NBS Source
I'm a manufacturer

Manchester City Etihad Training Complex

OVERVIEW

“We are building a structure for the future, not just a team of all-stars” announced Sheikh Mansour in 2008 with reference to Manchester City Football Club.


Six years and £200m later, Mansour’s vision has been realised in the Etihad Training Complex; an 80-acre site where over 450 players train each week. The site, home to 17 football pitches and a 7,000-seat stadium for reserve matches, is an epitome of innovation and state-of-the-art design that CLD is proud to have contributed to.


The Brief

Creating a world class training complex presents a number of key requirements when it comes to the external, internal fencing systems and physical access control.

  • An external perimeter to LPS 1775 SR1
  • Swing gates with guaranteed delay of at least 3 minutes against attack
  • Fast operation cycle main gates to prevent tailgating
  • Pitch separation that allows clear view
  • Ability to stop balls leaving the training area up to 6m in height
  • Must compliment the Manchester City brand
  • MUGA fencing that can withstand impact from Professional Players
  • Full Operation and Maintanence Schedules Produced
  • CAD Design and ‘as-built drawings’ of all systems used on the project

No featured products in this case study

Contact CLD Physical Security Systems by clicking the button below to find out which products were used in this case study.

More case studies from CLD Physical Security Systems

View all case studies (24)
Major League Baseball London Series

Major League Baseball London Series

Folly Farm Pembrokeshire

Folly Farm Pembrokeshire

5th Avenue New York City

5th Avenue New York City

Inverness COVID-19 Testing Centre

Inverness COVID-19 Testing Centre