NBS Source
I'm a manufacturer

"delta%20membrane%20systems%20ltd"

378 results found

Sort by:

Showing 1-36 of 78

Sponsored
The Gunnery, Kent

The Gunnery, Kent

Delta Membrane Systems Ltd

The Gunnery, Kent is a unique and interesting project. Delta Membranes were appointed as Waterproofing Designer to transform an unused fort/home in Kingsdown, Kent. The building was situated 92ft on a cliff edge. The Gunnery was originally a military base with extended underground rooms and thought to have ‘secret rooms’ underground. The building had suffered from fire damage as well as vandalism over the years and had been left to ruin. During a site visit various considerations were given to what Delta product would be best suited to the job, given the restrictions imposed by the existing structure.
Sponsored
North London Synagogue - Structural Waterproofing Basement

North London Synagogue - Structural Waterproofing Basement

Delta Membrane Systems Ltd

This project is unusual and offered an interesting scope. Delta was approached to give assistance on designing a robust waterproofing solution to a new build basement within a Synagogue in North London. The main contractor having previously worked with Delta, knew Delta would be able to provide this project with a high calibre waterproofing design whilst offering respect for the community it serves.
Sponsored
Basement and External waterproofing

Basement and External waterproofing

Delta Membrane Systems Ltd

The scope of this ambitious project was to restore and transform an abandoned Neo-Gothic Cemetery Keeper’s Lodge with adjoining public facility into a luxurious mansion in just 12 months.  Works included demolishing the adjoining public facility to enable the construction of a new basement.The proposed new build construction would be a luxury ground floor extension which would run the footprint of the redundant public facility to offer a 4,000 square foot subterrain space with key features such as 13-meter swimming pool, 2 additional bedrooms, a tv games room and office space.Simon Gill Architect designed the ambitious project and was appointed as Project Manager.Delta Registered Installers 5 Star Basements were employed to undertake both dig out and installation of the structural waterproofing with Delta’s Technical Waterproofing Consultant, Paul Callaghan representing Delta. This approach at the design stage, allowed Paul to attend design team meetings and to ensure all criteria’s of BS8102:2009 were met.As aired on Grand Designs on 6th January 2021.
Sponsored
Rose Hall Cottage, Flood Resilience Project

Rose Hall Cottage, Flood Resilience Project

Delta Membrane Systems Ltd

Delta’s design philosophy was to devise a suitable flood resilience measure that would protect this property from the effects of future flooding, like what had previous occurred. Information gleaned from the survey visit enabled Delta to offer a fully effective solution for the intermittent yet long term flooding problem.
Sponsored
Waterproofing Basement Vaults - Leeds

Waterproofing Basement Vaults - Leeds

Delta Membrane Systems Ltd

Delta Registered Installers, Premier Preservations, were approached to offer a waterproofing design and system to a basement, to ensure the vaults – located under the entire footprint of the property were protected from water ingress.
Sponsored
BRE Flood Reilient Test Home

BRE Flood Reilient Test Home

Delta Membrane Systems Ltd

Delta Membranes were delighted to be invited by the BRE in adapting a property which could offer Flood Resilience. A housing unit within the BRE (a Victorian Terrace) was refurbished to demonstrate materials, products and innovations that will make it flood resilient. There are an estimated 5.2 million homes considered at risk from surface, river and coastal flooding. Preventative measures play a key role. The specification for resilience, using the same technology Delta have used for many years in Basements or below ground situations with additional consideration as to how we could adapt this to work in flood situations.
Sponsored
STOCKTON GLOBE - Sympathetic Waterproofing Solution

STOCKTON GLOBE - Sympathetic Waterproofing Solution

Delta Membrane Systems Ltd

Delta’s Technical Team along with Delta Registered Installers Marsden Damp Services were approached by the main contractor Wilmott Dixon to give assistance on designing a robust waterproofing solution. Working in collaboration with the architects and project team, this team of waterproofing experts were easily able to offer a simplistic and practical approach.The project was split into 2 phases with Phase 1 waterproofing the existing stage and orchestra pit and Phase 2, the seating and ancillary rooms which all required the installation of a Type C waterproofing system to ensure a Grade 3 habitable environment was created.
Sponsored
Structural Waterproofing Mixed Commercial Development

Structural Waterproofing Mixed Commercial Development

Delta Membrane Systems Ltd

This project required a robust and a meticulously detailed specification with Delta Registered Installers, Cemplas being appointed waterproofing contractor to guarantee a watertight basement.
Sponsored
Flood Recovery – Grade II Listed Building

Flood Recovery – Grade II Listed Building

Delta Membrane Systems Ltd

Delta products were used at ground level on a semi-detached property in Hertfordshire that suffered from severe flooding. After the flood at the Grade II listed property in Long Marston, restoration experts DJ Hutchings of Towcester was called in, and – in turn – they called upon the services of Peter Cox . Work includes the full strip-out of all wall finishes and the solid floor on the ground floor. Mass underpinning took place to all the external walls. Included in the materials supplied by Delta is the MS500 system applied to all ground floor walls and MS20 on the floors.
Sponsored
Orbis OS211 Glass Balustrades for Blackpool Victoria Hospital

Orbis OS211 Glass Balustrades for Blackpool Victoria Hospital

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixOrbis OS200 Vertical Bar Infill Side FixThe main NHS hospital for Blackpool and the Fylde Coast, Blackpool Victoria Hospital has undergone a £16.4 million upgrade to create a new main entrance and a multi-storey car park.The new entrance includes a pharmacy, retail units, café, main reception, waiting area and office accommodation. Featuring extensive curtain walling, the new main entrance has been designed to maximise natural light and provide a feeling of openness. The use of glass for the balustrades helped to enhance this design style throughout the main feature areas and voids, using Delta Balustrades’ Orbis system.Delta Balustrades also supplied the balustrades and handrails for the main and rear staircases in the new multi-storey car park. Delta Balustrades calculated the loadings for all areas of the hospital installation and specified multiple fixing details for the atrium to accommodate variations in floor levels and construction.
Sponsored
Remedial Basement Waterproofing

Remedial Basement Waterproofing

Delta Membrane Systems Ltd

When it comes to residential, commercial or any structure below ground, waterproofing is a critical component within the construction process for protecting and preserving a building. A poorly designed or installed waterproofing solution can fail leading to significant implications on the structure itself.Delta Registered Installers, Abtech (UK) Ltd were called upon to give assistance on a particularly technically complicated project where approaches to waterproofing design and installation had been incorporated, however the system had failed. For a great remedial waterproofing outcome, seek assistance from an experienced waterproofing company to inspect your site and carry out the remedial work.The property when built had a Type C, cavity drain membrane systems incorporated (not a Delta System), however there was no basement drainage incorporated into the design to manage water ingress.In principle a Type C, drainage system is a water management system. The Type C system is used to control water ingress once it has penetrated the structure.  Moisture or running water travel behind the Type C membrane within a controlled drainage system. A Type C System isn’t classified as a barrier but provides protection by means of water management. For a Type System to be successful a suitable drainage system is required to collect and discharge water ingress to a suitable and safe evacuation point (either by natural forces or a mechanical pump system).When correctly installed, groundwater drainage channels effectively relieve hydrostatic water pressure in the below ground structure. They are installed below flooring membranes at the floor/wall junction.
Sponsored
Structural Waterproofing - Grade II listed Georgian House

Structural Waterproofing - Grade II listed Georgian House

Delta Membrane Systems Ltd

Delta Registered Installers Timberwise (UK) Limited were called upon to offer a waterproofing design to this Grade II Listed property to meet the requirements of BS 8102:2009 to achieve a dry habitable living space, defined as a grade 3 environment.
Sponsored
Public House Cellar Conversion

Public House Cellar Conversion

Delta Membrane Systems Ltd

Delta Registered Installers, Oaks Damp Proofing having previously undertaken work for the client were commissioned to design and install a Cavity Drain Waterproofing system that would meet BS8102:2009 the British Standard for the protection of structures against water from the ground, Grade 3 (no dampness or water penetration acceptable) to the cellar area of The Blonde Hedgehog. The Cellar having been used historically to store beer was not waterproofed historically. Beer cellars are notable for being very cold and wet. For hundreds of years beer cellars were always underground – because underground rooms are generally quite cool.
Sponsored
Luxury North London Residence

Luxury North London Residence

Delta Membrane Systems Ltd

Delta Membrane Systems Limited was asked to assistance on a particularly technically complicated project. The project in question was a new build luxury property in North London, providing almost 17,000 sq ft of accommodation, over four floors.  High volumes of hydrostatic water pressure was bearing on the structure, which was causing the property to suffer severe water ingress through construction joints. The property when constructed was built at a low level, it sits lower than the neighbouring properties adding to the hydrostatic water pressure issue.  An additional problem was the property had been built without a waterbar/hydrophilic strip.
Sponsored
Orbis OS221 and Mono M310/M311 for Greenhead College

Orbis OS221 and Mono M310/M311 for Greenhead College

Delta Balustrades Ltd

Products:Externals: OS221 Orbis Midrail Infill Top FixAtrium: M311 Mono Glass Infill Top FixStairs: M310 Mono Glass Infill Side FixContractor: Galliford Try Construction LtdArchitects: Ryder ArchitectureThe £25m redevelopment of the Greenhead Sixth-Form College Campus was one of the first Net Zero Carbon in Operation school buildings built by the Department for Educations Rebuilding Programme.Galliford Try Construction enlisted Delta to fulfil the requirements of this balustrade and handrail package – totalling 280 metres of balustrade system.With Greenhead College situated within the Greenhead Park Conservation Area and in close proximity to historic buildings, the more traditional tubular Orbis powder coated balustrade with midrail’s was installed to the external steps.Whereas a more sleek, modern aesthetic was decided upon for the atrium and stairs in the form of Delta’s Mono powder coated balustrade with stainless steel handrails and glass infill secured with a bolt-through banjo lug.
Sponsored
Orbis OS211 and OS200 Balustrades Create Impactful Stair at Pencoedtre High School

Orbis OS211 and OS200 Balustrades Create Impactful Stair at Pencoedtre High School

Delta Balustrades Ltd

As experts in supplying balustrades to the Education sector, Delta’s powder coated Orbis balustrades with glass infill created an impactful and eye-catching feature stair and communal space for pupils.Delta also installed powder coated Orbis balustrades with vertical bar infills on the stairs.The construction of Pencoedtre High School by Bouygues UK was part of the £34m investment by the Vale of Glamorgan Council and Welsh Government.The three-storey building with state-of-the-art facilities was built to accommodate 1250 pupils and as part of the 21st Century Schools programme to transform educational facilities.
Sponsored
Basement Renovation

Basement Renovation

Delta Membrane Systems Ltd

Shooters Sports bar is a modern sports bar located in Neath Town Centre, a principal area of Port Talbot, Wales.  A popular venue, well known for its 6 screens showing live sports, licensed bar and pool, American pool and snooker tables.Delta Registered Installers, Tywi Damp Proofing were first approached to offer remedial assistance with a section of wall which was experiencing severe water ingress.The structure being of reinforced concrete and old wall construction was allowing water ingress via cracks in the structure.Most faults in older structures which allow water ingress are either damaged or deteriorating mortars.Any cracks in the brickwork or substrates will also allow water to enter a structure and would need addressing in creating a Grade 3, habitable space under BS8102:2009 “Code of practice for protection of below ground structures against water from the ground”.Prior to proposing remedial works, ground water assessment, drainage and associated risk assessments were all undertaken.
Sponsored
The Hub, Hattersley - Leaking Podium Deck

The Hub, Hattersley - Leaking Podium Deck

Delta Membrane Systems Ltd

Delta were employed to assist on this leaking podium deck project. Following a full assessment of The Hub and its underground parking facilities it was identified that rainwater was entering the basement car park through the ceiling deck at multiple points. These points included holes that were formed to allow drainage from the surface, movement joints and investigation holes that had been created through the steel rib and concrete deck. Based on “as built plans” a system was designed post construction that would offer the same quality of structural protection had it been incorporated during the build phase.
Sponsored
Solar Shading and Delta 150 Gutter at Lymington Shore

Solar Shading and Delta 150 Gutter at Lymington Shore

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Lymington, HampshoreProject Type: HousingDevelopment Cost: £80mProduct: Shadex 150 Raking: First Fix Brackets (Thru Render)Shadex 190 Drop-in Cassettes (Structural Steel Supports)Aluminium Plain FasciaDelta 100 GutterDelta 150 Gutter100mm Round Contemporary Rainwater PipeMeridian Wall CopingFinish: Syntha Pulvin RAL 7000 Matt Squirrel Grey: Marine SpecificationFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Redrow Homes LtdArchitect: AAP Architecture LtdMain Contractor: Redrow Homes LtdSub Contractor: Stafford Rainwater Systems Ltd
Sponsored
Damp Remedial Solutions

Damp Remedial Solutions

Delta Membrane Systems Ltd

Chepstow is a beautiful town and community in Monmouthshire, Wales. Located on the tidal River Wye, roughly 2 miles before the confluence of the River Severn. Steeped in history, Chepstow’s Great Tower keep was commissioned by William the Conqueror following the Battle of Hastings.With high ceilings and spaces which feel luxurious there is simply something that draws us towards the vast expanse of space and the warmth offered by listing buildings such as converted barns and farmhouses, often because of their idyllic rural locations.Delta Registered Installers, Tywi Damp Proofing were commissioned with the sympathetic conversion of an old farmhouse located in Chepstow. The project scope was to convert 1 listed farmhouse into 5 separate dwellings.Original features, such as 5ft thick walls were embraced in this conversion project.During initial inspections, penetrating damp was found. Penetrating damp is often referred to as lateral damp, which is the development of moisture through walls, roofs or any ground area of a structure. If left untreated this penetrating damp will cause problems for the structure envelope and can lead to significant damage to the fabric. Penetrating damp can be caused by a combination of problems such as the structure’s age, construction and exposed location.
Sponsored
Future Proofing Waterproofing Multi Level Commercial New Build Structure

Future Proofing Waterproofing Multi Level Commercial New Build Structure

Delta Membrane Systems Ltd

Delta’s Structural Waterproofing Consultant, Paul Green, CSSW alongside Delta’s MD, Kevin Dodds, were appointed to the design team to collaborate with the Architects, Engineers, Main and Sub-Contractors to fulfil the role of Waterproofing Design Specialists in providing a reliable, watertight solution for this substantial project.The large-scale basement project consists of a 4-storey deepbasement located close to the River Thames in Central London.The proposed subterranean space would offer multiple usage. This complex project required a waterproofing design which is, able to cope with intermittent/regular hydrostatic pressures created not just by groundwater, but also geographical tidal impacts from the river Thames and potential stress challenges caused by the surrounding infrastructure such as heavily trafficked railway lines in the development’s vicinity.Structures that experience a high level of vibration fromsurrounding infrastructure can, over time, have a high propensity to suffer cracks, which could lead to failure of some waterproofing solutions, so therefore careful considerations should be incorporated into the overall waterproofing design from those aspects and, the impacts these factors can have on an elected waterproofing system.Delta’s design philosophy rotated around creating a robust and suitable waterproofing design, the structure design, a continuous system, sequencing and installation, future maintenance, and serviceability, whilst able to fulfil requirements set out in BS 8102:2022 Protection of below ground structures against water ingress. Code of practice. The British Standard which governs waterproofing of substructures.
Sponsored
Orbis OS211 Create Luxury Aesthetics at Brio Retirement Living

Orbis OS211 Create Luxury Aesthetics at Brio Retirement Living

Delta Balustrades Ltd

Stepnell Ltd selected Orbis balustrades with glass infill to fulfil the vision of a luxury retirement living community at the £29m Brio Retirement Living project, Beechwood Park.Designed with a wide range of community facilities and communal areas, Delta supplied over 600m of balustrades for the balconies and stairs.The project has since been awarded the Building Research Establishment Environmental Assessment Method (BREEAM) “Very Good” standard rating and BRE HQM (Home Quality Mark) Level 3.
Sponsored
Vista V510S, Mono M311 and Orbis OS211 for Alder Hey Children's Hospital

Vista V510S, Mono M311 and Orbis OS211 for Alder Hey Children's Hospital

Delta Balustrades Ltd

Products:Stairs: OS211 Orbis Glass Infill Top FixCourtyard Podium: M311 Mono Glass Infill Top FixCone Glazing: V510S Glass Infill Fascia Mount Side FixContractor: Galliford TryArchitect: 10architectDelta were proud to work alongside Galliford Try and 10architect to supply balustrades and handrails to the new community cluster on behalf of Alder Hey Children’s NHS Foundation Trust.The £15m development included the construction of a new build facility that provides space for mental health and neurodevelopmental outpatient facilities and a 12-bed specialist inpatient mental health unit.Community Cluster forms a key element of the growing Alder Hey campus, the facility brings a centre of excellence for Children’s health closer to nature within a newly created landscape.Delta’s structural glass range, Vista, helped to materialise the architects vision for the unique cone glazing design.
Sponsored
Mono Balustrades for Oldham Academy North

Mono Balustrades for Oldham Academy North

Delta Balustrades Ltd

Mono M311 Glass Infill Top FixMono M351 No Infill Top FixOrbis OS200 Vertical Bar Infill Side FixPart of a £71 million scheme to construct three new academy schools in the area, Oldham Academy North was designed by Manchester-based architects, Aedas and constructed by Willmott Dixon.The school features a striking glass frontage for the triple height atrium reception with a brick clad teaching block to one side and a vibrant purple frontage to the other. The feeling of light and space created by the school’s two atriums is carried through by HiBuild coated Mono system balustrades with stainless steel handrails. These enable the creation of safe viewing galleries/walkways, overlooking the open plan library mezzanine and the central ‘Agora’ theatre space.The same system was used to create the handrails for the school’s six staircases, maximising natural light and enhancing transparency as students and staff move around the building. Delta Balustrades worked collaboratively with the design team to ensure that the balustrades and handrails not only meet the aesthetic requirements for the scheme but that the fixing detail for the atriums fully comply with loading requirements.
Sponsored
Duo D411 Glass Balustrades for Royton Health and Wellbeing Centre

Duo D411 Glass Balustrades for Royton Health and Wellbeing Centre

Delta Balustrades Ltd

Duo D411 Glass Infill Top FixOrbis OS230 Perforated Infill Side FixThis project included a high spec balustrade to feature stair including extra height glass to waiting areas. The choice of DelamereX gave a natural hardwood look along with durability and low maintenance. An additional three staff staircase balustrade and handrails in standard HiBuild finish and perforated infill panels were also included.Throughout the project, close liaising was needed with the Architect to ensure all necessary design requirements were adhered to and approved. Delta Balustrades installation of the feature stair and balustrades was phased to synchronize with the onsite program.
Sponsored
Orbis Balustrades for Sapphire Ice & Leisure

Orbis Balustrades for Sapphire Ice & Leisure

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixOrbis OS231 Perforated Infill Top FixOrbis OS200/OS201 Vertical Bar InfillBorn from Havering Council’s vision to improve the sports and fitness facilities available in the borough, the £28 million investment is set to be a catalyst for regeneration in Romford.Named in honour of the Sapphire anniversary of Queen Elizabeth ll’s reign, the centre comprises of an eight-lane competition pool, gymnasium and first floor 56m by 26m ice rink.Appointed by contractors Willmott Dixon, Delta Balustrades were responsible for the supply of 579m’s of balustrading and 246m’s of handrails throughout the entire complex.With two extreme environments coexisting the specifications for the balustrade finishes were of upmost importance.Balustrades and handrails in the warm, chlorine filled air of the swimming pool environment received our Ultra (Marine) finish, providing a bright polished surface to prevent corrosion.First floor ice rink balustrades received our HiBuild powder coating finish, which boasts a ‘warm to touch’ feature that doesn’t allow the transfer a cold environment to bare hands.A visually striking, stainless steel staircase with perforated panels connects the floors within the ceiling void atrium spanning four floors.
Sponsored
Mono Glass Balustrades for 'The Ark', St George's Primary School

Mono Glass Balustrades for 'The Ark', St George's Primary School

Delta Balustrades Ltd

Mono M310/M311 Glass InfillSt George’s junior school is an independent Roman Catholic school with a high standard of facilities. Construction of ‘The Ark’ provided a new early years teaching block, which includes modern classrooms, a dedicated IT suite, a new assembly room and outdoor learning areas. The two-storey building has a staircase at each end and Delta Balustrades’ Mono™ system was specified with powder-coated steel balusters and 11.5mm toughened and laminated glass infill panels. The Mono™ system handrails were provided in oak to offer a warmer finish in the primary school environment and each staircase features a dual handrail with one handrail mounted at a 600mm height for the children and the other in parallel at 900mm for the teachers. The Ark features an outdoor teaching area at first floor level with a balcony accessed from the internal classrooms. Once again, Delta Balustrades’ Mono™ system was specified with powder coated balusters to match the grey of the window casings. The 11.5mm toughened and laminated glass infill panels have no handrails but have been installed at a height of 1500mm to provide additional edge protection. A further small triangular balcony at the side of the building has been specified with the same system as the main first floor balcony. At ground level, the building features steps and ramps and a combination of Mono™ balusters and Orbis™ handrails with a Sigma stainless steel finish have been used to provide guarding, with 10mm toughened glass infill panels.Finally, the stone steps leading to the nursery classrooms were specified with an Orbis™ handrail.
Sponsored
Commercial to Residential Basement Conversion

Commercial to Residential Basement Conversion

Delta Membrane Systems Ltd

Commercial to residential, it may be last orders for some of our great British pubs, for other’s its discovering exciting ways of transforming commercial structures into luxury residential dwellings.  The growing trend of converting old inns offers new homes a unique history whilst being packed with character and features.Delta Registered Installers, Advance Property Preservation Ltd were engaged to assist on a troublesome vaulted basement to a property, based in central London which had already been converted into high living accommodation.Just off the basement area were two large vaults around 12m long. Made from brick barrel construction, this below ground space had previously used for storing kegs of ale!One of these vaults had previously been converted into a spa area with jacuzzi and steam room, the other was used as a storage area. The owners had previously had the storeroom tanked with a Type A, render system, however this approach repeatedly failed, allowing for substantial water ingress which was causing damage to items stored in this area.With Structural Waterproofing one of the major contributors to project failure lies with the design. When hiring contractors, ensure the design, procurement of materials and installation is undertaken by one specialist will naturally reduce these known and associated risks. A specialist contractor will always be able to offer quality assurances.
Sponsored
Remedial Waterproofing - Commercial Structure

Remedial Waterproofing - Commercial Structure

Delta Membrane Systems Ltd

Waterproofing design is a key and critical component for successful construction of below ground structures. Whether it’s a completely new build or making smaller changes to an existing property, waterproofing design should never be overlooked.Waterproofing might account for just a small fraction of a building’s total cost, but waterproofing defects can result in catastrophic consequences. When waterproofing fails, the implications are significant.Delta’s MD, Kevin Dodds was approached to offer advice and guidance on a failed waterproofing system.The existing structure had an impressive 5-level basement which houses: kitchens, food storage and food preparation areas, spa, plant rooms and accommodation. Near to a large river, the site sited well within the water table. The original waterproofing system was based on the secant piled walls and a block wall internally to provide a basic drained protection system with drainage holes at various points to drain to various levels.Over time, the third floor had become completely saturated with all levels of the basement experiencing water ingress in varying levels from damp patches to significant “jets” of water and flows of water through the secant piles.With remediation waterproofing design strategies, it may take some time to specify a suitable system. It is important that investigations are thoroughly carried out by individuals with the capability of diagnosing the defect, assessing the extent of that defect, and recommending a suitable corrective measure.
Sponsored
Duo D410, D411 and D431 Balustrades at Stockland Green College

Duo D410, D411 and D431 Balustrades at Stockland Green College

Delta Balustrades Ltd

Duo D410/D411 Glass InfillDuo D431 Perforated Infill Top FixDelta Balustrades were pleased to play a part in of the large Birmingham BSF Scheme with the completion of several hundreds of metres of balustrades in this new build project. Balustrades were installed to far reaching street areas with feature stairs leading to 2nd floor. Continuing across atrium bridge links on both 1st and 2nd floors, several staircases, and external terraces the Duo system provided a focal point for the building.In line with Birmingham City Council’s requirements for schools, guarding to atrium edge and external terrace was required to be 1500mm high above FFL. A number of special access gates were required to match adjoining balustrades.
Sponsored
Type C, Cavity Drainage Waterproofing

Type C, Cavity Drainage Waterproofing

Delta Membrane Systems Ltd

Delta Registered Installers, Bensleys provided a waterproofing solution on an iconic Brighton structure.Steeped in history and thought to be built on the original Brill Baths site, sits Clarendon Mansions. This large, detached structure is thought to have been built in 1870 by Charles Brill during the Brighton boom.The four-storey building facing Brighton’s famous sea front, was originally constructed as a hotel.Numerous refurbishments over subsequent periods of time, saw the structure move from a hotel to a public house, with the basement area being unoccupied for nearly a decade.The basement area boasts large, vaulted areas to the south and west elevation, with the south-side possibly being part of the original Bath structure.Bensleys were instructed by the main contractor, Pilbeam Construction on behalf of Evolution Architects, to help design, specify and install the waterproofing system.There’s no one-size-fits-all when it comes to waterproofing design. With the basement suffering from water penetration, Bensleys worked with the design team at an early stage of the project to ensure the right approach be taken, which included multiple factors such as: customer requirements, standards, robustness, cost, resources, time, skill required, safety and expectations of ground water which all translated into a design solution.
Sponsored
Mono Glass Balustrades for Southport Community Fire Station

Mono Glass Balustrades for Southport Community Fire Station

Delta Balustrades Ltd

Mono M311 Glass Infill Top FixOrbis OS211 Glass Infill Top Fix As part of the North West Fire PFI scheme, the Southport Community Fire Station provided improved facilities for Merseyside Fire and Rescue Service and the North West Ambulance Service.The client’s main objectives were to create well designed facilities to a high architectural standard and provide a safe and healthy environment. Designed and built by Balfour Beatty Construction, this new 6 bay station included community-orientated facilities, training facilities, rest rooms, additional office space and two staircases.In line with the client’s vision, Delta Balustrades were appointed by Balfour Beatty to design, supply and install handrails and balustrades to both staircases and an external balcony area. Combining a minimalistic look and feel with a high quality stainless steel finish, the Mono system with clear glass infill panels was chosen for the main staircase. For the rear stair and external areas, the Orbis system with powder coated uprights was chosen.
Sponsored
Mono M311 Glass Balustrades for Park Brow Primary School

Mono M311 Glass Balustrades for Park Brow Primary School

Delta Balustrades Ltd

Mono M311 Glass Infill Top FixThrough the early design stages of this impressive project, Delta Balustrades worked closely with the Liverpool based architects to develop the specification, design and technical details of the balustrade system.As one of the main features of the building, the Mono balustrade system to stairs, atriums, and external terraces with its minimalistic and subtle appearance, transformed the architect’s vision into reality.To meet requirements for buildings designed for children a lower handrail at 600mm above pitch line was required to the stair balustrades and the glass infill panels were required to extend to 1500mm above FFL and stair pitch line.On site close cooperation with the main contractor was necessary to conceal the baluster fixings below the finished floor level in line with the architect’s specification. Externally, this required an early fix of the balustrades without the glass infills, to enable the contractor to complete the waterproofing in view of subsequent trades progressing.
Sponsored
Waterproofing Solution BS 8102:2009

Waterproofing Solution BS 8102:2009

Delta Membrane Systems Ltd

The scope of the project was to facilitate a waterproofing solution for a substantial brick built detached property with a large 3 elevation basement situated at the bottom of a steep sloping driveway. The basement when constructed had 1 form of external waterproofing incorporated during the build stage, however the system required a second form of internal waterproofing due to the location of the structure and high-water table, capable of protecting the luxurious basement from unwanted water ingress.The property’s driveway significantly slopes from street level to the front elevation of the property requiring a specialist waterproofing system to protect the structure.Working in conjunction with the homeowner, Timberwise’s CSSW qualified waterproofing surveyors specified a Delta Type C (Drained) Protection waterproofing system to provide the necessary Grade 3 (habitable environment) to enable to homeowner to fully utilise their basement space. For Grade 3 habitable environments, two types of waterproofing may be required.A Waterproofing Designer’s philosophy defines what they wish to accomplish in the design of their waterproofing system and which principles they will use to do so. Identifying a robust and suitable design philosophy is an important aspect when designing a continuous system, as this will not only directly impact in how users install the system but also in future maintenance which will directly impact on the property owner.
Sponsored
Orbis OS210/OS211 Glass Balustrades at Eastbourne College

Orbis OS210/OS211 Glass Balustrades at Eastbourne College

Delta Balustrades Ltd

Orbis OS210/OS211 Glass Infill Side and Top FixThe Eastbourne College Project 150 delivered a sports hall, competition pool, fitness suite, squash courts, dining and common rooms, pavilion and 32 classrooms, while also providing connections between key College facilities. The development, to mark the college’s 150th anniversary, enabled the Eastbourne College to take a giant leap forward providing several high-quality facilities in one substantial build. Delta Balustrades worked with the architect from early concept design stages and provided technical expertise and advice. The Orbis balustrade system throughout provided a consistent glass balustrade style throughout the building and could be utilised for the external pavilion areas also. Whilst mainly throughout new build areas of the college, the look and style of the balustrades was especially important to complement the College’s iconic buildings and environment. Due to the proximity to the sea, special attention had to be given to the materials and finishes for the external balustrades, and 316 grade stainless steel with a Lustre bright polished finish was required to be suitable in a marine environment.
Sponsored
Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixThe Birkenhead Community Fire Station was completed in 2013, as part of the North West Fire PFI scheme, a framework of 16 fire stations across North West England. The client’s main objectives were to provide a safe and healthy environment with improved facilities for firefighters and other personnel.Following demolition of the existing fire station, the design and construction of this multi-appliance station, led by Balfour Beatty Construction, included community orientated facilities, training facilities, rest rooms, additional office space and two communal staircases. At early design stages, Delta Balustrades worked closely with Balfour Beatty to meet the client’s objectives of creating well designed facilities to a high architectural standard. The Orbis system was chosen as a cost-effective, high-quality tubular balustrade solution for both staircases.The main stair boasted a brushed stainless steel finish with unique Banjo glass fixings. Savings were made on the rear stairs by selecting powder coated uprights and D type glass fixings.

Showing 1-36 of 78

Feedback