Delta were employed to assist on this leaking podium deck project.
Following a full assessment of The Hub and its underground parking facilities it was identified that rainwater was entering the basement car park through the ceiling deck at multiple points. These points included holes that were formed to allow drainage from the surface, movement joints and investigation holes that had been created through the steel rib and concrete deck.
Based on “as built plans” a system was designed post construction that would offer the same quality of structural protection had it been incorporated during the build phase.