You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
DCM Surfaces were thrilled to be awarded the contract to construct this new build MUGA, following a lengthy tender process.
The project included all elements of the build including; excavation of the existing surface, the MOT stone build up, macadam subbase, PCC edges and 1.8m twin rebound wire fence panels around the perimeter.
A 12-15mm of black EPDM was installed direct to the tarmac subbase, and then sprayed with an anti-slip coating.
Coloured line markings were added following the install, to enable multiple games such as; football, netball and basketball to be played.
Contact DCM Surfaces by clicking the button below to find out which products were used in this case study.
Prospect Park Playground - Battersea
Huddersfield Canal
Bellshill Academy
Rushden Lakes Shopping Centre - Northampton