fencing system was fully integrated with the substations new flood defences.
Sponsored
One Tower Bridge, London

One Tower Bridge, London

Buzon UK Ltd

One Tower Bridge is a mixed-use development by Berkeley Homes. A total of nine blocks make up the development, containing 396 residential units, commercial and cultural spaces, a single storey basement area and a 20 storey residential tower block with roof top area. Buzon UK were commissioned by Maylim to supply DPH5 and BC5 adjustable pedestals, which were used across the entire project to support numerous decking areas, fencing, step and riser units and a wide range of bespoke seating. The random shaped pavers required a complex spacer tab layout, achieved effortlessly with the unique BC System.
Sponsored
IWA 14/PAS 68 HVM Terra Bifold Gate

IWA 14/PAS 68 HVM Terra Bifold Gate

Frontier Pitts Ltd

IWA 14 – 7.2t @ 30mph Introducing the latest Terra Bi-folding Speed Gate which has been successfully impact tested to the International IWA14 Specification, stopping a 7.2 ton vehicle travelling at 30mph (48kph). **** Unique to the market this double leaf HVM Bi-folding Gate impact test resulted in minimal penetration *** This HVM Bi-fold Gate is the perfect solution for any building or perimeter fence line bringing together protection from the threat of VBIED’s (vehicle borne improvised explosive devices) and LPS1175 Security Rated Automatic Gates. Double bi-folding gate leaves Hinged Gates leaves can be automated with Actuators.
Sponsored
Etihad Stadium

Etihad Stadium

Lionweld Kennedy Group

Contracted by 'Laing', Lionweld Kennedy were given a package of work for The Etihad Statidum, which is Manchester City's ground.Our team designed the walkways, handrails, platforms, turnstiles and security fencing for the ground. All designed were done with the public in mind, ensuring their health and safety while providing an accessible ground to manoeuvre around. A range of our products were used including Saferail and Safetreads.Etihad Stadium, also known as Eastlands, was built for the 2002 Commonwealth Games. Following the games, the stadium was converted into a football stadium to provide Manchester City with a modern replacement for Maine Road. The club moved into Etihad Stadium at the start of the 2003-04 season.
Sponsored
ZAUN DUO SPORTS RINGS 3G MULTI-PITCH

ZAUN DUO SPORTS RINGS 3G MULTI-PITCH

Zaun Limited

The Rednock School in Dursley in Gloucestershire won the people’s choice and awards for sustainability and architectural excellence in the RIBA Regional Town & Country Awards. Wings emanate from a central red hub, designed to be energy-efficient and natural light and airy.So pioneers of transforming the ‘beacon of sustainable school design’ called in experts to design and install their planned multi-use games area (MUGA) and keep the school open while still pushing forward design boundaries.The SolutionThe 1,400-pupil school turned to artificial sports surfaces specialists AP Thompson and MUGA manufacturer Zaun to provide it with a multi-functional state of the art sports pitch.With limited space and the need to keep open throughout the works, contractors built the new school on the old playing fields then demolished the old buildings to make way for the new MUGA.Zaun recommended its Duo6 Sports fencing with fixings every 200mm instead of 400mm. Each fixing point uses a rubber EPDM insert that insulates the panel from the post and reduces rattle during play to a minimum. This is a solution Zaun has developed for schools to minimise noise from outdoor pitches distracting classes being taught indoors.Clever siting of goal recesses makes the MUGA ideal for a full size international standard football pitch or four concurrent 5 a side matches across the width. In addition, Zaun incorporated gates at strategic locations and 4.4m high fencing behind the goal areas to improve ball retention.After four decades, the reincarnation of the school cost £38 million in total and includes a TV studio able to broadcast live to every corner of the school.
Sponsored
Doncaster Carr IEP Depot

Doncaster Carr IEP Depot

Lionweld Kennedy Group

Lionweld Kennedy supplied and installed both open mesh flooring and GRP light out removeable handrails to 4 twin level access gantries at the 'Doncaster Carr IEP Depot' for Hitachi Rail Group.We supplied and fixed demarcation fencing with integral gates to form the stores area within the facility.Also, we supplied and fixed internal depot protection to fork lift routes, including column protection, bollards and spring steel barrier systems.Using both steel open mesh flooring and GRP handrails was a great cost solution for the client, as we were able to utalise our products to create a safe working environment which is fully compliant with British and European standards.
Sponsored
Britannia Rooftop MUGA

Britannia Rooftop MUGA

CLD Physical Security Systems

The Britannia Leisure Centre, located in Hackney, North London, is a community-focused project spearheaded by Morgan Sindall.This visionary initiative presented an array of complex construction challenges, including the creation of two full-sized five-a-side football pitches and two full-sized tennis courts on the roof, requiring fencing and netting reaching a height of eight metres.The completion of the Britannia Rooftop MUGA project marks a significant milestone for CLD Systems and Perimeter Solutions. The project highlights their ability to overcome complex design and installation challenges, pushing the boundaries of physical security solutions.The Britannia Leisure Centre has received significant recognition and multiple award nominations, including the 2022 RICS Community Benefit award and Architect’s Journal: Community Impact of the Year Award.
Sponsored
Private Residence, London

Private Residence, London

The Outdoor Deck Company Ltd

55 m2 of Grad Thermo Ash 120mm deck boards have been used to great effect by the architects in the modernisation of this semi-detached property for decking, horizontal and vertical cladding, and fencing.At the back of the building, the living space has been extended by the addition of a garden room, joined together by a deck which runs the length of the garden between the two buildings.  Both the main house and the garden room feature a wrap-around canopy and deck.At the front of the property, the extension and entrance porch have been clad in the same material.All of these elements have been seamlessly finished using our invisible-fix system, Grad, in Thermo Ash using the same width board throughout.  This lovely project really showcases Grad and its versatility. 
Sponsored
Compounds, screening and perimeter security at Jaguar Land Rover' new plant

Compounds, screening and perimeter security at Jaguar Land Rover' new plant

Lang+Fulton

Jaguar Land Rover’s new £500 million engine manufacturing facility at the i54 business park is situated close to the M54 motorway outside Wolverhampton.The new plant, which is the size of 14 football pitches, is JLR’s largest investment for in-house engine design and manufacturing in a generation. As it was impractical to install a perimeter fence to provide adequate screening from the motorway, Lang+Fulton supplied 5 separate compounds with double and single leaf gates made from 400 linear metres of Italia-100 louvres:Waste Compound (2.4m high)Chiller Plant Compound (4m high)Data Centre Compound (3m high)Filter Mist Compound (4m high)Smoking Shelter (2m high)Finish: hot-dip galvanized & ppc RAL7016
Sponsored
Cotton Tails - Domiz Standard

Cotton Tails - Domiz Standard

Spanish Slate Quarries UK Ltd

Built in the market town of Sandy, Bedfordshire, Cotton Tails is a prestigious £2.5 million private residential property, the finalist for the RCI Pitched Roofing Awards. The property extends for around 4.8 acres and it includes formal gardens, fenced paddocks, stables, and outbuildings. The incredibly modern five-bedroom mansion offers 6000sq ft of living space characterized by a wealth of attractive features, including an impressive full height reception hall with a floating staircase and enviable underground wine cellar.The Cotton Trails project was managed by Mark Lenn, the landowner, and built by Bartram Timber Frame Buildings Ltd. For the installation of the roof, the landowner selected D Stockwell Roofing Contractor, based upon recommendations, experience, and quality of workmanship. Roofers were instructed to only use high-quality materials to complement the luxurious mansion and interiors of the prestigious property.
Sponsored
West London Platform Extensions

West London Platform Extensions

Lionweld Kennedy Group

Lionweld Kennedy designed, supplied, fabricated and installed extensions to existing platforms in order to accommodate longer trains and add a new emergency end of platform staircase . The platforms we worked on was Shepherds Bush, Imperial Wharf, West Brompton and Clapham Stations.We provided GRP deck, below deck screens, mesh litter screens, end of platform steps, fencing and lockable gates as well as associated handrails, plinths, fixtures and fittings.The GRP deck panel’s increased strength allows spans of 4000mm clear span with a 5kn/m² pedestrian loading.This meets all network rail load requirements and is fully approved and in use.Additional strengthening to the deck was required to accommodate the lighting/CCTV columns shown above.We added white and yellow edge lines and safety lines as well as the tactile pavers moulded to the deck.The gritted anti-slip surface is also ideal for this application where safety is paramount.
Sponsored
Moneyfields, Portsmouth

Moneyfields, Portsmouth

Cellecta Ltd

Moneyfields is football club in Portsmouth which includes a new social club and sports facility Building with housing development of 26 residential units in the form of 14 one and two bedroom apartments and 12 four-bedroom houses. Redevelopment of this part single and two storey building was completed to accommodate the sports and social club with bars, function hall, kitchen, cellar, offices, changing rooms, boxing ring, gym, spectator stand, classrooms, ticket office, tea hut, car park, and a pitch with floodlights and fencing.Cellecta’s Mojave S1-8 was specified by PLC Architects due to it being a high-performance underfloor heating system, offering a dry and robust floor build up from one source.XFLO boards are manufactured to suit the pipe diameter and spacing required to achieve the desired thermal output.Chichester Building and Carpentry Ltd was awarded this 900m² contract to construct this redevelopment in Portsmouth.
Sponsored
Oswestry Golf Club

Oswestry Golf Club

Roché Systems Ltd

THE PROJECTOswestry Golf Club is an award winning golf club situated on the picturesque North Shropshire/North Wales border. Home to a James Braid designed golf course, state of the art clubhouse, and two former Ryder Cup heroes.They have recently increased security for their dedicated Greenkeepers compound. Heightened security included newly installed perimeter fencing, lighting and an insulated T77 double skinned aluminium roller shutter, with electric motor and safety brake.THE CHALLENGEThe client was looking for increased security for their main shed, with the added need for insulation to improve working conditions for ongoing maintenance work through the winter months.THE SOLUTIONThe T77 is a versatile aluminium roller shutter which is suitable for a wide range of domestic, commercial and retail applications. Its 77mm insulated slat rolls into a box as small as 250mm, and a maximum area of 16m² makes this shutter suitable for windows, doors and many other openings. ‘The aim was to give us increased peace of mind for our newest equipment and also a more usable space for the team throughout the year. The install was carried out in a timely and professional manner, and I am delighted with the finished project.’ Gary Barnfield – Head Greenkeeper

Showing 109-144 of 150

Feedback